3D Systems wematter Density User Manual Download Page 11

5.3   Removing 3D Prints

Before removing 3D prints, make sure that the machine is turned off.
Beware that water may drip from the lid when it is opened. To minimize the risk of getting wet, allow for the water to run off the

window before opening.

WARNING: DO NOT, AT ANY TIME, WHEN THE LID IS OPEN TURN ON THE WATER AS THE HIGH-PRESSURE WATER

JET CAN CAUSE SERIOUS INJURY.

5.4  Changing the Filter

Please allow for the water to flow through the filter before removing the filter. If not, there will be water on the floor. You can

visually check if there is still water in the filter before removing it.

1. Open the grid in the blasting chamber by lifting the handle.
2. Unscrew the filter holder.
3. Remove the filter by lifting it straight up and throwing it in the trash.
4. Place a new filter in the filter spot.
5. Screw the filter holder in place and make sure it presses firmly against the filter. If not, dirty water will get into the machine's

internal water systems and damage the machine.

Figure 5: The filter is located below the grid in the blasting chamber.

3D Systems, Inc.

9

p/n 74-D002, Rev. A

Summary of Contents for wematter Density

Page 1: ...User Guide Release Date 7 19 2023 Original Instructions...

Page 2: ...TUP 6 4 1 Arranging the Workspace 6 4 2 Water 6 4 3 Filter 7 5 MACHINE USE 8 5 1 Loading 3D Prints 8 5 2 Cleaning 3D Prints 8 5 3 Removing 3D Prints 9 5 4 Changing the Filter 9 5 5 Refilling Water 10...

Page 3: ...expiration of the date of issuance 3D Systems may institute a periodic charge or fee payable by the Licensed User in return for ongoing receipt of improvements It is the responsibility of the Licensed...

Page 4: ...tion CAUTION Indicates the possibility of loss of data or damage to equipment WARNING INDICATES THE POSSIBILITY OF INJURY OR DEATH TO PERSONNEL Electrical Shock High voltage electricity is accessible...

Page 5: ...ymeric powders The final performance characteristics of the machine may vary according to your compliance with the instructions for use design guidelines application operating conditions fluids combin...

Page 6: ...ce Recommended installation area is 100 cm x 100 cm 39 3 x 39 3 inch Operating Temperature 15 25 C 59 77 F Power Requirements 250 V Earth Connected with RDC 10 A 50 Hz Peak 1800 W Nominal 800 W The De...

Page 7: ...d in the Essential system version does not come with the Compressed air with an integrated supply feature The Essential version therefore has two instead of three buttons on the front machine control...

Page 8: ...utlet 4 2 Water The machine shall be filled with 20 2 liters of tap water before turning the system on This is done by pouring water into the blasting chamber Figure 1 Pour 20 liters of water straight...

Page 9: ...he grid in the blasting chamber and make sure there is a filter in place The grid is opened by pulling the handle Figure 2 There must be a filter in place before the machine is used 3D Systems Inc 7 p...

Page 10: ...the chamber to turn on and off the water jet 4 CAUTION Only shoot water against the back of the chamber as the high pressure water may damage the lid seal and cause water leakage Keep the 3D printed p...

Page 11: ...er before removing the filter If not there will be water on the floor You can visually check if there is still water in the filter before removing it 1 Open the grid in the blasting chamber by lifting...

Page 12: ...e the lid before shooting water in the chamber There are approximately 20 liters of water inside the Density so you will have to empty the bucket a few times during the process The system is empty whe...

Page 13: ...em by shooting with the air gun in the blasting chamber 2 When the pressure has been removed from the system go to the right side of the Density At the bottom of the right side you find two valves 3 P...

Page 14: ...ion Job parameters if set differently from the defaults Build file if not restricted by company policy Log files with timestamp Relevant pictures and or videos The steps you took that produced the err...

Page 15: ...eserved Specifications subject to change without notice 3D Systems and the 3D Systems logo are registered trademarks of 3D Systems Inc 3D Systems Inc 333 Three D Systems Circle Rock Hill SC 29730 www...

Page 16: ...3dsystems com Register Statement 2023 by 3D Systems Inc All rights reserved Specifications subject to change without notice 3D Systems and the 3D Systems logo are registered trademarks of 3D Systems I...

Reviews: