Installation
2
Drill and Attach Anchors
cont...
Metal
Studs
Metal
Studs
h
i
g
Drill ؽ” (13mm) hole. Minimum
clearance behind wall = 17/8” (48mm).
position the metal channel parallel
with the plastic legs. insert the metal
channel through the drilled hole into
the wall cavity.
pull the metal channel firmly against the
inner wall cavity by tugging the plastic
pull ring.
Hollow Substrate Installation
k
l
j
Slide the plastic cap forward along the
legs until it is seated flush to the work
surface.
Snap the plastic legs off flush at the
plastic cap by pushing outward.
Note: Maximum torque on screw or rod
is 5 ft-lb.
7
For more information, please visit 3-form.com or call 800.726.0126
April 2018 | MAN-rTG-400-18 | rEV 002 © 2018 3form, inc. All rights reserved.