![360 Yield 360 Y-DROP HAGIE DTS 2016 + Instruction Manual Download Page 4](http://html.mh-extra.com/html/360-yield/360-y-drop-hagie-dts-2016/360-y-drop-hagie-dts-2016_instruction-manual_440287004.webp)
INSTALL PRIMARY BOOM SPRAYER
MOUNT PACKAGE
Figures 4
To prepare for the steps that follow, you will need
to drill two 7/16" holes at mounting location 1 (40"
+/-5" from the pivot pin) on both OEM Primary
booms. This will allow for the installation of the
first mounting position of the square U-bolt on the
front and rear OEM booms.
Figures 5 and 6
Step 1
With the thread pointing down, install
square U-bolts (1) on the top of the OEM
primary boom.
Bag AF (2.0")
Bag AG (2.5")
Step 2
Install bracket assemblies (2) and the
flange nuts.
Hardware Kit D
Figure 7
Step 3
Install extension tube (3).
Step 4
Install boom bracket (4) onto extension
tube (3).
Repeat Steps 1-4 for the remaining mounting
positions on the primary booms.
INSTRUCTIONS 360 Y-DROP
HAGIE DTS 2016 +
II.
Figure 6
Figure 7
360YIELDCENTER.COM
4
1
2
3
4
1
2
2.5"
2.5"
2.0"
2.0"
2.0"
Figure 4
Figure 5