
WARNING
If the system does not immediately shutdown as expected or alarm as required, then remove the
machine from service until the problem has been diagnosed and corrected.
TESTING AND COMMISSIONING
1. Check that the unit is correctly installed (see standard wiring diagram).
2.
After going through the sensor calibration steps, the red LED should be “ON”.
3. Introduce material to the Binswitch. If calibrated correctly, the Binswitch will activate when material
has been detected. Machinery shut down will depend on your specific monitoring setup. 4B
recommends an instant shutdown when maximum fill level or a plug condition has been detected.
PAGE 9
TROUBLESHOOTING GUIDE
FAULT
REMEDY
Unexpected Operation
Re-calibrate sensor, if problem continues contact 4B.
False / Inconsistent Readings
1.
Check that sensor is not in the direct flow of material, and
remove from flow if necessary.
2. If sensor is coated in dust, re-calibrate by following calibration
Instructions.
Sensor Not Detecting Material
1. If monitoring different types of materials, calibrate the sensor
Sensitivity to the lightest material being monitored.
2. Re-calibrate sensor, if problem continues contact 4B.
Summary of Contents for Binswitch BS1V3FC
Page 2: ......