AGAIN, USE SEMI-DRY
CONCRETE CLASS MIN. C20/25
TO FILL THE HOLES AND
CREATE FOOTINGIN
DIMENSION 50x50x50 CM.
TOP OF THE CONCRETE
FOOTING SHAPE INTO A CONE.
LET IT DRY FOR NEXT 24H.
11
14
12
PUT VERTICAL POLES
AS INDICATED
ON PICTURE No. 11
ON THE NEXT DAY TIGHTEN
THE SCREWS TO THE
MAXIMUM.
13
SEMI-DRY
CONCRETE
C20/25
5
PUT ON ONE HORIZONTAL
LADDER ON THE POLES AND
FIX THE CLAMPS ON THE
SCREWS USING THE TOOLS,
BUT DO NOT TIGHTEN.