Fig. Gas control valve pressure adjustment
IMD-1096b R0
7.8.4
CO
2
adjustment
To check the CO
2
value under full load and partial load and to adjust it if necessary,
proceed as follows:
Isolate the appliance from the power supply (see section 4.2.2).
Carefully remove the covers from the appliance.
The electrical section is now visible.
Place the CO
2
meter's measurement probe in the test nipple (58) of the flue gas
outlet pipe (the number is a reference on the General working principle of the water
heater (see section 5.1)).
Open the gas supply and vent the gas supply line.
Use the
main switch
to apply mains voltage to the appliance.
Start the appliance (see section 4.1).
Go to the
[
]
SERVICE OPERATION menu.
Generate a heat demand by draining the appliance until it is cold or by raising the
value for T
set
in the SERVICE menu. Use
[ ]
for this.
Full load measurement
From the service menu, select:
SERVICE OPERATION | FULL LOAD
Confirm with
[ENTER]
.
The appliance is now in
FULL LOAD
mode and will ignite.
The appliance is now running at
FULL LOAD
. Read the value from the CO
2
meter
and wait until this measured value has remained stable for some time. This may take
several minutes.
Then compare the measured CO
2
value against the value from the table (see section
12.3).
The CO
2
value at full load must be within ±1.0 vol% of the CO
2
value stated in the
table.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
-
-
11.
12.
0311704_BFC_28-120_III_
ENEN_V2.4, 2022-10-17
71
Summary of Contents for BFC Cyclone
Page 6: ...6...
Page 13: ...User part 0311704_BFC_28 120_III_ENEN_V2 4 2022 10 17 13...
Page 14: ...14...
Page 16: ...16 User part...
Page 18: ...18 User part...
Page 24: ...24 User part...
Page 41: ...Installation Maintenance and Service part 0311704_BFC_28 120_III_ENEN_V2 4 2022 10 17 41...
Page 42: ...42 User part...
Page 46: ...46 Installation Maintenance and Service part...
Page 52: ...52 Installation Maintenance and Service part...
Page 59: ...Fig Venting systems 0311704_BFC_28 120_III_ENEN_V2 4 2022 10 17 59...
Page 76: ...76 Installation Maintenance and Service part...
Page 78: ...78 Installation Maintenance and Service part...
Page 84: ...84 Installation Maintenance and Service part...
Page 102: ...Fig Dimensions BFC 28 30 50 60 102 Installation Maintenance and Service part...
Page 104: ...Fig Dimensions BFC 80 100 120 104 Installation Maintenance and Service part...
Page 112: ...12 7 Declaration of conformity 112 Installation Maintenance and Service part...
Page 113: ......
Page 114: ......
Page 118: ...116 Installation Maintenance and Service part...