3 INSTALLATION
Pag. 11 di 33
7.
Screw the two bottom hooks
G
with bolts so that the attachment is safely mounted on the
fork carriage
P
(with a tolerance max. 1,5mm,
), reaching to the following torques
8.
Install the forks.
9.
Lubricate the contact parts.
10.
Connect the hydraulic circuit; making sure that the operating pressure of the pipes is higher
than or equal to that indicated on the identification label (
ISO 2328
THREAD
TORQUE
ISO III
M14
140 Nm
ISO IV
M16
220 Nm
Tab 3
Picture 5
Summary of Contents for 675
Page 1: ...atib com I D02 01 53 Rev 2 INSTRUCTIONS MANUAL FOR USE FORK POSITIONER TYPE 675 676 ...
Page 3: ...Pag 2 di 33 8 BREAKDOWNS AND SOLUTIONS 31 8 1 Breakdowns and solutions 31 8 2 Lubrication 32 ...
Page 6: ...2 INTRODUCTION Pag 5 di 33 2 2 Description of equipment TYPE 675 TYPE 676 ...
Page 18: ...4 HYDRAULIC SYSTEM Pag 17 di 33 TYPE 675 ISO IV POWER SUPPLY CYLINDERS Picture 13 ...