background image

3D Systems, Inc.

11

Crated Specifications

Uncrated Specifications

Width

Depth

Height

Weight

Width

Depth

Height Weight

Weight range 

w/ resin

Description

cm 

(in)

cm 

(in)

cm 

(in)

kg 

(lb)

cm 

(in)

cm 

(in)

cm 

(in)

kg 

(lb)

kg 

(lb)

ProCure 750 UV 

Chamber

154 

(60 .8)

138 

(54 .5)

172 .7 

(68)

522 

(1150)

148 

(58 .3)

120 

(47 .2)

178 

(70 .1)

431 

(950)

n/a

MDM 800-50mm 

95 liters

137 

(54)

183 

(72)

112 

(44)

181 

(400)

79 

(31)

142 

(56)

79 

(31)

136 

(300)

247-307

(543-675)

MDM 800-275mm 

272 liters

137 

(54)

183 

(72)

112 

(44)

181 

(400)

79 

(31)

142 

(56)

79 

(31)

136 

(300)

437-627

(961-1380)

MDM 800-550mm 

414 liters

137 

(54)

183 

(72)

112 

(44)

181 

(400)

79 

(31)

142 

(56)

79 

(31)

136 

(300)

597-888

(1314-1953)

Weight and Dimensions - System Components (continued from 

pg . 10

)

Inspect Exterior of Printer

Visually inspect the exterior of the printer for any damage incurred during shipping . Notify 3D Systems Service immediately if 

anything is evident at this point . DO NOT proceed with the installation until you have discussed the damage with Service .

Inspect ShockWatch

®

 Indicator

Check the ShockWatch indicators (towards top of crate and at bottom of crate) .
If indicator(s) are red:
1 .  Do not refuse shipment .
2 .  Make notation on delivery receipt and inspect the container for signs of damage .
3 .  If damage is discovered, leave item in original container and packaging, and request immediate inspection from carrier 

within 15 days from delivery date .

If indicator is not red, machine is cleared to uncrate by a 3D Systems Field Service Engineer or an authorized reseller .

Summary of Contents for ProX 800

Page 1: ...ProX 800 3D Production Printer Facility Guide Original Instructions...

Page 2: ...ce and Location Selection 8 ProCure Floor Surface Requirements 8 ProCure Electrical Requirements 8 ProCure Ventilation Ductwork 8 SYSTEM DELIVERY 10 Preparation for Receiving 10 Shipment Arrival 10 In...

Page 3: ...posal and Safety 17 Job Submission 17 APPENDIX C THIRD PARTY SUPPLIES AND EQUIPMENT 18 Part Washing Systems 18 Uninterruptible Power Supply 18 Hand Held UV Guns 18 Model Finishing Tools and Supplies 1...

Page 4: ...efficient stereolithography SLA system that produces high fidelity parts from a broad range of plastics and composites The ProX 800 uses an SLA platform that expands the overall utilization of SLA par...

Page 5: ...ad Cart ProCure 750 UV Curing Chamber The ProCure 750 UV Chamber is an optional accessory which provides essential final part curing to create a fully solidified part with stable mechanical properties...

Page 6: ...Your site layout will vary NOTE Due to laser safety requirements the system should be located where access to the room can be avoided during service calls Optimal Site Layout FLOOR AREA SURFACE Floors...

Page 7: ...ty Wall 600 mm 24 in ProX 800 system space requirements top view ProX 800 system space requirements front view MDM ProX 800 Printer P r i n t C h a m b e r D o o r Left Side Window Right Side Window M...

Page 8: ...UPS with power conditioning For specific information on a suitable UPS contact a UPS manufacturer and provide the voltage rating current draw and desired backup time The manufacturer can recommend an...

Page 9: ...N cm2 135 psi ProX 800 System External Enclosure 110 N cm2 160 psi MDM 324 N cm2 470 psi Exact total lled weight depends on material 3 8 cm 1 5 in 12 7 mm 0 5 in 10 cm 4 in MDM 1302 mm 51 in 1102 mm 4...

Page 10: ...n lamps and high intensity incandescent lamps are not suitable and UV intensive lighting or ultraviolet exposure through windows should be avoided UV filters are available for windows and exposed fluo...

Page 11: ...side if required or appropriate The left side of the unit has a built in exhaust fan and includes an 8 diameter duct connector If the curing chamber duct is joined to a duct that has positive pressure...

Page 12: ...UV Chamber Dimensions 148 cm 58 3 in 148 cm 58 3 in 143 cm 56 3 in 58 cm 23 in 208 cm 82 in 109 cm 43 in 120 cm 47 3 in 264 cm 104 in Vent Fitting 20 3 cm 8 in ProCure UV Chamber Top View 178 cm 71 in...

Page 13: ...ehouse until the 3D Systems representative is scheduled to install the systems If you do not have an adequate forklift on site contact the shipping company in advance of the shipment to discuss whethe...

Page 14: ...stem Components continued from pg 10 Inspect Exterior of Printer Visually inspect the exterior of the printer for any damage incurred during shipping Notify 3D Systems Service immediately if anything...

Page 15: ...9in 1370mm 21 9in 556mm 6in 152mm 22 5in 572mm 6 6in 168mm 5 5in 140mm 2 3in 57mm A DETAIL A Third Party Supplies and Equipment Third party supplies and equipment are purchased from parties other tha...

Page 16: ...n area with down draft table for sanding Any desired post processing equipment to sand join grind polish paint or plate SLA parts Compressed air connection with pressure controller and fast closing co...

Page 17: ...a forklift and a trained forklift driver available during installation Make sure that the forklift is rated to a weight capacity that is equal to or greater than the crated weight of the SLA system R...

Page 18: ...ther regulatory agencies Follow applicable disposal guidelines Contact a local waste management company for recommendations on disposal requirements that affect your facility Do not leave uncured or l...

Page 19: ...level for the SLA material 20 50 Refer to the section Humidity on page 5 Is adequate electrical power available to the site Are there at least two 220 V circuits two outlets each with its own circuit...

Page 20: ...ed and locked during installation Is there a network connection Optional Is there a telephone line Optional MOVING EQUIPMENT AND SITE ACCESSIBILITY Is adequate space available for the equipment and su...

Page 21: ...RAMCO products MK36CSSX TPM TPM Wash Unit MK36CSSX WRU Water Rinse Unit SA WRU Water Recycling Unit Uninterruptible Power Supply American Power Conversion or Toshiba 5kVA Hand Held UV Guns DDU Enterp...

Page 22: ...Japan K K 4 6 8 Tsurumaki Setagaya ku Tokyo 154 0016 JAPAN General Inquiries 81 3 5451 1690 Material Orders 81 3 5451 1690 Customer Support 81 3 5451 1690 E mail japaninfo 3dsystems com U K 3D Systems...

Page 23: ...3D Systems Inc 333 Three D Systems Circle Rock Hill SC 29730 www 3dsystems com 2016 3D Systems Inc All rights reserved p n 286511 00 Rev D...

Reviews: