![A.O. Smith UB-110 Installation And Service Manual Download Page 11](http://html1.mh-extra.com/html/a-o-smith/ub-110/ub-110_installation-and-service-manual_447359011.webp)
Installation and Service Manual Upsilon-Series
11
5
Installation and mounting
Install the boiler in a well-ventilated boiler room in accordance to the actual
regulations.
The installation location of the CH-boiler(s) has to be, and remain, frost-free.
It is NOT necessary to have a purpose provided air vent providing a twin pipe or
concentric room sealed flue system is used in the room or internal space in which the
boiler is installed. Neither is it necessary to ventilate the compartment in which the boiler
is installed, due to the extremely low surface temperature of the boiler casing during
operation. Therefore the requirements of BS 6798, Clause 12, and BS5440:2 may be
disregarded.
The floor has to be flat and level and have sufficient deadweight capacity for the complete
(filled) installation.
The Upsilon cascade can be mounted in 3 ways:
- Wall-mounted in line
All boilers alongside one another on the wall
Refer to chapter 5.1 and 5.4
- free-standing in line
All boilers hanging alongside one another on a free-
standing frame.
Refer to chapter 5.2 and 5.4
- free-standing back-to-back. All boilers hanging back-to-back on a free-standing
frame.
Refer to chapter 5.3 and 5.4
General guidelines:
Pay attention to the minimum distance required between the boilers, walls and
ceiling for installing and removing the housing (refer to fig. 5.a.) for commissioning
and servicing and installing the flue system (refer to chapter 7).
Figure 5.a
measurements in mm
wall or frame
ceiling
*
460
400
600
50
50
*
Individual flue: min. 400mm
Collective flue: dependant from selected
flue sytem. Please contact the supplier