R-30 RM
Important note:
In case of high upstream pressure,
carefully monitor the downstream
pressure while opening the
downstream isolation valve; make sure
not to expose the pipeline to excessive
pressure.
2.3. Initial Start-up - The Control Valve
1.
Make sure that the upstream and the downstream isolation valves are closed [
2
] and [
2
A].
2.
Slowly open the upstream isolation valve [
2
].
3.
Check for leaks; tighten bolts & fittings, if necessary.
4.
Turn the 3-way selector [
3
] to its “AUTO” position.
5.
Open the downstream isolation valve [
2
A]; Make sure there is water demand downstream.
6.
Turn the adjusting screw [
4
A] clockwise until the downstream pressure reaches the required level, water starts to
flow to the pipeline.
7.
Gradually continue to open the downstream isolation valve [
2
A], until it is fully opened.