The Power-up Sequence
21
The Power-up
Sequence
The following sections describe how to get your Server Load Balancer
powered-up and ready for operation.
WARNING:
If you are connecting the Server Load Balancer to a ARPS
Type 3 Power Module, read the Safety Information section in the
documentation shipped with the power system.
Powering-up
To power-up the Server Load Balancer, complete the following steps:
1
Plug the power cord into the power socket at the rear of the unit.
2
Plug the other end of the power cord into your power outlet.
The unit powers-up and runs through its Power On Self Test (POST),
which takes approximately 10 seconds.
During the POST, all ports on the Server Load Balancer are disabled and
the LEDs light in a rapid sequence. See “LEDs” on page 14.
When the POST has completed, check the Power/Self Test LED to make
sure that your Server Load Balancer is operating correctly. See “Solving
Problems Indicated by LEDs” on page 22.
slb_gsg.bk Page 21 Thursday, May 31, 2001 8:57 AM
Summary of Contents for 3C16120 - SuperStack 3 Server Load Balancer
Page 10: ...10 ABOUT THIS GUIDE slb_gsg bk Page 10 Thursday May 31 2001 8 57 AM ...
Page 40: ...40 CHAPTER 4 WORKING WITH THE WEB INTERFACE slb_gsg bk Page 40 Thursday May 31 2001 8 57 AM ...
Page 74: ...74 CHAPTER 8 CONFIGURING FOR LOAD BALANCING slb_gsg bk Page 74 Thursday May 31 2001 8 57 AM ...
Page 82: ...82 APPENDIX A SAFETY INFORMATION slb_gsg bk Page 82 Thursday May 31 2001 8 57 AM ...
Page 90: ...90 APPENDIX C TECHNICAL SUPPORT slb_gsg bk Page 90 Thursday May 31 2001 8 57 AM ...
Page 94: ...94 INDEX slb_gsg bk Page 94 Thursday May 31 2001 8 57 AM ...