5. Installation 

1.  Align and machine the mounting holes on the platforms to secure the upper and 

lower mount fixtures, and on the brackets for a tank. 

 
2.  Insert a jack between the platform and tank and raise the tank to install the weigh 

module. 

 

3.  While aligning the platform, the bracket on the tank, and the weigh module, lower 

the tank and attach the weigh module temporarily using the bolts. 

 

4. Confirm that there is a clearance between the stopper bolt of the 

anti-vibration/lift-off protection stopper unit and the upper mount fixture. If the 
stopper bolt and the upper mount fixture are in contact, raise the tank slightly and 
fine adjust the position of the upper or lower mount fixture. 

 
 
 
 
 
 
 
 

 Confirm that there is a clearance as 

shown to the left. 

 If the stopper bolt is in contact with the 

upper mount fixture, fine adjust the 
position of the upper or lower mount 
fixture. 

 

5.  Confirm that the load cell stands perpendicularly. If it is tilted (to an angle of ±1°, 

great enough to identify by visual inspection), raise a tank slightly and fine adjust 
the position of the upper or lower mount fixture. At this time, pay close attention 
to the clearance around the stopper bolt. 

 
6.  Remove the jack. Secure the weigh module using the bolts 

 

7.  If the stopper bolt was removed for convenience when installing the weigh 

module, attach it so that there is a clearance of 5 mm between the bolt head and 
the upper mount fixture as shown below. Fasten the nut securely so that it will 
not become loose. 

 
 

 
 
 
 
 
 
 
 
 
 

Stopper bolt 

Upper mount fixture

Clearance 

Clearance

Make sure that the clearance is 5 mm. Fasten
the nut securely so that it will not become loose. 