3 INSTALLATION
Pag. 14 di 37
10.
Insert the forks.
11.
Lubricate the contact parts.
12.
Connect the hydraulic circuit; making sure that the operating pressure of the pipes is higher
than or equal to that indicated on the identification label (
ISO 2328
THREAD
TORQUE
ISO II
M12
90 Nm
ISO III
M14
140 Nm
ISO IV
M16
220 Nm
Tab 4
Picture 8