2.1.  Regulations and guidelines 

Follow  the  relevant accident prevention  regulations,  environmental  regulations  and  statutory 
rules  for  assembly,  installation  and  operation,  as  well  as  the  relevant  safety  regulations  of 
DIN, EN, DVGW, VDE and VDI and any national standards, laws and regulations. 

The electrical wiring work may only be carried out by qualified  electricians. The rules as well 
as the guidelines of the competent power supply company have to be kept.  
The hydraulic connection work may only be carried out by qualified personnel. The valid rules 
and regulations have to be kept.  

2.2.  Transport 

The storage may only be transported upright! 

For transporting you can use the hooks on the top of the tank. 

At  the  receiving,  the  storage  and  accessories  must  be  checked  for  possible 
transport damage. Neither the manufacturer nor the supplier is liable for shipping 
damages, but the freight carrier. After the acceptance of goods without objections 
transport damages can no longer be asserted.   

3. Installation

The installation, start-up, as well as maintenance and repair of the device may only 
be carried out by an expert technician. A safety valve is necessary at the cold water 
pipe. The device has to be run with pressure fittings.  

3.1.  Site 

Be sure that the floor is stable

 

Be sure that the floor is even 

Pay attention to ceiling height and tilted dimensions (see chapter 5: “Technical Data”) 

3.2.  Insulation 

Place the device at its location and align it according to the installation. At this pay attention 
to sufficient assembly freedom. Then assemble the insulation. After assembling the insulation 
you can start with the integration to the heating and hot water system.  

3.3.  Vent valve

 

Assemble a manual vent valve at the vent nozzle (12) 

Summary of Contents for 2P 400l

Page 1: ...tructions This installation construction contains important advice for handling installing and starting up a 2Power solar plant Read these advice carefully before mounting The mounting and the start up have to be conducted by a permitted specialized company With an improper installation the guaranty expires ...

Page 2: ...sense the temperature The associated thermal insulation of the storage protects the tank against heat loss 1 2 Intended use The described 2Power storage tank is provided for the storing of heating water and the heating of the drinking water Any use which goes beyond these limits is not regarded as the intended use The intended use also includes the observance of this instruction as well as the ins...

Page 3: ...ies must be checked for possible transport damage Neither the manufacturer nor the supplier is liable for shipping damages but the freight carrier After the acceptance of goods without objections transport damages can no longer be asserted 3 Installation The installation start up as well as maintenance and repair of the device may only be carried out by an expert technician A safety valve is neces...

Page 4: ... necessary 3 5 Temperature sensor Position the sensor at the height of the terminal strip at which the temperature for the control function should be recorded 4 Start up Before start up the system has to be tested for leaks the right hydraulic connection as well as correct electrical connections Furthermore an attentive respectively an appropriate rinsing of the system in accordance with DIN 4753 ...

Page 5: ...e 2 2Power return flow 3 Cold water supply line 4 Hot water outlet 5 Heat generator flow pipe 6 Heat generator return flow 7 Flow pipe heat generator 1 heating flow pipe 8 Return flow heat generator 2 heating return flow 9 Flow pipe heat generator 2 10 Return flow heat generator 2 11 Auxiliary electric heating 12 Vent 13 Drain ...

Page 6: ...ons in mm A B C D E F G H I J 2P 400l 1 406 1 306 590 350 260 400 590 725 850 650 2P 600l 1 695 1 595 790 465 310 515 790 925 1 050 750 2P 850l 1 885 1 785 785 465 350 615 945 1 080 1 205 800 2P 1000l 1 885 1 785 785 465 350 615 945 1 080 1 205 850 ...

Page 7: ... Diameter without insulation 650mm 750mm 800mm 850mm Empty weight 125kg 165kg 185kg 200kg Surface Solar heat exchanger Drinking water heat exchanger 2m 2 5m 2m 4m 3 1m 6m 3 1m 6m Continuous output Storage temperature 70 C approx 15kW 25kW 35kW 6 5l min 9 5l min 15l min 7 5l min 13l min 18l min 9l min 15l min 21l min 9l min 15l min 21l min Draw off rate limitation Storage temperature 70 C Storage t...

Page 8: ...y and all responsibility for units damaged after having been operated together with 2Power modules supplied by Agiba Heating but failing to take heed of technical data sheets and the installation instructions Subject to technical modifications in the course of product advancement Mistakes and errors reserved Agiba Heating Frjentsjerterdyk 1 8855 XC Sexbierum www agibaheating nl Tel 31 0 72 7920174...

Reviews: