10
3T-MOTORS Tubular motors
| Installation instructions
INSTALLATION INSTRUCTIONS
•
On the opposite side of the motor, push the roller capsule out of the roller shutter shaft until it fits into the ball bearing inserted in the wall bearing.
•
Fix roller capsule to roller shutter shaft with self-tapping screw. Position the screw at a punched hole. This prevents the screw from slipping.
7
Shutter motor wiring:
•
Connect the roller shutter motor and switch (or timer) to the mains.
•
The electrical connection of the roller shutter motor and control unit may only be carried out by qualified personnel.
•
If the drive should run in the opposite direction after installation, the motor’s upstream and downstream leads (brown + black) must be turned.
The connection diagram of time switches differs from this circuit diagram!
Please refer to the corresponding manual for the connection diagram.
Roller capsule
Wall b
Ball bearing
Power grid
230 V / 50 Hz
1) brown / black = L1 / Phase
2) blue = N Neutral conductor
3) green/yellow = PE Protective conductor
1) black = Departure or ascent
2) brown = Departure or ascent
3) blue = N Neutral conductor
4) green/yellow = PE Protective conductor
2 (N)
1 (Up/Down)
2 (Up/Down)
3 (N)
4 (PE)
3 (PE)
1 (L1)
Shutter motor
230 V / 50 Hz