NEED HELP? GIVE US A CALL
877.333.7108
INSTALLATION GUIDE
6
Ground
Clamp
Ground
Clamp
Ground Wire
ELECTRICAL SHOCK HAZARD
Prior to installation on metallic plumbing, securely install two grounding clamps and a #4
copper wire per installation instructions. Failure to follow these instructions can result in
death or electric shock.
WARNING
Incoming
water supply
Outgoing
water supply
OUT
IN
Cut along marks
made in Step 3
STEP 3
Install Shut-Off Valve (Cont. from previous page)
COPPER PIPES ONLY (proceed to Step 4 for PVC Pipes)
When installing on metallic plumbing, ensure you take the following precautions.
Securely install two (2) grounding clamps and a #4 copper wire (not included) across the
location where the system will be installed. Tightly clamp at both ends, as shown below.
4. Cut pipe and clean ends of pipe.
Ensure there are no burrs, sharp
edges or deep scratches.
Note: Cut tubing as straight as possible
with a utility knife, or an appropriate
pipe cutter for copper tubing or PVC.
5. Fit whole house
filter onto pipe.
Ensure the “IN”
port is connected
to incoming water
supply line.
STEP 4
Flush and Check for Leaks
Once installation is complete, slowly turn water on and inspect for leaks. After
inspecting for leaks, turn on the faucet closest to the installed unit and allow
water to run for 5-10 minutes for the final flushing period.
Note: Do not drink flushed water.