
This manual is the property of
. No part of it may be reproduced in any form.
ECO Line Compressors Instruction Manual
5 - 02
Now start the compressor by turning the switch or pressing the button (depending on the
model, see Page
2-02
- Fig 1 - 2 - 3) located on the pressure switch (Fig. 1), except for the
TOP
model, on which the button is located on the front panel (Fig. 2).
1
2
In the filling cycle the compressor reaches
8.5
bar.
At this point, close the line valve (Fig. 3 - 4
- 5 - 6) for around
30
minutes to check for
possible internal leaks on the compressor.
Open the valve (Fig. 3 - 4 - 5 - 6), with the
chair or laboratory connected and with no
instruments operating, and check that the
pressure reading on the gauge remains
constant, thereby establishing the absence of
air leaks in the circuit.
4
5
3
6