
1-6
C
HAPTER
1: NETB
UILDER
II 4-S
LOT
B
RIDGE
/R
OUTER
3
Verify that the configurable parameters of your device match the configuration
settings of the CONSOLE port specified in Table 1-1.
4
Turn on the PC, terminal, or modem.
Connecting
the Power Cord
A power cord is supplied with all NETBuilder II chassis. If the power cord does
not match your requirements, contact your network supplier for assistance.
The AC power switch is marked according to international I/O convention:
When you press the I side, the switch is on; when you press the O side, the
switch is off.
Make sure the power switch is turned off (O), and plug the power cord into the
AC power receptacle on the back of the chassis.
Installing the Cable
Strain-Relief Bracket
The cable strain-relief bracket is a wire-form metal bracket. This bracket is not
necessary for systems mounted on a tabletop, but it is recommended for
rack-mounted systems.
To install the cable strain-relief bracket on a 4-Slot chassis, follow these steps
(no tools are needed):
1
Secure the bracket to the rear of the system.
The ends of the bracket slide into four holes on the back of the chassis (see
Figure 1-6).
Figure 1-6
Installing the Cable Strain-Relief Bracket on the 4-Slot Chassis
Table 1-1
CONSOLE Port Configuration Settings
Characteristic
Setting
Baud rate
9600
Databits
8
Parity
None
Stop bits
1
DTR
Ignored
Duplex
Full
Echo
Off
Flow control
X-on/X-off
1
2
4
3
O I
Insert ends of strain-relief bracket
into round holes on chassis.
a
b
b
b Squeeze bracket together until the
other ends fit into the elongated
holes on chassis.
Cable strain-relief bracket
a
a
Summary of Contents for NETBuilder II
Page 8: ...viii ...
Page 10: ...2 ABOUT THIS GUIDE ...
Page 46: ...2 18 CHAPTER 2 NETBUILDER II 8 SLOT BRIDGE ROUTER ...
Page 66: ...3 20 CHAPTER 3 NETBUILDER II 8 SLOT EXTENDED BRIDGE ROUTER ...
Page 72: ...A 6 APPENDIX A FEATURE SUMMARY AND SPECIFICATIONS ...
Page 82: ......