INSTALLATION GUIDE
3
NEED HELP? GIVE US A CALL 877.333.7108
STEP 3
Reconnect Tubing and Install New Remineralizer
1. Insert the white 3/8" hose attached to
the faucet into the outlet connection of
the new Remineralizer by pressing the
hose in until it stops.
2. Connect the remaining hose end
(which has the opposite end connected
to the RO Manifold outlet labeled
“Faucet”) to the inlet portion of the
Remineralizer by pressing the hose in
until it stops.
Note: Be sure both tubes are inserted all
the way.
STEP 4
Flush and Check for Leaks
1. Turn off the dedicated faucet and turn on the cold water supply. Allow water tank to
refill completely.
Note: It will take 2 hours for the water tank to refill.
2. Once the tank has completely filled, inspect for leaks. If there are no leaks, flush the
remineralizer cartridge by turning on the dedicated faucet and allowing water to run
through the system until there is no pressure coming coming out of the dedicated
faucet.
Note: Do not drink flushed water.
3. Turn off the dedicated faucet and allow 2 hours for the pressure to build in the system.
Once complete, your system is ready for use.