MULTIPLE SYSTEM  INSTALLATION  RULE 

POWER LINE CABLING 

False alarm  due to  conducted  noise on  the  power lines can  be  avoided  if the  power lines are filtered 

every 4-6  meters  and  use twin-core shielded cable. 
This  is  done already on  A M 0 4 - 1 .   But the  power line between  the antennas is  not longer than 6 
meters  (8.2  MHz). Additional filter boards  must be  use  if the length of the power cable  between  the 
antennas is  longer than  6 meters,  . 

AM04-1  uses a built-in filter,  but it  only protect the electronics  its  self.  It do not contribute to  the 
filtering  of the  power output.  So,  two  antennas using a same power supply is  ideal. 

All antennas must face to  same direction to  have same phase. 

This will avoid detection dead zone at the  middle of two  antennas. 

That  means you  are  no  longer required  to  change the timing jumper on  each AM04-1  PCB or 
connect synchro cable to  allow multiple systems to  operate  in  close  proximity to  each  other. 
Auto timing  program  allows  maximum 63 AM04-1operate together without requiring them to  be 
slaved  to  or synchronized  to  each  other. 

S A M E F R E Q U E N C Y I N T E R F E R E N C E  

AM04-1 

is  now operate  in  a higher noise environment without reducing the  detection  range.  It is 

possible to  reduce interfere from  other swept  system  or deactivator. 

MULTIPLE SYSTEM  SYNCHRONIZATION 

The AM04-1

 software  now automatically selects the "AM04-1" synchro timing.

 