Step 3: Readiness Test

The readiness test verifies that all systems are working 
optimally.

•  During first-time setup, follow screen 

instruction to launch the readiness test.

a. 

Verify that the shipping/readiness test block is 

properly placed on the tray: 

•  Press the eject button.
•  Ensure that the blank gasket is properly 

attached.

•  Replace the assembled block on the tray.
•  Press the eject button again to close the tray.

b. 

After the test is complete, follow screen 

instruction to remove the block with blank 

gasket from the tray. 

c. 

Store the assembled block and gasket in a 

plastic bag, away from sun-light and extreme 

temperature. Retain for future use.

d. 

A successful readiness test marks the end of 

setup. The instrument is now ready for use.

Initiate subsequent readiness tests through the 

home screen by loading the shipping/readiness 

test block with gasket into the instrument.

Operation Screens  

After the readiness test, the instrument is ready for use. 
Representative instrument operation screens are shown 
below. 

Refer to the Chromium X Series (X/iX) User Guide (CG000396) for complete information 

Clock

Set up during first-time use. 

Access through the menu 

option > System/Date & Time

Main Button

Eject shown when 

ready for use

Status Icons

Displays successfully-

connected devices. 

Menu Options 

Press icon to 

navigate to that 

menu option

Reviews: