Page 2 of 11
Planning Guide – Version 1.0 www.75F.io
(651) 998-4080
Installing the Smart Dampers
7.
Install the smart dampers and run the harness to the location directly above
the WRM it will be associated with.
8.
Run the power supply and the damper harness down the wall and through the
Hole in the wall.
System Set Up
9.
At each WRM location, pull the power supply and damper harness through
the sub base and install it in the hole previously cut into the dry wall. Screw in
the WRM to the sub base and snap on the faceplate.
10.
When everything is wired, turn on the power supply.
11.
Register the CCU and configure initial settings as described in the
75F CCU Installation Guide
. Be sure to test
each function of the RTU to be sure the harness wires are installed correctly.
12.
At this point, all WRMs should be reading “Up Dn” on the screen.
13.
Press the Up and Down button at the same time to begin the damper speed calibration sequence. The WRM
will count down from 300 seconds and then read “AC” when completed.
14.
Press the Up and Down button again and the screen will show “AA”
on one WRM at a time
, then pair it with the CCU.
15.
Repeat until all WRMs are paired.
Portal Set Up
16.
Customize the online Facility Manager Portal:
a.
Upload a PNG or JPG of the floorplan to the online portal. Associate each WRM with its location on the floorplan
b.
Customize the zone and system schedules
17.
Using the online Installer Portal, customize the portal with:
a.
Customer contact information
b.
Alarm recipients
c.
Equipment details