background image

Contents Overview

ILTUO Base Plate KIT

3-15-2110-K

(�3)

=

+

+

Screw

3-15-2308

(�6)

ILTUO base Plate

3-15-2110

(�3)

ILTUO base Plate cover

3-15-2114

(�6)

ILTUO Half Wall End 

Post Attachment KIT

3-15-2164-K

(�2)

=

+

+

ILTUO Half Wall Top rail 

Straight Adapter Plate

3-15-2164

(�2)

Screw

3-15-2302

(�4)

Screw

3-15-2303

(�8)

ILTUO Half Wall Center 

Post Attachment KIT

3-15-2163-K

(�1)

=

+

+

Screw

3-15-2302

(�4)

Screw

3-15-2303

(�4)

ILTUO Half Wall Top rail 

Straight Adapter Plate

3-15-2163

(�2)

⅜" Varia Panel

(�2)

ILTUO Vertical Post, 2 

Glazing Channels, 96"

0-15-2181

(�1)

ILTUO Vertical Post, 1 
Glazing Channel, 96"

0-15-2183

(�2)

VERSA 

½

"  Glazing  

Channel

3-15-2009

(�4)

For more information, please visit 3-form.com or call 800.726.0126

December 2018 | mAN-rTG-200-56 | reV 002 © 2018 3form, Inc. All rights reserved.

2

Ready To Go

SimpleSpec 200.56-ILTUO

tm

Installation Manual

Summary of Contents for SimpleSpec 200.56-ILTUO

Page 1: ...For more information please visit 3 form com or call 800 726 0126 December 2018 MAN RTG 200 56 REV 002 2018 3form Inc All rights reserved Ready To Go SimpleSpec 200 56 ILTUOtm Installation Manual ...

Page 2: ...f Wall Center Post Attachment KIT 3 15 2163 K 1 Screw 3 15 2302 4 Screw 3 15 2303 4 ILTUO Half Wall Top Rail Straight Adapter Plate 3 15 2163 2 Varia Panel 2 ILTUO Vertical Post 2 Glazing Channels 96 0 15 2181 1 ILTUO Vertical Post 1 Glazing Channel 96 0 15 2183 2 VERSA Glazing Channel 3 15 2009 4 For more information please visit 3 form com or call 800 726 0126 December 2018 MAN RTG 200 56 REV 00...

Page 3: ...K 1 ILTUO Half Wall Top Cap Straight Run Required Tools Drill Drill Bits Hammer Drill 3 ILTUO Base Plate Universal Anchoring KIT 3 15 2119 K ILTUO Hex Head Wood Lag Screw 3 15 2310 12 ILTUO M8x105 Concrete Lag Screw 3 15 2309 12 ILTUO Half Wall Top Cap Straight Run End VHB Tape 3 15 2171 3 3 For more information please visit 3 form com or call 800 726 0126 December 2018 MAN RTG 200 56 REV 002 2018...

Page 4: ...azing Channels 96 0 15 2181 Glazing Channel 3 15 2009 ILTUO Vertical Post 1 Glazing Channel 96 0 15 2183 Glazing Channel 3 15 2009 Base Plate KIT 3 15 2110 K Universal Anchoring KIT 3 15 2119 K For more information please visit 3 form com or call 800 726 0126 December 2018 MAN RTG 200 56 REV 002 2018 3form Inc All rights reserved 4 Ready To Go SimpleSpec 200 56 ILTUOtm Installation Manual ...

Page 5: ...0 Substrate Drill Bit 3 15 2350 3 15 2335 ILTUO Installation Template Base Plate 3 15 2160 ILTUO Installation Template Template Spacer 3 15 2347 Following the ILTUO Installation Template drill pilot holes Use appropriate pilot hole diameter and depth for the type of substrate you are fastening to 3form stocks the drill bits required for the concrete and wood pilot holes If you wish to purchase a d...

Page 6: ...st to Floor 3 4 Install Varia Panel 5 Install Remaining Posts and Panels Repeat Steps 3 4 for all remaining posts and panels For more information please visit 3 form com or call 800 726 0126 December 2018 MAN RTG 200 56 REV 002 2018 3form Inc All rights reserved 6 Ready To Go SimpleSpec 200 56 ILTUOtm Installation Manual ...

Page 7: ...03 1 3 15 2164 4 3 15 2303 2 7 Install Top Caps Screws 3 15 2302 Top Cap For more information please visit 3 form com or call 800 726 0126 December 2018 MAN RTG 200 56 REV 002 2018 3form Inc All rights reserved 7 Ready To Go SimpleSpec 200 56 ILTUOtm Installation Manual ...

Reviews: