42
C
HAPTER
4: U
SING
R
ESILIENCE
F
EATURES
Figure 8
Traffic flowing through Bridges C and A
If a link failure is detected, as shown in
Figure 9
, the STP process
reconfigures the network so that traffic from LAN segment 2 flows
through Bridge B.
Figure 9
Traffic flowing through Bridge B
STP determines which is the most efficient path between each bridged
segment and a specifically assigned reference point on the network. Once
the most efficient path has been determined, all other paths are blocked.
Therefore, in Figure 7, Figure 8, and Figure 9, STP initially determined that
the path through Bridge C was the most efficient, and so blocked the
path through Bridge B. After the failure of Bridge C, STP re-evaluated the
situation and opened the path through Bridge B.
dua1730-0bAA03.book Page 42 Monday, July 11, 2005 11:14 AM
Summary of Contents for 3C17300-US - SuperStack 3 Switch 4226T
Page 7: ...D STANDARDS SUPPORTED GLOSSARY INDEX dua1730 0bAA03 book Page 7 Monday July 11 2005 11 14 AM ...
Page 8: ...dua1730 0bAA03 book Page 8 Monday July 11 2005 11 14 AM ...
Page 14: ...14 dua1730 0bAA03 book Page 14 Monday July 11 2005 11 14 AM ...
Page 92: ...92 dua1730 0bAA03 book Page 92 Monday July 11 2005 11 14 AM ...
Page 96: ...96 APPENDIX A CONFIGURATION RULES dua1730 0bAA03 book Page 96 Monday July 11 2005 11 14 AM ...
Page 108: ...108 APPENDIX D STANDARDS SUPPORTED dua1730 0bAA03 book Page 108 Monday July 11 2005 11 14 AM ...
Page 122: ...122 INDEX dua1730 0bAA03 book Page 122 Monday July 11 2005 11 14 AM ...