background image

ECC800 Data Center Controller
V100R021C00

User Manual (for ECC800-Pro)

Issue

02

Date

2020-09-07

HUAWEI TECHNOLOGIES CO., LTD.

Summary of Contents for ECC800-Pro

Page 1: ...ECC800 Data Center Controller V100R021C00 User Manual for ECC800 Pro Issue 02 Date 2020 09 07 HUAWEI TECHNOLOGIES CO LTD ...

Page 2: ...cribed in this document may not be within the purchase scope or the usage scope Unless otherwise specified in the contract all statements information and recommendations in this document are provided AS IS without warranties guarantees or representations of any kind either express or implied The information in this document is subject to change without notice Every effort has been made in the prep...

Page 3: ...ils about the applicable ECC800 Pro functions see the FusionModule solution documentation The figures provided in this document are for reference only This document applies to the ECC800 Pro data center controller The software version is ECC800 V100R021C00 Intended Audience This document is intended for Sales engineers Technical support engineers Maintenance engineers Symbol Conventions The symbol...

Page 4: ...tion in the main text NOTE is used to address information not related to personal injury equipment damage and environment deterioration Change History Changes between document issues are cumulative The latest document issue contains all updates made in previous issues Issue 02 2020 09 07 Added the UPS2000G_L and electricity meters of UPS input and output power distribution cabinet PDC Issue 01 202...

Page 5: ...IM20A Expansion Module 25 3 2 2 Rack Environment Unit 28 3 2 3 Smart ETH Gateway 30 3 2 4 Access Control System 32 3 2 4 1 Aisle Access Control System 32 3 2 4 1 1 Access Actuator 33 3 2 4 1 2 Fingerprint and Card Reader with a Keypad 36 3 2 4 1 3 Fingerprint and Card Reader 37 3 2 4 1 4 Card Reader with a Keypad 39 3 2 4 1 5 Magnetic Lock 39 3 2 4 2 Cabinet Access Control System 40 3 2 4 3 Cabine...

Page 6: ...dule 76 3 2 21 Intelligent Battery Monitoring System 77 3 2 21 1 iBOX 78 3 2 21 2 iBAT 88 4 UI Description 91 4 1 WebUI 91 4 2 Mobile Phone App 98 4 3 Pad App 99 5 Power On Commissioning 101 5 1 Preparations and WebUI Login 101 5 2 Performing Startup Password Authentication for FusionModule800 104 5 3 Commissioning Configuration Wizard 106 5 4 Configuring Event Notification 107 5 5 Commissioning t...

Page 7: ...ning a C3220 Camera 154 6 5 3 4 Commissioning a C3220 Camera SD Card Configured 161 6 5 4 Commissioning a Camera LAN Switch Networking Scenario 163 6 5 4 1 Commissioning IPC6325 Cameras 163 6 5 4 2 Commissioning IPC6325 Camera SD Card Configured 167 6 5 4 3 Commissioning a C3220 Camera 170 6 5 4 4 Commissioning a C3220 Camera SD Card Configured 176 6 5 5 Initializing VCN510 Disks 179 6 5 6 Setting...

Page 8: ...r Usage 222 6 11 4 Viewing the Power Supply Links Diagram 223 6 12 Cooling Capacity Management 224 6 12 1 Optional Setting Cooling Management Parameters 224 6 12 2 Viewing Cooling Capacity Usage Information 226 6 12 3 Viewing the Cooling Links Diagram 227 6 12 4 Setting the Temperature Map 229 6 13 Facial Recognition 232 6 13 1 Recording Facial Data 232 6 13 2 Collecting and Importing Facial Data ...

Page 9: ...67 8 1 7 7 How Can I Set and Add a Transformer Modbus RTU 268 8 1 7 8 How Can I Set and Add an SVG In Power Modbus RTU 270 8 1 7 9 How Can I Set and Add an Envicool Air Conditioner Modbus RTU 271 8 1 7 10 How Can I Set and Add a TP48202B Modbus RTU 273 8 1 7 11 How Can I Set and Add a SmartLi Modbus TCP 274 8 1 7 12 How Can I Add and Set the Smart Module Actuator Modbus MAC 275 8 1 7 13 How Can I ...

Page 10: ...0 8 1 7 40 How Can I Set and Add a T H Sensor BOM Number 02310NBS 312 8 1 7 41 How Can I Set and Add a T H Sensor BOM Number 02311FQG 02312PBL 314 8 1 8 How Can I Restore Factory Settings 316 8 1 9 How Can I Install a Network Security Certificate 317 8 1 10 How Can I Install a Device Access Certificate 317 8 1 11 How Can I Change the ECC800 Pro IP Address on the WebUI 318 8 1 12 How Can I Configur...

Page 11: ...ly over the ECC800 Pro WebUI 339 8 1 36 How Can I Turn On or Off Smart Cooling Products over the ECC800 Pro WebUI 341 8 1 37 How Can I Open the Cabinet Electronic Lock over the ECC800 Pro WebUI 341 8 1 38 How Can I Link the Smoke Alarm with the Alarm Beacon over the ECC800 Pro WebUI 342 8 1 39 How Can I Link the AI DI Alarm with the Alarm Beacon over the ECC800 Pro WebUI 343 8 1 40 How Can I Modif...

Page 12: ...rranty Follow local laws and regulations when installing operating or maintaining the equipment The safety instructions in this document are only supplements to local laws and regulations Huawei will not be liable for any consequences of the following circumstances Operation beyond the conditions specified in this document Installation or use in environments which are not specified in relevant int...

Page 13: ... installation operation and maintenance Before handling a conductor surface or terminal measure the contact point voltage and ensure that there is no risk of electric shock After installing the equipment remove idle packing materials such as cartons foam plastics and cable ties from the equipment area In the case of a fire immediately leave the building or the equipment area and turn on the fire a...

Page 14: ...of time Before operations ensure that the equipment is firmly secured to the floor or other solid objects such as a wall or an installation rack Do not use water to clean electrical components inside or outside of a cabinet Do not change the structure or installation sequence of equipment without permission Do not touch a running fan with your fingers components screws tools or boards before the f...

Page 15: ...equipment installation operation maintenance Trained personnel personnel who are technically trained have required experience are aware of possible hazards on themselves in certain operations and are able to take protective measures to minimize the hazards on themselves and other people Operators operation personnel who may come in contact with the equipment except trained personnel and profession...

Page 16: ... exists between the cables and heat generating components or areas This prevents damage to the insulation layer of the cables Do not route cables behind the air intake and exhaust vents of the equipment Ensure that cables meet the VW 1 flame spread rating requirements Bind cables of the same type together When routing cables of different types ensure that they are at least 30 mm away from each oth...

Page 17: ...1 4 Installation Environment Requirements To prevent fire due to high temperature ensure that the ventilation vents or heat dissipation system are not blocked when the equipment is running Install the equipment in an area far away from liquids Do not install it under areas prone to condensation such as under water pipes and air exhaust vents or areas prone to water leakage such as air conditioner ...

Page 18: ... Set a restricted area and eye catching signs for working at heights to warn away irrelevant personnel Carry the operation machinery and tools properly to prevent them from falling off and causing injuries Personnel involving working at heights are not allowed to throw objects from the height to the ground or vice versa Objects should be transported by tough slings hanging baskets highline trolley...

Page 19: ...ghts When a step ladder is used ensure that the pull ropes are secured and the ladder is held firm Before using a ladder check that it is intact and confirm its load bearing capacity Do not overload it Ensure that the ladder is securely positioned The recommended angle for a ladder against the floor is 75 degrees as shown in the following figure An angle rule can be used to measure the angle Ensur...

Page 20: ...s or cables inside Metal shavings from drilling may short circuit boards inside the equipment Obtain the consent from the customer and subcontractor before drilling Wear goggles and protective gloves when drilling holes When drilling holes protect the equipment from shavings After drilling clean up any shavings that have accumulated inside or outside the equipment Moving Heavy Objects DANGER When ...

Page 21: ...a road with good condition for transportation to ensure equipment safety Avoid tilt or jolt during transportation Move a cabinet with caution Any bumping or falling may damage the equipment 1 6 Others Exercise caution when shutting down the smart cooling product Doing so may cause equipment and room overheating which will damage the equipment Exercise caution when powering off the rPDU or PDU2000 ...

Page 22: ...ch bandwidth resources and high communication efficiency Supports remote upgrade fault data export and configuration parameter synchronization Eight access control devices and four cameras can be connected to a single smart module Cascades a maximum of three ECC800 Pros The active alarms and power usage effectiveness PUE data of cascaded ECC800 Pros can be displayed on the WebUI of one ECC800 Pro ...

Page 23: ...g and play mode for auto discovery and auto registration requiring no configuration This feature enables fast delivery and higher maintainability Reliable Supports intelligent linkage management which allows customization of linkage logic achieving intelligent operation and maintenance Supports dual power inputs providing high reliability Supports intelligent battery monitoring management which al...

Page 24: ... manners Configuration 1 typical configuration one power module and one main control module Configuration 2 two power modules and one main control module NOTE In configuration 1 install a filler panel in slot 2 In configuration 2 install power modules in slots 1 and 2 Figure 3 1 ECC800 Pro collector in configuration 2 1 Slot 1 power modules 2 Slot 2 power modules 3 Slot 3 main control module ECC80...

Page 25: ...ht 7 5 kg dual power supplies main control module Color Black Installation requirements Can be installed in a 1 U space in a standard 19 inch cabinet Environmental protection RoHS5 REACH WEEE Figure 3 2 ECC800 Pro rear view 1 53 5V DC_OUT1 2 53 5V DC_OUT2 3 AC_INPUT1 4 AC_INPUT2 Power Port The ECC800 Pro provides four power ports including two AC input ports AC_INPUT1 and AC_INPUT2 and two DC outp...

Page 26: ...tus indicator 3 AIDI_1 4 AIDI_2 5 COM1 AIDI_4 6 COM3 12V 7 WAN1 8 LAN1 POE 9 LAN2 POE 10 WAN2 11 COM4 CAN 12 COM2 AIDI_5 13 AIDI_3 14 DO 12V 15 RF_Z 16 WLAN 17 4G 18 SW button Figure 3 4 ECC800 Pro main control module side view 1 SIM card slot 2 Micro SD card slot reserved ECC800 Data Center Controller User Manual for ECC800 Pro 3 Device Description Issue 02 2020 09 07 Copyright Huawei Technologie...

Page 27: ...lded network cables to the LAN ports RS485 serial port expansion Output voltage 13 15 V DC rated voltage 14 5 V DC Four RS485 ports with the default communications rate of 9600 bit s COM1 COM3 ports provide 12 V DC power The power supply can be switched on or off and is on by default PoE expansion Supports two PoE GE ports for expansion of the PoE bus and supports network isolation and ring networ...

Page 28: ...ge frequency band B1 B3 B5 B7 B8 and B20 3G wireless mode WCDMA coverage frequency bands B38 B40 and B41 2G wireless mode GSM coverage frequency band 900 1800 MHz NOTE The prerequisite for using a SIM card is that the site has signal coverage Due to the performance limitation of the wireless module China Telecom SIM cards are not supported USB Supports USB 2 0 and 5 V 1 A power supply After instal...

Page 29: ... 900 1800 1900 MHz 3G 4G EIRP max 23 dBm Communications Port The ECC800 Pro provides the following communications ports Figure 3 5 shows the pins of the RJ45 port Figure 3 5 RJ45 port pins There are four GE ports that is two WAN ports WAN1 and WAN2 and two LAN ports LAN1 POE and LAN2 POE Table 3 7 GE port pin definitions Item Description Pin sequence Pin1 GE1 Pin2 GE1 Pin3 GE2 ECC800 Data Center C...

Page 30: ...Pin2 RS485 Pin3 12V DC_OUT Pin4 RS485 Pin5 RS485 Pin6 DI Pin7 DI Pin8 GND Indicator Green indicator Power output indicator Steady on The 12 V DC output is normal Off No 12 V DC output is provided Table 3 9 COM3 12V port pin definitions Item Description Pin sequence Pin1 RS485 Pin2 RS485 Pin3 12V DC_OUT Pin4 RS485 ECC800 Data Center Controller User Manual for ECC800 Pro 3 Device Description Issue 0...

Page 31: ...ts pin definitions NOTE Pins 1 2 4 and 5 identify sensor types Pin 3 and Pin 8 are power output ports Pin 6 and Pin 7 collect sensor data Pin 7 can detect current type sensors 4 20 mA Pin 6 and Pin 7 can detect the output status of passive dry contact type sensors Pin 3 and Pin 7 can detect temperature sensors Table 3 11 AIDI_1 AIDI_2 and AIDI_3 ports pin definitions Item Description Pin sequence ...

Page 32: ...on Pin sequence Pin1 Pin2 Pin3 12V DC_OUT Pin4 Pin5 Pin6 DO_OUT Pin7 DO_OUT Pin8 GND Indicator Green indicator Power output indicator Steady on The 12 V DC output is normal Off No 12 V DC output is provided Table 3 13 USB port pin definitions Item Description Pin sequence Pin1 5V Pin2 DM Pin3 DP Pin4 GND ECC800 Data Center Controller User Manual for ECC800 Pro 3 Device Description Issue 02 2020 09...

Page 33: ...rated Off The system is normal RF_Z Green Communication status indicator Blinking at long intervals A network is set up and no node access is allowed the indicator blinks at 0 5 Hz on for 1s and then off for 1s Blinking at super short intervals A network is set up and node access is allowed the indicator blinks at 10 Hz on for 0 05s and then off for 0 05s SW Button Table 3 15 SW button description...

Page 34: ... address factory settings and user information Press and hold down the button for 1 minute None 3 1 3 Power Module Indicator Table 3 16 PSU indicator description Indicator Color Name Status Description Green Power indicato r Steady on The converter has a power input Off The converter has no power input or is faulty Blinking at long intervals The converter is being queried the indicator blinks at 0...

Page 35: ...ut overvoltage Hibernation Off The converter generates no protection alarms Blinking at long intervals The communication between the converter and the outside is interrupted the indicator blinks at 0 5 Hz on for 1s and then off for 1s Red Fault indicato r Steady on The converter locks out due to output overvoltage The converter delivers no output due to internal faults Off The converter is working...

Page 36: ...tch 2 COM_OUT 3 COM_IN Table 3 17 UIM20A expansion module specifications Item Specifications Width 120 mm Depth 200 mm Height 43 mm Operating temperature 30 C to 65 C Installation requirement s Installed in a 19 inch rack Environmen tal protection RoHS5 ECC800 Data Center Controller User Manual for ECC800 Pro 3 Device Description Issue 02 2020 09 07 Copyright Huawei Technologies Co Ltd 25 ...

Page 37: ...r supply can be switched on or off and is on by default POE Connects to the ECC800 Pro through the PoE port DIP switch One 4 bit DIP switch is used to set the RS485 address OFF indicates 0 and ON indicates 1 Bit 1 is the least significant bit and bit 4 is the most significant bit For example if the board address is 5 the corresponding bits are ON OFF ON and OFF and the corresponding binary number ...

Page 38: ...tors Indicator Status Description RUN Steady on A board application is being loaded Off The board is not running Blinking at long intervals The ECC800 Pro is successfully registered and the software runs properly blinking at long intervals 0 5 Hz on for 1s and then off for 1s Blinking at short intervals The communication is interrupted or the ECC800 Pro is unsuccessfully registered blinking at 2 5...

Page 39: ... for 0 5s and then off for 0 5s last 10s blinking at super short intervals for 10 Hz on for 0 05s and then off for 0 05s 3 2 2 Rack Environment Unit The rack environment unit collects and controls the environmental data of IT cabinets in the smart module Figure 3 8 Rack environment unit 1 Ground port 2 48 V DC power input port 3 PoE port 4 COM1 12V port 5 COM2 12V port 6 COM3 port 7 COM4 port 8 NT...

Page 40: ...eratur e sensor port Provides two RJ45 ports to connect to six temperature sensors each RJ45 port connecting to three temperature sensors BLINK button Provides a BLINK function Indicators Table 3 24 lists the structural specifications for the rack environment unit Table 3 24 Indicator description Indica tor Col or Name Status Description PWR Gre en Power input status indicator Steady on The power ...

Page 41: ...teway allows the extension of the 53 5 V DC power supply and FE communication for the ECC800 Pro and can be flexibly deployed in a smart module Figure 3 9 Smart ETH gateway 1 PWR_IN cascading power port 2 FE_1 cascading signal port 3 POE_1 2 ports 4 POE_3 4 ports 5 48V_OUT1 power output port 6 48V_OUT2 power output port 7 FE_2 cascading signal port 8 PWR_OUT cascading power port 9 BLINK button 10 ...

Page 42: ...inal with an indicator 10 100M communications rate complying with IEEE802 3 IEEE802 3u IEEE802 3af at BLINK button If you press the BLINK button the RUN indicator blinks intermittently at super short intervals blinking at super short intervals for 0 5s and then off for 0 5s for 5 seconds Indicators Table 3 26 Indicators on a smart ETH gateway Indicator Color Name Status Description PWR Green Power...

Page 43: ...s security Diverse access control devices such as the fingerprint and card reader with a keypad fingerprint and card reader and card reader with a keypad are supported Note that the communication distance between an access control device and an access actuator should be less than or equal to 5 meters NOTE If the IC cards used by the access control device need to be purchased the IC card chip speci...

Page 44: ...gnetic lock by detecting the card swiping information of the card reader door open button information and fire linkage information It has access right management access event record and alarm record functions Figure 3 10 Access actuator 1 48 V power port 2 PoE port 3 RS485 port COM2 4 RS485 port COM1 5 Address DIP switch 6 Status indicator 7 BLINK button 8 WG_2 Wiegand interface 9 WG_1 Wiegand int...

Page 45: ...s one route with the default communication rate of 9600 bit s physical port cascading supported reserved function Wiegand port Two Wiegand ports 12 V DC card reader operating power output two routes of card readers can operate at the same time BLINK button Press the button for less than 1 second to start blinking Hold down the button for 1 5 seconds to search for a network and start networking Hol...

Page 46: ...tem failure alarm is generated Off No system alarm is generated RF_Z Green Wireless communicati on status indicator Steady on No network parameters exist or a network is to be created Blinking at long intervals A network is set up and no node access is allowed the indicator blinks at 0 5 Hz on for 1s and then off for 1s Blinking intermittently at super short intervals The access actuator is search...

Page 47: ...int and card reader with a keypad Item Specifications Dimensions L x W x H 156 mm x 53 mm x 38 mm Rated operating voltage 12 V DC 15 Rated operating current 300 mA 15 Card type supported IC card Authorized storage A maximum of 3000 authorized users with a maximum of 6000 fingerprints Communications mode RS485 and Wiegand communications ports ECC800 Data Center Controller User Manual for ECC800 Pro...

Page 48: ...ree Authorized fingerprint collection LED indicator The indicator blinks blue red and blue in order Fingerprint reader The indicator turns on white Buzzer sounds The buzzer sounds once Card swiping LED indicator The indicator blinks blue red and blue in order Buzzer sounds The buzzer sounds once 3 2 4 1 3 Fingerprint and Card Reader Figure 3 12 Fingerprint and card reader 1 Fingerprint reader 2 LE...

Page 49: ...steady blue Fingerprint reader The indicator is off Unauthorized fingerprint collection LED indicator The indicator blinks blue red blue red and blue in order Fingerprint reader The indicator turns on white Buzzer sounds The buzzer sounds three Authorized fingerprint collection LED indicator The indicator blinks blue red and blue in order Fingerprint reader The indicator turns on white Buzzer soun...

Page 50: ...tage range 10 8 13 2 V DC rated voltage 12 V DC Operating current Static standby current 80 mA dynamic operating current card swiping key pressing 150 mA minimum input current 12 V DC 300 mA Communication mode Wiegand communications port 3 2 4 1 5 Magnetic Lock Figure 3 14 Double door magnetic lock ECC800 Data Center Controller User Manual for ECC800 Pro 3 Device Description Issue 02 2020 09 07 Co...

Page 51: ...g authorized using software An IC card can be authorized for one lock or all locks Door opening information is recorded through a network The system displays the status of cabinet doors and locks in real time the system displays the status of cabinet doors and locks in real time and reports the unauthorized door opening The system supports remote unlocking ECC800 Data Center Controller User Manual...

Page 52: ... Supported Mechanical Code Lock Features The cabinet door can be opened with only the key and without the password The cabinet door can be opened with only the password and without the key The user can set a password A password should contain at least three digits The password can be reset if the user forgot it ECC800 Data Center Controller User Manual for ECC800 Pro 3 Device Description Issue 02 ...

Page 53: ...o manage access control It can be automatically unlocked or manually locked and unlocked Figure 3 19 Cabinet electronic clasp lock 1 LED indicator 2 DIP switch 3 RJ45 power port ECC800 Data Center Controller User Manual for ECC800 Pro 3 Device Description Issue 02 2020 09 07 Copyright Huawei Technologies Co Ltd 42 ...

Page 54: ...or 1s The door lock fails to pair with the host The indicator blinks at 4 Hz on for 0 125s and then off for 0 125s Off The power supply is abnormal Press SW Blinki ng interm ittentl y at super short interv als The indicator blinks at super short intervals for 0 5s and then off for 0 5s The indicator blinks at super short intervals blinking at 10 Hz on for 0 05s and then off for 0 05s The cycle las...

Page 55: ...r the host control information and opens the magnetic lock when detecting the card swiping information of the card reader exit button information and fire linkage information In addition the smart module actuator manages access rights records entrance and exit events and records alarms Appearance Figure 3 20 Smart module actuator 1 48 V DC power input port 2 LAN port 3 RS485 ports COM1 COM2 4 RS48...

Page 56: ...tput of the electronic door lock and one DI input port is used to connect to the door status switch Both ports use terminals Skylight One DO output port is used to control the power output of the skylight magnetic lock and one DI input port is connected to the skylight open button Both ports use terminals DO 12V One DO port with 12 V DC power supply reserved AI DI port Five AI DI ports in which on...

Page 57: ...the ECC800 Pro and the software runs properly the indicator blinks at 0 5 Hz on for 1s and then off for 1s Blinking at short intervals The communication fails or the smart module actuator fails to register with the ECC800 Pro the indicator blinks at 4 Hz on for 0 125s and then off for 0 125s Blinking The indicator blinks at super short intervals for 0 5s blinking at 10 Hz on for 0 05s and then off...

Page 58: ...r 0 05s Blinking intermittent ly at super short intervals The smart module actuator is searching for a network the indicator blinks at super short intervals for 0 5s and then turns off for 0 5s 3 2 6 AC Actuator The AC actuator is used in a smart module to control the lighting inside the smart module by receiving commands from the access control system or host infrared linkage information disabled...

Page 59: ...C to 240 V AC maximum current 5 A Wireless communication One wireless communication port that complies with IEEE802 15 4 RS485 serial port One route of dual RS485 ports not isolated reserved AI DI detection Two AI DI dry contacts connecting to two light buttons PAD intelligent charging Charging stops when the PAD battery level reaches 100 When the battery level is lower than 40 default value which...

Page 60: ... ECC800 Pro and the software runs properly the indicator blinks at 0 5 Hz on for 1s and then off for 1s Blinking at short intervals The communication fails or the AC actuator fails to register with the ECC800 Pro the indicator blinks at 4 Hz on for 0 125s and then off for 0 125s Blinking The indicator blinks at super short intervals for 0 5s blinking at 10 Hz on for 0 05s and then off for 0 05s an...

Page 61: ...ontainment of the smart module through the alarm linkage information from the fire extinguishing system or the control information from the upper computer The skylight actuator supports E labels and wireless networking 802 15 4 Figure 3 22 Skylight actuator 1 LOCK GND magnetic lock DO output port 2 BUTTON GND window open button DI input port 3 AI DI_1 sensor input port 4 AI DI_2 sensor input port ...

Page 62: ...etic locks simultaneously DI input One DI input port for connecting to the window open button BLINK button Press the button for less than 1 second to start blinking Hold down the button for 1 5 seconds to search for a network and start networking Hold down the button for more than 10 seconds to clear network parameters Address DIP switch 4 pin address DIP switch E label Supported Indicators Table ...

Page 63: ...dy on A system failure alarm is generated Off No system alarm is generated RF_Z Green Communicati on status indicator Steady on No network parameters exist or a network is to be created Blinking at long intervals A network is set up and no node access is allowed the indicator blinks at 0 5 Hz on for 1s and then off for 1s Blinking intermittent ly at super short intervals The skylight actuator is s...

Page 64: ...frared detection The multi functional sensor can connect to the ECC800 Pro over FE or wireless communication NOTE The infrared detection function is enabled only when the intelligent lighting function is enabled Figure 3 23 Multi functional sensor 1 Address DIP switch 2 BLINK button 3 TEST button 4 RF_Z indicator 5 RUN indicator 6 ALM indicator ECC800 Data Center Controller User Manual for ECC800 ...

Page 65: ...sor is connected to network after you hold down the button for 2s to 3s the RUN indicator blinks Hold down the button for more than 6 seconds to clear network parameters Test button smoke sensor test button Supports the smoke sensor test Hold down the button for 3s to trigger a smoke alarm and release the button to stop the smoke alarm E label Supported Indicators Table 3 47 Description of the ind...

Page 66: ...system alarm is generated RF_Z Green Communicat ion status indicator Steady on No network parameters exist or a network is to be created Blinking at long intervals A network is set up and no node access is allowed the indicator blinks at 0 5 Hz on for 1s and then off for 1s Blinking intermittentl y at super short intervals The multi functional sensor is searching for a network the indicator blinks...

Page 67: ... AC Operating temperature 10ºC to 50ºC Ambient humidity 95 RH non condensing Dimensions Diameter 112 mm height 41 mm 3 2 10 Temperature Sensor The temperature sensor BOM number 33010348 is used for the surface temperature measure industrial process control measurement instrument etc Figure 3 25 Temperature sensor ECC800 Data Center Controller User Manual for ECC800 Pro 3 Device Description Issue 0...

Page 68: ...or Table 3 50 Technical specifications of the cabinet temperature sensor Item Specifications Temperature detection range 20 C to 70 C Temperature detection tolerance 1 C 10 C 25 C 25 C 55 C 2 C 20 C 10 C 55 C 70 C 0 5 C 25 C Operating temperature 20 C to 70 C Operating humidity 5 95 RH Storage temperature 40 C to 70 C Storage humidity 95 RH non condensing ECC800 Data Center Controller User Manual ...

Page 69: ... Reach Table 3 52 Technical specifications of an alarm beacon Item Specifications Power input RJ45 port input voltage 9 16 V DC operating current 400 mA Sound pressure 100 3 dB 30 cm Continuous operating time 45 min 3 2 13 Optional Smart U Space Manager The smart U space manager is designed for IT asset management of the data center The system automatically detects the physical location of IT devi...

Page 70: ...12 V DC 5 RJ45 Rated current and power consumption 250 mA Data upload port One RS485 route two RJ45 ports Dimensions mm Main control box 71 mm x 70 mm x 25 mm Detection strip 1867 mm x 18 mm x 6 5 mm H x W x D Weight 0 2 kg main control box 0 35 kg asset detection strip Installation mode Magnet based installation 3 2 14 eLight Actuator The eLight actuator has the function of associating alarms acc...

Page 71: ...ajor alarm Yellow light Steady on The smart module raises a minor alarm Gray light Steady on The smart module raises a warning Green light Blinking for 3 seconds Access authorization succeeds and the door can be opened Blue light Steady on Associated alarm severity is set to None Other color light Steady on or blinking The device is abnormal or cables are incorrectly connected to terminals R G and...

Page 72: ...a guide rail Operating temperature 4 C 40 C Ambient humidity 5 95 RH non condensing 3 2 15 Water Sensor A water sensor detects water on the floor in real time and generates an alarm when water is detected 3 2 15 1 WLDS600 Water Sensor The WLDS600 water sensor consists of a water detection cable a water detector with the BOM number of 33010556 an extension line and a conversion cable ECC800 Data Ce...

Page 73: ...s buzzing and the alarm location is a stable value that is greater than the total length of the water leakage location cable replace the end cap with the other end cap Table 3 56 WLDS600 water sensor specifications Item Specification Dimensions L x W x H 70 mm x 58 mm x 86 mm 1 Power supply 9 16 V DC or 9 16 V AC Impulse current 450 mA Power dissipation 2 W Power communicatio n connector RJ45 fema...

Page 74: ...properly the green indicator is on When a fault occurs the yellow indicator is on When water leakage occurs the red indicator is on Display 4 bits Nixie tube shows leaking position Adjustable Sensitivity 3 grade of sensitivity Installation mode DIN track install supported 3 2 15 2 WLDS900 Water Sensor The WLDS900 water sensor with the BOM number of 33010352 consists of a water detection cable a wa...

Page 75: ...cable Table 3 57 WLDS900 water sensor specifications Item Specification Operating voltage 12 V DC 9 16 V DC Operating temperature 20 C to 70 C Storage temperature 40 C to 85 C Humidity 10 80 RH non condensing 3 2 15 3 Electrode Water Sensor The electrode water sensor with the BOM number of 33010444 contains electrode probes and cables ECC800 Data Center Controller User Manual for ECC800 Pro 3 Devi...

Page 76: ...2 16 WiFi Module The WiFi module provides WiFi signals for equipment such as pads and mobile phones to interact with the host computer Figure 3 33 WiFi module Table 3 59 Technical specifications Item Specifications Wireless standard IEEE 802 11n IEEE 802 11g and IEEE 802 11b ECC800 Data Center Controller User Manual for ECC800 Pro 3 Device Description Issue 02 2020 09 07 Copyright Huawei Technolog...

Page 77: ...ange 5 0 V DC 5 Operating temperature 20 C to 70 C Storage temperature 40 C to 90 C Relative humidity 10 90 RH non condensing Storage humidity 5 90 RH non condensing Power 0 8 W 3 2 17 ETH Converter The ETH converter is used to convert the Modbus RTU protocol or CAN protocol to the Modbus MAC protocol for connecting to the PoE bus ECC800 Data Center Controller User Manual for ECC800 Pro 3 Device D...

Page 78: ...g with IEEE802 3at RS485 CA N Provides two RS485 CAN ports The default communications rate for the RS485 port is 9600 bit s and that for the CAN port is 125 kbit s Both ports match the RJ45 terminal shared by RS485 and CAN BLINK button If you press the BLINK button the RUN indicator blinks intermittently at super short intervals blinking at super short intervals for 0 5s and then off for 0 5s for ...

Page 79: ...egister with the ECC800 Pro the indicator blinks at 4 Hz on for 0 125s and then off for 0 125s Blinking The indicator blinks at super short intervals for 0 5s blinking at 10 Hz on for 0 05s and then off for 0 05s and then turns off for 0 5s The cycle lasts for 10s ALM Red Alarm indicator Steady on A system failure alarm is generated Off No system alarm is generated 3 2 18 PAD The pad allows the wi...

Page 80: ...nch 1920 x 1200 resolution IPS screen and multi touch Storage Machine 32 GB Memory 3 GB LPDDR3 extension card Micro SD a maximum of 256 GB non standard configuration Button Port Touch button power switch and volume button 3 5 mm stereo headphones port Micro SD card port MicroUSB port ECC800 Data Center Controller User Manual for ECC800 Pro 3 Device Description Issue 02 2020 09 07 Copyright Huawei ...

Page 81: ...to 8 M 3264 x 2448 pixels front camera up to 1 9 M 1600x1200 pixels Battery Materials Li polymer Capacity 5100 mAh typical value or 4980 mAh rated value WiFi connection web page browse time about 6 5 hours Power adapter charge time about 3 5 hours 5 V 2 A adapter 3 2 19 T H Sensor 3 2 19 1 T H Sensor BOM Number 33010346 Figure 3 36 Appearance The T H sensor uses an RJ45 connector ECC800 Data Cente...

Page 82: ...pecifications Temperature measuring range 20 C to 70 C Temperature accuracy 0 3 C 25 C Humidity measuring range 0 100 RH Humidity accuracy 4 RH 25 C 30 80 RH Operating voltage 9 16 V DC Storage temperature 40 C to 80 C non condensing Output RS485 ECC800 Data Center Controller User Manual for ECC800 Pro 3 Device Description Issue 02 2020 09 07 Copyright Huawei Technologies Co Ltd 71 ...

Page 83: ...or Table 3 66 RJ11 port pin definitions Pin Description Pin1 or Pin 2 GND Pin3 RS485 Pin4 RS485 Pin5 or Pin 6 12V Table 3 67 T H sensor specifications Item Specifications Temperature measuring range 20 C to 70 C Temperature accuracy 1 C Operating temperature 10 C to 55 C Operating voltage 9 16 V DC ECC800 Data Center Controller User Manual for ECC800 Pro 3 Device Description Issue 02 2020 09 07 Co...

Page 84: ...ector NOTE The appearance of the T H sensor depends on the onsite delivery Figure 3 41 Pins of an RJ45 connector Table 3 68 RJ45 port pin definitions Pin Description Pin1 or Pin 4 A Pin2 or Pin 5 B Pin3 V Pin6 V Pin7 Reserved ECC800 Data Center Controller User Manual for ECC800 Pro 3 Device Description Issue 02 2020 09 07 Copyright Huawei Technologies Co Ltd 73 ...

Page 85: ...42 Appearance 1 RS485 OUT 2 RS485 IN 3 DIP switch 4 Button 5 NTC1 3 6 NTC4 6 7 Display Table 3 70 T H sensor specifications Item Temperature Humidity Measurement range 40 C to 70 C 0 100 RH Measurement precision 1 C 20 C to 60 C 5 RH 25 C 20 80 RH Extended temperature collection port Provides two RJ45 ports to connect to six NTC temperature sensors each RJ45 port connecting to three NTC temperatur...

Page 86: ...3 71 T H sensor specifications Item Temperature Humidity Measurement range 40 C to 70 C 1 99 RH Measurement precision 1 C 25 C 5 RH 25 C 20 80 RH Extended temperature collection port Provides two RJ45 ports to connect to six NTC temperature sensors each RJ45 port connecting to three NTC temperature sensors Signal port RS485 Power supply 5 16 V DC typical value 12 V DC ECC800 Data Center Controller...

Page 87: ...tem Specifications Number of supported remote control commands 4 Communication Interworks with the monitoring system over Modbus RTU to implement remote control The baud rate can be 9600 bit s Infrared emission distance 10 m Power supply 9 16 V DC Power 350 mA Operating temperature 10 C to 50 C Operating humidity 5 95 RH ECC800 Data Center Controller User Manual for ECC800 Pro 3 Device Description...

Page 88: ...tus accordingly supports battery tripping management and uploads data to the management unit through COM or PoE ports The iBAT is a battery monitoring module that monitors the voltages internal resistances and pole temperatures of batteries In the scenario with battery cabinets the iBOX is installed inside a smart module battery cabinet and the iBOX communications cable connects to a smart ETH gat...

Page 89: ...ery status data from the downstream iBAT groups through wireless communication and sends the data to the ECC UPS and the third party network management system NMS through COM or PoE ports ECC800 Data Center Controller User Manual for ECC800 Pro 3 Device Description Issue 02 2020 09 07 Copyright Huawei Technologies Co Ltd 78 ...

Page 90: ...ports BCB_2 BCB_4 reserved 9 BCB_OUT and BCB_IN ports 10 Networking switch 11 PWR indicator 12 RUN indicator 13 ALM indicator 14 RF_Z indicator 15 Delivered antenna Figure 3 47 iBOX bottom view 1 Fastener 2 Micro SD card slot 3 Default button IP reset 4 ADDR dual in line package DIP switch RS485 communications address ECC800 Data Center Controller User Manual for ECC800 Pro 3 Device Description Is...

Page 91: ...le is adopted to supply 12 V DC operating voltage 2 Table 3 74 48 V 0 5 A port pin definitions Pin Definition Description 1 The system provides 48 V DC operating voltage in this scenario 2 PoE Port Figure 3 49 PoE port pins ECC800 Data Center Controller User Manual for ECC800 Pro 3 Device Description Issue 02 2020 09 07 Copyright Huawei Technologies Co Ltd 80 ...

Page 92: ...r 2 TX 3 RX 4 5 P45_P1 6 RX 7 8 P78_P1 COM Port Figure 3 50 COM port pins Table 3 76 COM port pin definitions Pin Signal Description 1 RS485 Two cascaded RS485 communication ports 2 RS485 3 NC 4 RS485 5 RS485 6 GND 7 NC 8 NC ECC800 Data Center Controller User Manual for ECC800 Pro 3 Device Description Issue 02 2020 09 07 Copyright Huawei Technologies Co Ltd 81 ...

Page 93: ...ut signal Open The dry contact output is open Closed The dry contact output is closed Open 4 COM HALL Current Monitoring Port Figure 3 51 HALL current monitoring port pins Table 3 78 Pin definitions for HALL current monitoring ports Pin Definition Description 1 12V Detect the charge and discharge currents of four battery strings or eight battery routes 2 12V 3 AI 4 GND ECC800 Data Center Controlle...

Page 94: ...ot enough use multiple Hall effect sensors to monitor the current of one battery string The iBOX supports the sum of the monitoring results of multiple Hall effect sensors which is set through Multi Hall cur setting The value of Multi Hall cur setting equals the number of positive or negative Hall effect sensors in a single battery string and should be greater than or equal to 1 BCB Port Figure 3 ...

Page 95: ...i on 1 OL Specifies whether the BCB connects to the signal output port Specifies whether the cascaded BCBs connect to the signal input port Grounded BCB connected Disconnect ed BCB not connected Disconne cted Receives BCB comman ds sent by the UPS and supports BCB port cascadin g manage ment 2 STA Signal output port for the battery circuit breaker status Monitors whether the cascaded BCBs are conn...

Page 96: ...ry side ground DIP Switch Table 3 81 DIP switch description No Definition Description 1 ADDR_1 RS485 communications address setting 2 ADDR_2 3 ADDR_3 4 ADDR_4 Indicators Table 3 82 Indicators Indicat ors Color Meaning Status Description Measure RF_Z Green Wireless communi cation status Steady on No network parameters exist A network is to be created Requires no handling ECC800 Data Center Controll...

Page 97: ...ntly at super short intervals Blinking lasting for 10s Requires no handling Blinking at short intervals Communica tion fails No legitimate northbound data has been received for 3 minutes 1 Check whether the communication cable is loose If yes reconnect the communication cable If no go to the next step 2 Check whether the device is malfunctioning If yes replace the device If no contact Huawei techn...

Page 98: ... on for 0 125s and then off for 0 125s If an indicator blinks at super short intervals it is blinking at 10 Hz that is on for 0 05s and then off for 0 05s Blinking intermittently at short intervals means an indicator blinks at super short intervals for 0 5s and then remains off for 0 5s Networking Switch Table 3 83 Networking switch description Name Definition Function Button pressing Press the bu...

Page 99: ...1 2 iBAT The iBAT is a battery monitoring module that monitors the voltages internal resistances and pole temperatures of batteries and supports 12 V power Features Monitors the voltages internal resistances and pole temperatures of 12 V batteries Supports the hibernation function When it detects that the battery voltage is low it will enter the low power mode Communicates with the iBOX wirelessly...

Page 100: ... The networking succeeds Alarm Red ALM Off The iBAT is not faulty Steady on The iBAT is faulty Communication with the iBOX times out No network is connected The iBAT is waiting to connect to a network Blinking at super short intervals iBattery 2 0 Network parameters are being cleared The iBAT is blinking Blinking at short intervals iBattery 3 0 ECC800 Data Center Controller User Manual for ECC800 ...

Page 101: ...king Switch Table 3 86 Networking switch description Name Definition Function Button pressing Press the button for less than 5 seconds Searches for and joins a network if there is no network Initializes the network parameters if there is a network Button holding down Hold down the button for more than 5s Clears the current network and resets the wireless module disconnects the network ECC800 Data ...

Page 102: ... data transmission security the ECC800 Pro supports WebUI access through TLS Figure 4 1 Home page ECC800 Data Center Controller User Manual for ECC800 Pro 4 UI Description Issue 02 2020 09 07 Copyright Huawei Technologies Co Ltd 91 ...

Page 103: ...em Connected devices such as ECC800 Pro ETH Converter Group and Smart ETH Gateway Group Monitor the device running information in real time set device running parameters and control the device running For example set smart cooling product parameters delete devices failing in communication and set AIDI device parameters Yes For example in the path of Monitoring ECC800 Running Parameters AIDI_1 sens...

Page 104: ...oup and Skylight Actuator Group Yes Cooling Connected smart cooling products Yes Cabinet IT cabinet Yes Query Historical Alarms Query historical alarms No Performa nce Data Query device performance data No Operation Log Query operation logs No Access Event Query access control events No Export Data Export historical data and device data No ECC800 Data Center Controller User Manual for ECC800 Pro 4...

Page 105: ... module No IP for WAN_1 is 192 168 8 10 by default The default IP addresses of Primary DNS server and Secondary DNS server in the DNS Server Address area are 192 168 8 10 IP for WAN_2 is 192 168 0 10 by default Time Set the time zone time and date No Access Managem ent Set the access users and permissions No Video Managem ent Add modify or delete videos Yes NMS Applicatio n NetEco Set SNMP and Net...

Page 106: ...y certificate for device access No Security Certification Change No Smart Module Cascading Cascade up to three ECC800 Pros through multi module configuration Yes PUE Configura tion Set PUE parameters Yes PUE Function is Enable by default PUE configuration mode is Standard by default Linkage Control Set PLC linkage rules Yes Alarm Parameter s Basic Alarm Parameters Set basic alarm parameters and al...

Page 107: ...rade Upgrade the software of the ECC800 Pro and its southbound devices online Yes Version Informati on Query the device version and access package version such as the software version and hardware version No E Label Query or export E labels No User Managem ent Manage users such as adding modifying and deleting users No Configura tion File Import and export configuration files to configure devices ...

Page 108: ...ard and set simple parameters as instructed by the wizard No Life Cycle Check the service life of main devices No a The factory settings can be restored only on the WebUI b If the system type is FusionModule800 only the intelligent power distribution scenario is supported c Multi Module Monitoring is displayed on the Home page only after you set Smart Module Cascading d If the system type is Fusio...

Page 109: ...he self diagnosis function iCooling Allows you to view the cooling distribution in smart modules and operating status of components on the cooling link diagram page More Monitor Allows you to view details about devices under the monitoring system power distribution aisle cooling and cabinet types Software Upgrade Allows you to upgrade the software using a USB flash drive or locally Paramet er Sync...

Page 110: ...rforma nce Data Allows you to view device performance data such as the battery curve and battery discharge curve Network Paramet er Operatio n Log Access Event Asset Details Allows you to view device asset details such as electronic labels of system devices and other devices Device Version Info Check the Software Version and Hardware Version of the device 4 3 Pad App Figure 4 3 Home screen ECC800 ...

Page 111: ...B flash drive or locally Paramet er Sync iFind Allows you to modify the names and positions of devices in the device layout diagram and deliver a blinking command to a device under iFind Export Data Allows you to export device configuration data current configuration files and historical data Import Data Allows you to import a configuration file Performa nce Data Allows you to view device performa...

Page 112: ...r replacing the device or ECC800 Pro set monitoring parameters and add the device 5 1 Preparations and WebUI Login Prerequisites Supported operating system Windows 7 and later versions It is recommended that the screen resolution be 1366 x 768 or higher Browser Chrome Firefox Internet Explorer 11 or later Procedure Step 1 Connect a network cable between the PC network port and the WAN1 port protec...

Page 113: ...ault gateway is 192 168 8 1 set the PC IP address to 192 168 8 12 subnet mask to 255 255 255 0 and default gateway to 192 168 8 1 Step 3 Set LAN parameters NOTE If the ECC800 Pro connects to a LAN and a proxy server has been selected perform Step 3 3 and Step 3 4 If the ECC800 Pro connects to the Internet and the PC in a LAN accesses the Internet over a proxy server do not perform Step 3 3 and Ste...

Page 114: ...d or exception after login The following provides the details 1 Open Internet Explorer and choose Tools Internet Options General 2 Select Delete browsing history on exit and click Delete 3 In the Delete Browsing History dialog box select all options except Password and click Delete Step 5 Log in to the ECC800 Pro WebUI 1 Enter https monitoring IP address such as monitoring IP address https 192 168...

Page 115: ...etrieved An account is logged out due to timeout if no operation is performed within 10 minutes after system login A maximum of three users can log in to the ECC800 Pro WebUI at the same time End 5 2 Performing Startup Password Authentication for FusionModule800 When the system type is FusionModule800 perform the following steps to configure it Context The initial startup password authentication i...

Page 116: ...rt and tap Download to obtain the installation package a Open the browser on the pad enter www baidu com in the address box search for Huawei AppGallery select Ordinary Download and tap Save b Install the Huawei AppGallery If the downloaded file exists in the drop down list box tap the file to install the Huawei AppGallery If the downloaded file does not exist in the drop down list box choose File...

Page 117: ...ication to Activated the startup password authentication is complete NOTE After the first login change the password in time to ensure system access security When the mobile phone app connects to the monitoring system the WiFi function of the monitoring system is disabled by default Before connecting the mobile phone app to the monitoring system enable the WiFi function on the WebUI For security yo...

Page 118: ... Next and Skip as required To exit before the configuration is complete click Finish to terminate the configuration directly Step 4 After configuring the parameters click Finish Step 5 After confirming that the commissioning Result is normal enter the Checker Name and Check Date and click Configuration Completed NOTE To export the configuration result click Export Check Result The export file form...

Page 119: ...ation Step 2 Set related outbox parameters 1 Set related parameters in the Outbox Settings area on the Mailbox Settings page If the address type of the outbox is Domain name choose System Settings System Parameters and set related parameters in the DNS Server Address area on the Monitor IP page NOTE The DNS server address is provided by the local network operator 2 Click Test to check the email se...

Page 120: ...inking cursor and press Enter to obtain email server IP addresses Non encryption 25 The email server must comply with the standard SMTP protocol to ensure that the email sending and receiving functions are normal Enter the email client authorizatio n password at Password for 163 Mail 126 Mail and QQ Mail 163 Mail smtp 163 com Non encryption 25 SSL encryption 465 126 Mail smtp 126 com Non encryptio...

Page 121: ...an email address to receive emails NOTE The email address is used only for configuring the email function and is not used for other purposes The address is encrypted during transmission in the ECC800 Pro to ensure that the personal data of users is fully protected Figure 5 5 Adding an email address to receive emails ECC800 Data Center Controller User Manual for ECC800 Pro 5 Power On Commissioning ...

Page 122: ...ng transmission in the ECC800 Pro to ensure that the personal data of users is fully protected Figure 5 6 Adding a mobile number NOTE Click Test to check whether the added mobile phone number is available If it is available Successfully to send the test short message is displayed If it is unavailable Failed to send the test short message is displayed Check whether the receiver s mobile phone param...

Page 123: ... after it is added in Mailbox Settings Mobile Phone Number can be selected after it is added in SMS Settings Step 6 Click Confirm to access the re authentication page Enter Login password and click Submit End ECC800 Data Center Controller User Manual for ECC800 Pro 5 Power On Commissioning Issue 02 2020 09 07 Copyright Huawei Technologies Co Ltd 112 ...

Page 124: ...r a general input unit Path Parameter Name Defaul t Value Setting Monitoring Power Distribution General Input Unit Running Parameters Power Distribution Settings Rated system frequency 50 Set based on actual conditions Rated system voltage 380 Set based on actual conditions Rated system current NOTE This parameter is not displayed for some general input units 250 Set based on actual conditions NOT...

Page 125: ...mple of how to display two branches for power distribution unit1 Choose Monitoring Power Distribution General Input Unit Power Distribution Unit Display Configuration select Branch Information Display corresponding to QF1 and QF2 and then tap Submit 3 Configure the power distribution settings for power distribution unit 1 Table 5 4 Power distribution settings for a power distribution unit Path Par...

Page 126: ...he parameters for other power distribution units in the same way or by synchronizing parameters Path Maintenance Parameter Sync End 5 6 Commissioning the eLight If an eLight is installed perform the following steps to configure it Procedure Step 1 Ensure that the device address of the eLight actuator is the default value 2 Toggle switches 1 to 4 of the DIP switch specify the device address in bina...

Page 127: ... red green blue and white in sequence for 3 seconds respectively and then turns off Step 3 Set eLight parameters 1 Log in to the ECC800 Pro WebUI as an administrator 2 In the Smart Module View click Modify Device Select an eLight actuator under Devices drag it to the access actuator to which you want to bind the eLight actuator and click Exit Edit Mode Figure 5 9 eLight actuator position ECC800 Da...

Page 128: ...ctuator The Running Parameters page is displayed 2 Select the Associated alarm severity as required and click Submit Table 5 8 Function commissioning Item Alarm Severity Selection Description Associated alarm severity Critical If there is a critical alarm the eLight strip light turns on with a red light Critical Major If there are multiple alarms the eLight strip light preferentially turns on with...

Page 129: ...indicates 1 and OFF indicates 0 Table 5 9 Setting a device address Address Toggle Switch 1 Toggle Switch 2 Toggle Switch 3 Toggle Switch 4 1 ON OFF OFF OFF 2 OFF ON OFF OFF 3 ON ON OFF OFF 4 OFF OFF ON OFF Step 2 Add an eLight 1 Log in to the ECC800 Pro WebUI as an administrator 2 Add an eLight Table 5 10 Adding an eLight Path Parameter Setting Choose System Settings Device Management and click Ad...

Page 130: ... parameters Step 3 Set eLight parameters 1 Log in to the ECC800 Pro WebUI as an administrator 2 Choose Monitoring Aisle eLight Actuator Group eLight Actuator The Running Parameters page is displayed 3 Select the Associated alarm severity as required and click Submit Table 5 11 Function check Item Alarm Severity Selection Description Associated alarm severity Critical If there is a critical alarm t...

Page 131: ...m the following steps to configure it Prerequisites One end of the straight through cable has been connected to the COM port on the PDU2000 and the other end has been connected to the COM port on the ETH converter Context Table 5 12 PDU2000 basic Information Vendor Name Displayed on the WebUI Eleventh and Twelfth Characters in Device Barcodea Clever PDU2000 M C FT Haipengxin PDU2000 M H 6B a The b...

Page 132: ...eter settings take effect only if you press MENU and then the PDU2000 M C buzzes and restarts If you do not press MENU the PDU2000 M C buzzes and restarts automatically after 30s and the settings are not saved Set the PDU2000 M H monitoring parameters NOTE The display of a single phase module is used as an example After the PDU2000 M H is powered on press MENU The LCM displays Press MENU again to ...

Page 133: ... drop down list box Device Type Select PDU2000 M C or PDU2000 M H from the drop down list box based on the actual device Connect To Select ETH Actuator1 from the drop down list box NOTE The setting example indicates that the PDU2000 is connected to the ETH Actuator1 Communicati ons Port COM1 COM2 Device Address Enter the actual device address of the PDU2000 3 Click Test Connect to check whether th...

Page 134: ...2 Procedure Step 1 Optional Check whether the cabinet door lock is leveled to 2000 3 mm If not adjust it Step 2 Optional If the cabinet door still cannot be opened after step 1 is performed adjust the position of the cabinet electronic clasp lock by using the slotted holes until the cabinet door can be opened and closed properly Step 3 Set device addresses for cabinet electronic clasp locks A cabi...

Page 135: ...dd a cabinet electronic clasp lock Table 5 15 Adding an E LOCK Path Parameter Setting Choose System Settings Device Management and click Add Device The parameters for adding devices are displayed Device attribute Elock Device Type E LOCK Connect To ECC800 Communicat ions Port odd numbered cabinets COM2 even numbered cabinets COM3 Device Address Enter the actual device address of the cabinet electr...

Page 136: ...ock name Click the Running Parameters tab Change the cabinet electronic clasp lock name Remotely open a cabinet electronic clasp lock Click the Controls tab Select Open front door or Open back door from the Cabinet door control drop down list box and click Submit to remotely open the door Open cabinet electronic clasp locks in batches Choose Monitoring Cabinet click the Controls tab Select Open fr...

Page 137: ...meters Step 2 Set device performance parameters on the Performance Parameters page Select the device to be set under Device Type and click Confirm All performance parameters of the selected device are displayed Figure 6 1 Performance parameter setting page Step 3 Set device performance parameters select the performance parameters to be submitted in the first column set Collecting Data and click Su...

Page 138: ...IP addresses of other smart module ECC800 Pros in the room are added to an ECC800 Pro their active alarms and PUE data can be displayed and viewed You can click links on the cascading management page of the master ECC800 Pro to display the login pages of the other ECC800 Pros Then you can log in to view the details Procedure Step 1 Log in to the ECC800 Pro WebUI as an administrator Step 2 Choose S...

Page 139: ...or alarm severity in the Active alarms area End 6 3 Commissioning a UIM20A Expansion Module Context Devices connected through the UIM20A expansion module UIM for short can be automatically or manually bound in the smart module view Procedure Step 1 Log in to the ECC800 Pro WebUI as an administrator Step 2 Choose System Settings Device Management and click Auto Discover Device to add the device Dev...

Page 140: ... intelligent devices is monitored in each cabinet The port for connecting the intelligent device to the UIM must meet the physical connection rules in Table 6 2 NOTE This scenario supports four types of intelligent devices smart U space manager intelligent rPDU cabinet electronic lock and T H sensor Each port on the UIM does not support cascading The UIM must be installed in the first cabinet and ...

Page 141: ...ario a UIM is not bound to the IT cabinet Only the T H sensor inside the cabinet can be connected to the UIM Table 6 3 Cable connection mode in a temperature map scenario COM Port COM1 COM3 COM5 COM7 Connected Device T H sensor group T H sensor group T H sensor group T H sensor group COM Port COM2 COM4 COM6 COM8 Connected Device N A N A N A N A Step 5 Optional Click Add set IT Cabinet select a UIM...

Page 142: ...inks in the smart module view End 6 4 Access Management 6 4 1 Commissioning a Door Status Sensor 6 4 1 1 Commissioning a Door Status Sensor Connected to the AI DI port on the Independent Deployment AI_DI Unit If a door status sensor is installed perform the following steps to configure it Context To use the AI DI sensor enable the corresponding AI DI port and name the sensor After that the specifi...

Page 143: ...or to Enable and click Submit 7 Set Door1 sensor type to Door sensor ensure that Door1 power supply is Yes and click Submit 8 Perform the preceding operations to set parameters for ports AI DI_2 to AI DI_8 Step 2 Check the door status sensor functions Table 6 4 Function check Check Method Normal Connection Status Open the cabinet door Door1 DI alarm is generated on the active alarm page of the app...

Page 144: ...ont and rear doors a cabinet door open alarm is displayed on the active alarm screen of the app or the active alarm page of the WebUI End 6 4 1 3 Commissioning a Door Status Sensor Connected to the AI DI Port on the UIM20A Expansion Module If a door status sensor is installed perform the following steps to configure it Context To use the AI DI sensor enable the corresponding AI DI port and name th...

Page 145: ...tions to set parameters for ports AI DI_2 to AI DI_8 Step 2 Check the door status sensor functions Table 6 7 Function check Check Method Normal Connection Status Open the cabinet door Door1 DI alarm is generated on the active alarm page of the app or WebUI End 6 4 1 4 Commissioning the Door Status Sensor Connected to the ECC800 Pro Context If the sensor is preinstalled only check its settings Proc...

Page 146: ...gs 8 Set Door2 sensor to Enable set Door2 sensor type to Door sensor and click Submit Step 3 If there are more than two cabinets set the door status sensor parameters 1 Set door status sensor parameters for the IT cabinet by referring to step 1 2 Choose System Settings Signal Name Modify The Batch Signal Configuration page is displayed 3 Set Device Type to UIM set Device Name to UIM and click OK 4...

Page 147: ...access user management and access permission management 1 Choose System Settings Access Management to access the access management page The system supports the management of various access permissions through the access card password and fingerprint 2 Click Authentication Mode and set the authorization mode for the smart module actuator or access actuator Select Card Fingerprint Card and password ...

Page 148: ...er user ID password To query the user ID log in to the ECC800 Pro WebUI as an administrator Choose System Settings Access Management In the Authorization area view the user ID corresponding to the user name 3 Select the configured access actuator and click OK to complete setting the authorization mode 4 On the Authorization Operations tab page click Add to access the new user page On the Basic Inf...

Page 149: ... ECC800 Pro to ensure that the personal data of users is fully protected Figure 6 5 Adding access users On the Authorization Information and Term of Authorization tab pages select access users whose access permissions are to be set and set Authorized Device Authorization Mode Cabinet Lock Start time and End time Access Actuator Select the authorized access actuator for the user based on the actual...

Page 150: ...vices close the Synchronize Access Permission page Step 2 Set an alarm for card readers Set Logical level configuration for reader removed based on the fingerprint reader configured for the access control system If the access control system uses a Card and password reader choose Monitoring Aisle Access Actuator Group Access Actuator n on the ECC800 Pro WebUI click Running Parameters and set Logica...

Page 151: ...ring Aisle Access Actuator Group Access Actuator n and click Controls to open the door remotely For method 1 The aisle door is opened successfully For method 2 After you choose Query Access Event on the WebUI you can view the type of this access control event Step 4 Check the functions of the cabinet electric lock Table 6 11 Function commissioning Check Method Normal Connection Status Method 1 Ens...

Page 152: ...kylight button when the aisle door is closed The skylight can be opened manually Step 3 Check functions of the atmosphere light Table 6 14 Function commissioning Check Method Normal Connection Status Press the atmosphere light button The atmosphere light is steady blue Step 4 Check functions of the emergency button Table 6 15 Function commissioning Check Method Normal Connection Status Follow up P...

Page 153: ... the function of an emergency door release button Table 6 17 Function commissioning Check Method Normal Connection Status Follow up Procedure When the room door is properly closed short circuit the wiring terminals NC and COM or NO and COM on the emergency door release button The room door is opened properly Remove the short circuit cable from the wiring terminals NC and COM or NO and COM on the e...

Page 154: ... are advised to evenly distribute the cameras to each VCN A maximum of four cameras can be connected in the smart ETH gateway networking scenario Figure 6 8 Camera VCN connecting to the ETH gateway NOTICE To ensure the normal operating of the ECC800 Pro avoid high data traffic such as the concurrent display of dynamic monitoring of cameras and VCN500 video playback To ensure the normal operating o...

Page 155: ...eway and the smart ETH gateway communicates properly with the ECC800 Pro The camera software version is later than V500R019C30 Context Before commissioning the IPC6325 camera set the IP address for the IPC6325 camera based on customer requirements Configure the camera or VCN internal IP address and the IP address of the LAN port on the ECC800 Pro in the same network segment Configure the camera or...

Page 156: ...t connect the smart ETH gateway to the LAN1 and LAN2 ports on the ECC800 Pro 2 Use a network cable to connect the PC to the PoE port on the smart ETH gateway Then set the local IP address of the PC to 192 168 0 11 3 Remove the camera shell and press the reset button for 6s to 10s to restart the camera Figure 6 10 Reset button 1 Reset button 4 Enter https 192 168 0 120 in the address box of a brows...

Page 157: ...ble the ActiveX controls and plug ins or set them to the prompt mode 1 Choose Tools Internet Options The Internet Options dialog box is displayed 2 Click the Security tab 3 Select Internet 4 Click Custom level The Security Settings Internet Zone dialog box is displayed 5 Set Automatic prompting for ActiveX controls to Enable and set Download unsigned ActiveX controls and Initialize and script Acti...

Page 158: ...3 Select Internet 4 Click Custom level The Security Settings Internet Zone dialog box is displayed 5 Set Use Pop up Blocker to Disable 6 Click OK 5 Choose Settings Network Platform Connection Second Protocol Parameters and select Enable ONVIF Figure 6 11 ONVIF parameters 6 Remove the network cable from the PC to the PoE port on the ETH gateway 7 Connect the PC to the LAN1 port on the ECC800 Pro us...

Page 159: ...assword HuaWei123 and click Log In Figure 6 12 Clicking the camera access link 5 Choose Settings Network TCP IP set Way to obtain IPv4 to Use the following IP address and set an IP address to the planned IP address for the camera The IP address should be in the range of 192 168 248 50 to 192 168 248 199 Step 3 On the ECC800 Pro WebUI click Add under Video Information In the New Video Information d...

Page 160: ...r the new password in Password Otherwise the ECC800 Pro cannot collect motion detection alarms from the IP camera Figure 6 14 Adding video information Figure 6 15 IP camera ONVIF interface access password Step 4 Click Confirm after video information is entered Step 5 In the Video Information list click the link under the Link column and go to the camera WebUI as prompted ECC800 Data Center Control...

Page 161: ...the lens if necessary 2 Optional If the VCN is not configured configure an SD card For details see 6 5 3 2 Commissioning IPC6325 Camera SD Card Configured 3 Choose Settings Video Audio Image Video Settings and set camera stream type primary stream and secondary stream 1 parameters NOTICE Set the encoding protocol to H 265 Figure 6 16 Setting primary stream parameters ECC800 Data Center Controller ...

Page 162: ...g in to the Huawei IPC WebUI Step 2 Format the SD card 1 Choose Settings System Configuration Storage Management 2 The Storage Management page is displayed Format the SD card Step 3 Set the camera stream type and primary stream parameters Path Settings Video Audio Image Video Settings ECC800 Data Center Controller User Manual for ECC800 Pro 6 Feature Description Issue 02 2020 09 07 Copyright Huawe...

Page 163: ...lt Encoding Protocol Resolution Frame Rate I Frame Interval Minimum Bit Rate Required Supported Video Storage Duration h H 265 1080P 25 50 1M 66 H 264 1080P 25 50 1M 66 H 265 720P 25 50 0 8M 75 H 264 720P 25 50 1M 66 H 265 720P 25 50 0 6M 105 H 264 720P 25 50 0 8M 75 ECC800 Data Center Controller User Manual for ECC800 Pro 6 Feature Description Issue 02 2020 09 07 Copyright Huawei Technologies Co ...

Page 164: ...motion detection parameters Step 5 Set the deployment policy Figure 6 20 Setting the deployment policy Step 6 Set the alarm linkage policy Figure 6 21 Setting the alarm linkage policy End ECC800 Data Center Controller User Manual for ECC800 Pro 6 Feature Description Issue 02 2020 09 07 Copyright Huawei Technologies Co Ltd 153 ...

Page 165: ...e customer The following IP addresses are for reference only Table 6 22 IP address planning Device Internal IP Address External IP Address Camera Example 192 168 248 50 range 192 168 248 50 192 168 248 199 Camera external IP address NOTE The 192 168 246 X network segment cannot be set VCN Example 192 168 248 51 range 192 168 248 50 192 168 248 199 VCN external IP address NOTE The 192 168 246 X net...

Page 166: ... displayed 2 Click the Connections tab 3 Click LAN Settings 4 Deselect Use a proxy for your LAN 5 Click OK Enable the ActiveX controls and plug ins or set them to the prompt mode 1 Choose Tools Internet Options The Internet Options dialog box is displayed 2 Click the Security tab 3 Select Internet 4 Click Custom level The Security Settings Internet Zone dialog box is displayed 5 Set Automatic prom...

Page 167: ...S 1 2 4 Click OK Set Use Pop up Blocker to Disable 1 Choose Tools Internet Options The Internet Options dialog box is displayed 2 Click the Security tab 3 Select Internet 4 Click Custom level The Security Settings Internet Zone dialog box is displayed 5 Set Use Pop up Blocker to Disable 6 Click OK 5 Choose View Network Time Second Protocol Parameters and select Enable ONVIF ECC800 Data Center Cont...

Page 168: ... Search NOTE The search timeout interval is 10s If the search fails a search failure message is displayed To avoid missing cameras you can perform Search for multiple times 3 On the found camera record click and set the external IP address for the camera based on the external IP address allocated by the network administrator PC IP address and camera external IP address should be in the same networ...

Page 169: ...ual IP address planned by the customer prevails Internal IP Enter the internal IP address of the camera or VCN for example 192 168 248 56 Figure 6 25 Allocated internal IP address of the camera Video Type Select the video type based on the customer s device Link Enter the external IP address of the camera for example https external IP address of the camera Change IP camera ONVIF interface access p...

Page 170: ...ocuments delivered with the device or the documents obtained by referring to the Preparing Documentation section 1 Preview the site situation in real time and check the camera coverage through videos Adjust the lens if necessary 2 Optional Configure an SD card if the VCN is not configured 3 Choose Settings Video Audio Image Video Settings and set camera stream type primary stream and secondary str...

Page 171: ...e encoding protocol to H 265 Figure 6 28 Setting primary stream parameters ECC800 Data Center Controller User Manual for ECC800 Pro 6 Feature Description Issue 02 2020 09 07 Copyright Huawei Technologies Co Ltd 160 ...

Page 172: ...Log in to the camera WebUI Step 2 Format the SD card 1 Choose Settings System Configuration Storage Management 2 The Storage Management page is displayed Format the SD card Step 3 Set the camera stream type and primary stream parameters Path Settings Video Audio Image Video Settings ECC800 Data Center Controller User Manual for ECC800 Pro 6 Feature Description Issue 02 2020 09 07 Copyright Huawei ...

Page 173: ...eo Storage Duration h H 265 1080P 25 50 1 Mbit s 66 H 264 1080P 25 50 1 Mbit s 66 H 265 720P 25 50 0 8 Mbit s 75 H 264 720P 25 50 1 Mbit s 66 H 265 720P 25 50 0 6 Mbit s 105 H 264 720P 25 50 0 8 Mbit s 75 Step 4 Choose Settings Intelligent Analysis Common Intelligence Select Enable click Add add motion detection areas set motion detection parameters and click Save ECC800 Data Center Controller Use...

Page 174: ...on of one camera and disconnect connections from other cameras After commissioning the connected camera commission other cameras in the same way Procedure Step 1 Log in to the camera WebUI 1 Configure the PC IP address and the camera IP address in the same network segment Enter the camera IP address 192 168 0 120 by default in the address bar of the Internet Explorer and press Enter ECC800 Data Ce...

Page 175: ... 6 20 Table 6 25 Web browser settings Settings Action Disable the proxy 1 Choose Tools Internet Options The Internet Options dialog box is displayed 2 Click the Connections tab 3 Click LAN Setting 4 Deselect Use a proxy for your LAN 5 Click OK Enable the ActiveX controls and plug ins or set them to the prompt mode 1 Choose Tools Internet Options The Internet Options dialog box is displayed 2 Click...

Page 176: ...ker to Disable 6 Click OK Step 2 For details about how to commission IP cameras and set parameters for them see the documentation delivered with the equipment or obtain the documentation by referring to the Preparing Documentation section 1 Preview the site situation in real time and check the camera coverage through videos Adjust the lens if necessary 2 Choose Settings Network Configuration Netwo...

Page 177: ...Figure 6 33 Setting primary stream parameters ECC800 Data Center Controller User Manual for ECC800 Pro 6 Feature Description Issue 02 2020 09 07 Copyright Huawei Technologies Co Ltd 166 ...

Page 178: ...cedure Procedure Step 1 Log in to the Huawei IPC WebUI 1 Configure the PC IP address and the camera IP address in the same network segment Enter the camera IP address 192 168 0 120 by default in the address bar of the Internet Explorer and press Enter 2 Enter the preset user name admin and the preset password HuaWei123 and click Log In ECC800 Data Center Controller User Manual for ECC800 Pro 6 Fea...

Page 179: ...ress IPv4 subnet mask and IPv4 gateway address to the planned values Figure 6 35 Basic camera configuration 3 Format the SD card a Choose Settings System Configuration Storage Management b The Storage Management page is displayed Format the SD card 4 Set the camera stream type and primary stream parameters Path Settings Video Audio Image Video Settings Figure 6 36 Setting audio and video parameter...

Page 180: ... 25 50 1M 66 H 264 1080P 25 50 1M 66 H 265 720P 25 50 0 8M 75 H 264 720P 25 50 1M 66 H 265 720P 25 50 0 6M 105 H 264 720P 25 50 0 8M 75 5 Select Enable click Add add motion detection areas set motion detection parameters and click Save Figure 6 37 Setting motion detection parameters 6 Set the deployment policy Figure 6 38 Setting the deployment policy ECC800 Data Center Controller User Manual for ...

Page 181: ... press Enter NOTE The following lists the requirements for the operating system and browser of the camera WebUI Supports Windows 7 Internet Explorer 10 11 Chrome 38 FireFox 35 51 Supports Windows 8 Internet Explorer 10 11 Chrome 38 FireFox 35 51 Supports Windows 10 Internet Explorer 11 Chrome 38 FireFox 35 51 The Internet Explorer tab plugin needs to be installed for Google Chrome 45 and later ver...

Page 182: ...gs Internet Zone dialog box is displayed 5 Set Automatic prompting for ActiveX controls to Enable and set Download unsigned ActiveX controls and Initialize and script ActiveX controls not marked as safe for scripting to Prompt 6 Click OK Enable TLS 1 1 or TLS 1 2 NOTE You must enable TLS 1 1 or TLS 1 2 when the HTTPS protocol is used to access the camera Otherwise the camera WebUI cannot be opened...

Page 183: ...able 6 Click OK Step 2 Commission cameras and set parameters for them For details see the delivered documents 1 Preview the site situation in real time and check the camera coverage through videos Adjust the lens if necessary 2 On the View tab page click the Network Time tab to access the Network Time tab page Figure 6 40 Setting the IP address ECC800 Data Center Controller User Manual for ECC800 ...

Page 184: ... enter an IP address starting with a value that ranges from 1 to 223 IPv4 gateway Gateway IP address of the network where the camera is located The default value is 192 168 0 1 IPv4 subnet mask Subnet mask of the network where the camera is located The default value is 255 255 255 0 Primary DNS Primary DNS IP address The default value is 0 0 0 0 Secondary DNS Secondary DNS IP address The default v...

Page 185: ...amera can automatically adapt to scenarios to reduce the bit rate and save the storage space A higher intelligent encoding level indicates more significant reduction of the bit rate which however may lead to image quality deterioration Slice This parameter is available only when you set Encoding protocol to H 264 Multi slice encoding indicates that video streams are divided into multiple segments ...

Page 186: ...s clearer images and higher bandwidth consumption Bit rate type This parameter is available only when you set Encoding protocol to H 264 or H 265 The bit rate is measured by data bits transmitted in a unit of time Variable bit rate The bit rate varies depending on the image complexity to ensure the clarity of images with great dynamic changes The bit rate is low if the image is simple or static Th...

Page 187: ...y when you set Encoding protocol to H 264 or H 265 An I frame is an intra coded frame that represents a fixed image independent of other picture types Each group of pictures GOP begins with this type of frame A smaller I frame interval indicates better video quality and higher bandwidth consumption Layered encoding This parameter is available only when you set Encoding protocol to H 264 or H 265 T...

Page 188: ...rring to the Preparing Documentation section 1 Preview the site situation in real time and check the camera coverage through videos Adjust the lens if necessary 2 Set IPv4 address IPv4 subnet mask and IPv4 gateway address to the planned values Figure 6 43 Setting the IP address of the camera 3 Format the SD card a Choose Settings System Configuration Storage Management b The Storage Management pag...

Page 189: ...l Resolutio n Frame Rate I Frame Interval Minimum Bit Rate Required Supporte d Video Storage Duration h H 265 1080P 25 50 1 Mbit s 66 H 264 1080P 25 50 1 Mbit s 66 H 265 720P 25 50 0 8 Mbit s 75 H 264 720P 25 50 1 Mbit s 66 H 265 720P 25 50 0 6 Mbit s 105 H 264 720P 25 50 0 8 Mbit s 75 ECC800 Data Center Controller User Manual for ECC800 Pro 6 Feature Description Issue 02 2020 09 07 Copyright Huaw...

Page 190: ...olicy End 6 5 5 Initializing VCN510 Disks Background When the VCN510 is delivered to the site recording data can be stored only after you install and initialize the disks Procedure Step 1 Log in to the OMU portal of the VCN as user admin Step 2 Choose Local Configuration Local Disk Step 3 In the upper right corner of the RAID Groups area click Initial disk ECC800 Data Center Controller User Manual...

Page 191: ... disks that work independently NON RAID If disks work independently recording data is stored into two disks in sequence ensuring high disk usage However the data storage reliability of disks that work independently is lower than that of RAID1 Step 5 Click Start A risk warning is displayed Step 6 Click OK The system starts to initialize the disks NOTE The server will be restarted during the initial...

Page 192: ...e disk is synchronizing data in the system partition to the system partition of another disk The synchronization process takes about 20 hours which does not impact services During this process do not remove and insert disks If the OMU portal stays at the Local Disk tab page even if users do not perform any operation for a long period of time the OMU portal will not automatically return to the logi...

Page 193: ...ss for VCN510 VCN520 VCN540 is https 192 168 2 101 8443 in the address bar of the Internet Explorer and press the Enter button NOTE The OMU Portal supports Internet Explorer 8 0 and later versions 2 On the login page enter the user name admin and preset password Change_Me and click Log In to enter the OMU Portal page A message is displayed upon the first login indicating that you should modify the...

Page 194: ...and Time config based on the time of the source server to be synchronized 5 Choose Maintenance Unified Configuration set Module name to MU and click Search 6 In the search result click Edit in the row where the value of Parameter Name is NatIP and set Value to the external IP address of the VCN Click Save Figure 6 52 Setting the external IP address of the MU NOTE Set NatIP to the external IP addre...

Page 195: ...e After the camera NTP synchronization function is enabled the camera after being connected to the server will automatically time synchronize with the server End Follow up Procedure The VCN automatically restarts after the IP address is modified The restart takes about 5 minutes After the restart use the new IP address to access the VCN Change the PC IP address to an address in the network segment...

Page 196: ...ple In the search result click the Software Download tab click the version and patch number corresponding to the current version and download the Client Package zip software package Figure 6 55 Client Package search result 2 Right click HW_IVS_Client exe and choose Run as administrator from the shortcut menu Use the default installation mode until the installation is complete 3 Right click the cli...

Page 197: ... access NOTE If there are multiple VCNs for multiple smart modules you are advised to evenly distribute the cameras to each VCN 3 Click Search in each camera record enter the user name and password in the text boxes and click Verify If the camera is verified successfully select cameras to add and click Next 4 Preview live video images click the camera in the camera list on the left and adjust came...

Page 198: ... page is displayed NOTE When creating a user you can select Enable account validity period and set Valid from and Valid to to set the account validity period for the created user Figure 6 56 Creating a user 3 Set Multi point logins to a value greater than 2 4 In the Assign Device View Rights area select the cameras to be browsed and queried by the user Set other parameters based on the documentati...

Page 199: ...aised the smart cooling products turn off automatically Intelligent lighting a off If this linkage status is set to on an infrared alarm is raised when the camera detects human motion and the aisle lights turn on automatically for authorized door opening Link fire control with skylight open Open door turn on lights by fire linkage a Link fire control with air conditioner off off If you set this li...

Page 200: ...e extinguishing system in the customer s equipment room can quickly function in the aisle 2 Enable the aisle access control system and turn on the lighting to facilitate escape 3 Shut down the smart cooling product and prevent the smart cooling product from supplying air to increase the fire NOTE An active dry contact signal of the customer s fire extinguishing system cannot be connected to the EC...

Page 201: ...gnal name 1 Log in to the ECC800 Pro WebUI as an administrator 2 Choose System Settings Signal Name Modify The Batch Signal Configuration page is displayed 3 Set Device type to ECC800 set Device name to ECC800 and click OK 4 On the query result tab page set the new signal name of AI DI_3 to Fire and click Submit Step 7 Enable the AI DI device 1 Choose Monitoring System ECC800 Running Parameters AI...

Page 202: ... the smart module actuator The setting process is similar 6 6 1 2 High Temperature Linkage Context The ECC800 Pro implements high temperature linkage If it detects high temperature alarms by interacting with multi functional sensors and all smart cooling products fail to communicate with the ECC800 Pro the ECC800 Pro opens skylights based on the alarm status to facilitate heat dissipation The defa...

Page 203: ...sor fail to detect any person in the aisle within 10 minutes NOTE When using the intelligent lighting function pay attention to the following If a foreign object is hung on the skylight ceiling of the smart module and when the foreign object moves the camera may mistakenly generate a motion detection alarm to change the lighting status When the human body moves the camera generates a motion detect...

Page 204: ...or on the AC actuator turns from steady green to blinking green intermittently at super short intervals blinking at super short intervals for 0 5 seconds and then off for 0 5 seconds The component enters the wireless network search status 3 After the wireless networking 802 15 4 pairing succeeds the RF_Z indicator on the AC actuator starts to blink at long intervals 4 After all AC actuators are ne...

Page 205: ...or click Running Parameters Step 8 Set camera parameters NOTE If the camera is connected to the smart ETH gateway you need to set camera parameters for intelligent lighting linkage The camera checks whether there are people motions in the aisle and an infrared alarm is generated If so the AC actuator turns on the lights If the IP address of the camera that is automatically connected is the same as...

Page 206: ...ection Area Parameters 4 Select Enable click Add add motion detection areas set motion detection parameters and click Save Figure 6 60 Setting motion detection parameters 5 If there are multiple cameras repeat Step 8 1 Step 8 3 End ECC800 Data Center Controller User Manual for ECC800 Pro 6 Feature Description Issue 02 2020 09 07 Copyright Huawei Technologies Co Ltd 195 ...

Page 207: ...sor type to Normal open or Normal close and click Submit NOTE If a skylight button is connected perform Step 3 and Step 4 Step 5 Choose Monitoring Aisle Skylight Actuator Group Skylight Actuator 1 Running Parameters DI1 alarm level NOTE When a smart module actuator is configured you need to set parameters for the smart module actuator The setting process is similar Step 6 Set DI1 alarm level to Lo...

Page 208: ...e Linkage Logic List tab page are unavailable Step 12 Check the Link smoke alarm with skylight open linkage function Table 6 37 Function check Check Method Expected Result When the skylight in the aisle is closed press the skylight button to open the skylight Smoke DI alarm is displayed on the active alarm page of the app or WebUI The skylight is opened Simulate a smoky environment under the smoke...

Page 209: ...Table 6 38 FusionModule800 linkage grouping Linkage Category Default Status Function Link air conditioner fault with emergency fan off If this linkage status is set to on If all smart cooling products fail to communicate and the aisle temperature is higher than 27 C the emergency fan starts If all smart cooling products fail to provide the cooling function properly and the aisle temperature is hig...

Page 210: ...m for door closing to remind the customer to close the door manually The alarm is cleared after the door is closed NOTE After the IT cabinet door automatically opens a door open alarm is displayed on the active alarms page of the ECC800 Pro In the Linkage Group area click Link emergency ventilation with lock open Click to expand the Linkage Logic List Click in the Operation column to modify the te...

Page 211: ...ep 1 Log in to the ECC800 Pro WebUI as an administrator Step 2 Choose System Settings Linkage Control Step 3 Ensure that Enable linkage control function is Yes Step 4 On the Linkage Group tab page set Link air conditioner fault with emergency fan to on NOTE Select Link air conditioner fault with emergency fan under Linkage Group If its value is on the corresponding logic configurations under Linka...

Page 212: ...nfiguration page is displayed 2 Set Device type to ECC800 set Device name to ECC800 and click OK 3 On the query result tab page set the new signal name of AI DI_1 to Smoke and click Submit Step 6 Enable the AI DI device 1 Choose Monitoring System ECC800 Running Parameters AI DI_1 Port Settings 2 Set AI DI_1 sensor to Enable Click Submit to access the AI DI_1 setting page 3 Confirm that Smoke senso...

Page 213: ...et the new signal name of AI DI_2 to Fire and click Submit Step 6 Enable the AI DI device 1 Choose Monitoring System ECC800 Running Parameters AI DI_2 Port Settings 2 Set Fire sensor to Enable Click Submit to access the AI DI_2 setting page 3 Select Fire sensor type and set it to Normal Open or Normal Close as required 4 Click Unhide All Advanced Signals then click Power Supply Parameters Ensure t...

Page 214: ...e control module is replaced you need to add the new infrared remote control module on the ECC800 Pro WebUI Procedure Step 1 Set monitoring parameters for the infrared remote control module 1 Set the device address to 2 by setting the DIP switch on the infrared remote control module Table 6 39 describes how to set the DIP switch The DIP switch consists of toggle switches 1 5 from left to right Tog...

Page 215: ... the actual device address of the infrared remote control module during operations 3 Click Connect Test to check the connectivity between the infrared remote control module and the ECC800 Pro a If the connection succeeds click Add Device b If the connection fails check whether the device is properly connected to the ECC800 Pro whether the device and ECC800 Pro are running properly and whether the ...

Page 216: ...artup and click Submit The re authentication page is displayed Enter Login Password and click Submit 8 Check whether the smart cooling product is powered on If yes the control function is enabled If no rectify the faults and perform the operation again NOTE After you perform Learning the startup instruction on the WebUI check the indicator status If the indicator on the infrared remote control mod...

Page 217: ... End 6 8 PUE Configuration The PUE configuration mode can be set to Standard and User defined on the ECC800 Pro WebUI You can enable PUE functions and select a PUE configuration mode based on requirements NOTE If the device electrical energy cannot be collected disable the PUE function for the scenarios where the PUE calculation condition is not met for example the smart cooling product is powered...

Page 218: ...nce Data and set Device to ECC800 from the drop down list box For other searching criteria such as Performance data Statistics mode Start time and End time select the item based on requirements and click Query You can also view the PUE in the dashboard or curve on the home page End Example of PUE Calculation In this example the PUE is calculated on the basis of the start time 17 00 and end time 18...

Page 219: ...ed The functions of configuration buttons for the PUE user defined mode are described as follows Table 6 42 PUE configuration buttons No Button Description 1 Add Adds new total power consumption or IT power consumption parameters 2 Delete Deletes a parameter setting for the total power consumption or IT power consumption Procedure Step 1 Log in to the ECC800 Pro WebUI as an administrator Step 2 Ch...

Page 220: ...4 electricity energy 1QF5 electricity energy and 1QF6 electricity energy and click Confirm Figure 6 65 IT cabinet power consumption configuration 3 Under Total Power Consumption Configuration and IT Cabinet Power Consumption Configuration click the edit icon on the right to modify the multiple for calculating indicators as shown in Figure 6 66 ECC800 Data Center Controller User Manual for ECC800 P...

Page 221: ... obtains total electricity energy of branches from the power distribution devices Step 6 You can also view the PUE in the dashboard or PUE Chart on the home page End 6 8 3 Viewing PUE Procedure Step 1 Log in to the ECC800 Pro WebUI as an administrator Step 2 Choose Home Plan View to view real time PUE Figure 6 67 Viewing real time PUE Step 3 Choose Query Performance Data to view historical PUE dat...

Page 222: ...red perform the following steps to commission them 6 9 1 Setting iBOX and iBAT Parameters Procedure Step 1 Log in to the ECC800 Pro WebUI as an administrator Step 2 Choose Monitoring Power Distribution iBOX Running Parameters Step 3 Click Unhide All Advanced Signals set iBOX single battery qty Batt installation time Single battery capacity Current source and Battery string No Retain default values...

Page 223: ...BOXs and iBATs have no network parameters that is the RF_Z indicator on the iBOX is steady green and the RUN ALM indicator on the iBAT is steady red NOTE The iBAT is connected to the iBOX in RF_Z networking mode If the RF_Z indicator on the iBOX is not steady on green press and hold down the networking switch on the iBOX for 10 20 seconds to clear the original network If the RUN ALM indicator on t...

Page 224: ...peat Step 2 to add other iBATs to the iBOX network Step 4 Press the iBOX networking switch for 2 seconds When the RF_Z indicator on the iBOX turns from blinking green at super short intervals to blinking green at long intervals the networking is complete NOTE After the networking is complete if the ALM indicator on the iBOX is steady on the number of devices online is smaller than the value of iBA...

Page 225: ... mains outage occurs the backup capacity may be inconsistent with the rated capacity Procedure Step 1 Log in to the ECC800 Pro WebUI as an administrator Step 2 Choose System Settings Linkage Control Set Enable linkage control function to Yes and click Submit Step 3 Set Battery shallow discharge test to On Step 4 On the Linkage Logical List tab page click Add or the edit icon Figure 6 69 Setting pa...

Page 226: ...sition of the Smart U Space Manager If a smart U space manager is installed perform the following steps to configure it Prerequisites Connect the smart U space manager to the COM1 or COM2 port on the rack environment unit ECC800 Data Center Controller User Manual for ECC800 Pro 6 Feature Description Issue 02 2020 09 07 Copyright Huawei Technologies Co Ltd 215 ...

Page 227: ...le have been allocated Procedure Step 1 Log in to the ECC800 Pro WebUI as an administrator Step 2 Choose Home Plan View to access the Plan View page where you can create or modify the views of the smart module Drag the icon of a registered device or device in the cabinet list to the planned position to generate the plan view Step 3 Choose Monitoring Cabinet IT Cabinet n Smart U Space Manager1 chec...

Page 228: ...ce manager 1 Choose Monitoring Cabinet IT Cabinet n Smart U Space Manager 2 Select Running Control and click Blink In the actual environment you will see that the smart U space manager blinks to ensure that the device location in the view is consistent with that in the smart module Figure 6 71 Viewing the position of the smart U space manager End 6 10 2 2 Querying the U Space Use Information Prere...

Page 229: ...fault configuration to configure electricity for devices in the smart module The following scenarios support the function of applying default electricity configuration N 1 scenario The system has only one PDC and is working in single power supply mode 2N non isolation scenario The system has only one PDC and is working in dual power supply mode 2N isolation scenario The system has two PDCs and is ...

Page 230: ...ngle phase or three phase based on the actual power supply Numb er of power suppli es 2 rPDU quantity Rated cabin et power 6 00 Set based on the actual rated power of the cabinet rPDU A01 PDU80001 1QF1 L1 Select a power distribution device and power distribution branch for the rPDU numbered rPDU A01 in the cabinet rPDU B01 PDU80001 2QF1 L1 Select a power distribution device and power distribution ...

Page 231: ...or subsequent cabinets are 1QF2 L2 2QF2 L2 and the like Descending order If the branch for the first cabinet is 1QF10 L1 2QF10 L1 the branches for subsequent cabinets are 1QF9 L3 2QF9 L3 and the like Figure 6 72 Power configuration ECC800 Data Center Controller User Manual for ECC800 Pro 6 Feature Description Issue 02 2020 09 07 Copyright Huawei Technologies Co Ltd 220 ...

Page 232: ...ttery string trips if the battery pole temperature detected by the iBAT exceeds the fire protection point Then the battery string fault information is displayed in the power supply and distribution link diagram Smart rPDU high temperature disconnection Whenever the ECC800 Pro detects excessive high temperature of an rPDU branch it disconnects the entire rPDU to protect the IT devices Then the rPDU...

Page 233: ...n view the power information about the smart module 5 Choose Home Plan View In the PUE area you can view the transient mPUE NOTE Transient mPUE Total input power Total IT power of the smart module For example if a PDU8000 with the total input power of 5 kW connects to the smart module whose total IT power is 3 6 kW the transient mPUE 5 kW 3 6 kW 1 39 If the power management is not configured the P...

Page 234: ...nformation about each device in real time to quickly locate faults Figure 6 73 Power supply links diagram Table 6 45 Specifications of the power supply links diagram Item Specifications 1 Two AC inputs for IT cabinets 2 Two AC inputs for smart cooling products 3 Tap to view the IT cabinets connected in real time ECC800 Data Center Controller User Manual for ECC800 Pro 6 Feature Description Issue 0...

Page 235: ...ts in a smart module and the indoor and outdoor units of a smart cooling product can be regulated to achieve optimal energy efficiency without hotspots iCooling disabled For the cold aisle containment in the smart module all IT cabinets use the cooling capacity in the cold aisle and the temperatures inside the cold aisle are unevenly distributed due to the uneven air flow The cooling requirements ...

Page 236: ...at support the iCooling function The scenario is dual row cold aisle containment and the following conditions are met Smart cooling product should be placed face to face The smart module is configured with an integrated UPS or integrated PDU Electricity has been configured for IT cabinets network cabinets and smart cooling products The ECC800 Pro collects statistics on IT branch power information ...

Page 237: ...intelligent teamwork control mode teamwork control of smart cooling products Step 4 Choose Monitoring Cooling Running Parameters to access the Temperature and Humidity Parameters page Check whether Temperature and humidity control type is Cold aisle End 6 12 2 Viewing Cooling Capacity Usage Information Prerequisites Smart cooling products have been connected to the ECC800 Pro Procedure Step 1 Conn...

Page 238: ...ers to access the Running Parameters page Set Number of redundant smart cooling products and Local yearly highest temperature as required and tap Submit Figure 6 76 Setting running parameters Step 3 Use the pad to connect to the WiFi network of the ECC800 Pro in the room Step 4 Log in to the ECC800 Pro app as an administrator Step 5 View the cooling distribution information ECC800 Data Center Cont...

Page 239: ...mart cooling product is running Gray The smart cooling product is not running 5 Alarm status The alarm icon is displayed based on the alarm severity of the smart cooling product You can tap the smart cooling product to view the alarm 6 Temperature and humidity inside the aisle Step 6 Tap the corresponding smart cooling product to check the operating status and working mode of each component in the...

Page 240: ...Air inlet temperature of the smart cooling product 6 Refrigerant status 7 Air outlet temperature of the smart cooling product End 6 12 4 Setting the Temperature Map If the temperature map function is configured follow the instructions provided in this section to commission it Prerequisites 1 Cables to the NTC and T H sensors have been connected ECC800 Data Center Controller User Manual for ECC800 ...

Page 241: ... or COM7 port on the UIM20A expansion module Context The BOM number of T H sensors is 02311FQG or 02312PBL Procedure Step 1 Set the T H sensor device address Set the T H sensor device address through the DIP switch on the T H sensor Toggle switches 1 6 are used to set device addresses toggle switch 7 is reserved and toggle switch 8 is used to switch the temperature unit Device addresses are set in...

Page 242: ... greater than 32 two user interface modules are required A UIM20A expansion module must be placed in the first cabinet of the corresponding IT cabinets Then the remaining cabinets need to be installed in sequence The cable connection principles are the same Set the T H sensor addresses onsite based on the layout in the smart module view Step 2 Add the T H sensor 1 Log in to the ECC800 Pro WebUI as...

Page 243: ...Low humidity alarm threshold are 30 0 C 5 0 C 85 0 RH and 15 0 RH respectively End 6 13 Facial Recognition 6 13 1 Recording Facial Data Prerequisites The FusionModule app has been installed on the pad Procedure 1 You have logged in to the FusionModule app on the pad as an administrator 2 On the main screen of the app tap On the displayed Edit page select Face Account Management After reading the m...

Page 244: ...ta and import the collected facial data to other devices in offline mode for facial recognition Procedure Step 1 Collect facial data in offline mode 1 On the login screen of the app on the mobile phone or pad tap Settings and select Face Info Collection to collect facial data 2 In the Face Info Collection dialog box set Please enter nickname and Please enter encryption password for the facial data...

Page 245: ... has been recorded Opening the Access Control System Using Facial Recognition Method 1 When you open the access control system for the first time tap on the FusionModule app login screen and align the face with the green circle on the screen After facial recognition is successful log in to the app as an administrator to open the access control system at the same time NOTE After you log in to the s...

Page 246: ...with the user Tap Delete the facial data Step 4 Tap OK End 6 14 Remote Management 6 14 1 NetEco Management 6 14 1 1 Connecting a Communications Cable Procedure Step 1 Connect a communications cable to the WAN1 port on the ECC800 Pro Figure 6 83 Connecting a communications cable End 6 14 1 2 Setting NetEco Parameters When the smart module can be connected to the NetEco perform the following steps t...

Page 247: ...tep 3 Click Submit Step 4 Set NetEco communications parameters and authentication password on the ECC800 Pro WebUI Table 6 52 NetEco parameters Path Parameter Default Value Setting System Settings NMS Application NetEco Communicat ion Parameters NetEco Location Local Set this parameter based on the type of the connected NetEco management system Local NetEco Cloud CloudOpera NetEco Server IP 192 16...

Page 248: ... the NetEco Prerequisites You have logged in to the NetEco client by web browser You have created modules in Data Center Planning Context For detailed operations see iManager NetEco 6000 Device Installation and Commissioning Guide of the corresponding version Procedure 1 Choose System Configuration Data Center Planning from the main menu The Data Center Planning window is displayed 2 Click in the ...

Page 249: ...eferring to the section Accessing a Site in the CloudOpera NetEco Online Help End Follow up Procedure On the CloudOpera NetEco management system page click Site Management to view the outlet access status 6 14 1 5 Setting the Transparent Transmission Function Context Using the transparent transmission function the NMS can directly manage southbound components that are not monitored by the ECC800 P...

Page 250: ...ort is set for the first time you are prompted to set an authentication password On the Set Authentication Password tab page set Authentication password and Confirm authentication password and click Submit NOTE Enable security Authentication is set to Enable by default If so an authentication password must be set If Enable security Authentication is set to Disable there is no need to set an authen...

Page 251: ...ded and drag its icon to the management domain Step 10 Set management attributes Figure 6 86 Page for setting management attributes NOTE IP Address indicates the ECC800 Pro login IP address Port indicates the ECC800 Pro COM2 port 3212 Device Address indicates the Polymer T H sensor address Step 11 Click to save the created device view Step 12 Choose System Configuration Transmission Channel Manage...

Page 252: ...smission channels End 6 14 2 Third party NMS Management over SNMP 6 14 2 1 Connecting a Communications Cable Procedure Step 1 Connect a communications cable to the WAN1 port on the ECC800 Pro Figure 6 88 Connecting a communications cable End 6 14 2 2 Setting SNMP Management Parameters Prerequisites Before setting SNMP parameters obtain the information listed as follows from the NMS ECC800 Data Cen...

Page 253: ...he NMS server Trap port 162 Port defined by the user Context SNMPv3 parameters should be set before connecting the ECC800 Pro to the NMS These parameters are required for setting up the ECC800 Pro on the NMS SNMPv1 and SNMPv2c are insecure Therefore SNMPv3 is recommended This section uses SNMPv3 as an example Procedure Step 1 Apply to the equipment room network administrator for a fixed IP address...

Page 254: ...g the parameters click Confirm 8 Click Add under SNMP Trap 9 Set Trap target address and Trap port set SNMP version to SNMPv3 and specify SNMPv3 user name Set Trap target address to the IP address of the NMS server and set Trap port to the port defined by the user 10 After setting the parameters click Confirm 11 Click Export in the Mib File pane export the MIB file and send it to the development e...

Page 255: ...o the ECC background Cascading port Enable disable Indicates whether to use the cascading function NetEco encryption algorithm CBC Enable disable Indicates whether to use the CBC encryption algorithm when connecting to the NetEco Transparent transmission encryption algorithm CBC Enable disable Indicates whether to use the CBC encryption algorithm during transparent transmission ECC800 Data Center ...

Page 256: ...is steady on and the red indicator is faulty Check the output voltage and determine whether the PSU is faulty If the PSU is faulty replace it Fan No abnormal noise is generated If abnormal noise is generated clean the fan Operating environment Ambient temperature 20 C to 50 C Humidity 0 95 RH non condensing If the temperature or humidity is abnormal check the smart cooling product status Cable con...

Page 257: ...t damaged Replace damaged cables 7 2 Common Faults and Troubleshooting Table 7 3 Common faults and troubleshooting for PSUs Symptom Possible Cause Measure The PWR indicator green is off There is no AC input Check whether the AC input is abnormal The PSU is faulty Replace the PSU The ALM indicator yellow is steady on Over temperature protection is triggered The ambient temperature exceeds the upper...

Page 258: ...e rectify power grid faults The main control module is faulty or not securely installed Reinstall the main control module If the fault persists replace the main control module The RUN indicator green is blinking at 5 Hz The main control module does not register with the NetEco Register the main control module with the NetEco RJ45 power output indicators turn off involved ports AIDI_1 AIDI_5 COM1 C...

Page 259: ...the ECC800 Pro WebUI The ALM indicator is on An alarm whose default severity is major exists Check and clear the alarm Table 7 6 Common faults and troubleshooting for the independent deployment AI_DI unit Symptom Possible Cause Measure The PWR indicator is off The independent deployment AI_DI unit is faulty or the power to the independent deployment AI_DI unit is abnormal Check whether the board i...

Page 260: ...vice in Source Device select the reserved device in Target Device and click Submit to synchronize the configuration parameters of the failure device to the reserved device 4 On the Monitoring System ECC800 Controls tab page select Delete device with communication failure and click Submit add the reserved device to the smart module view 7 3 1 Replacing an ECC800 Pro Main Control Module Prerequisite...

Page 261: ...SB to WiFi module and antennas from the ECC800 Pro main control module Step 4 Loosen the screws on both sides of the ECC800 Pro main control module and pull the handles on both sides of the ECC800 Pro main control module to remove the main control module Figure 7 1 Removing the ECC800 Pro main control module Step 5 Optional Remove the SIM card from the corresponding slots of the ECC800 Pro main co...

Page 262: ...ctric shocks Tool insulation gloves Materials a reserved undamaged and undeformed PSU of the appropriate model Context The PSU is hot swappable Procedure Step 1 Push the locking latch in the upper right corner of the PSU panel leftwards Step 2 Pull out the handle of the PSU to remove the PSU from the subrack Step 3 Gently push the reserved PSU into the subrack along guide rails and push the lockin...

Page 263: ...to the ECC800 Pro End 7 3 4 Replacing a SIM Card Prerequisites Tools ESD wrist strap ESD gloves Materials A spare SIM card of the same model are available and functional Procedure Step 1 Record the position of the signal cable connected to the ECC800 Pro main control module panel and then disconnect the signal cable Step 2 Loosen the screws on both sides of the ECC800 Pro main control module Step ...

Page 264: ...ing a SIM card Step 6 Install the ECC800 Pro main control module in the card slot Step 7 Tighten the screws on both sides of the ECC800 Pro main control module Step 8 Reconnect signal cables to the ECC800 Pro main control module panel based on the recorded information End ECC800 Data Center Controller User Manual for ECC800 Pro 7 Maintenance Issue 02 2020 09 07 Copyright Huawei Technologies Co Ltd...

Page 265: ...r the user name and password to log in to the ECC800 Pro home page Step 2 Download the upgrade package ECC800V100R003C00SPC110 zip from the Huawei enterprise or carrier website After the decompression choose Maintenance System Upgrade on the ECC800 Pro WebUI click Select File and select the decompressed file package ECC800V100R003C00SPC110 tar gz to upload NOTE This section uses ECC800 V100R003C00...

Page 266: ... be configured After the software package is installed all functions are available End 8 1 3 How Can I Set the Date and Time Procedure Step 1 Choose System Settings System Parameters Time Step 2 Set the time zone date and time or click Obtain local time Then click Submit Step 3 Optional If the NTP server is used for time synchronization select NTP server sync set NTP primary server IP NTP backup s...

Page 267: ...ion page enter the login user name and password and click Submit Step 2 Choose System Settings System Parameters Site Configuration modify Smart module name and click Submit in the Site ID area End 8 1 5 How Can I Manage WebUI Users Context WebUI users are classified as Administrator and Operator They have different operation rights Administrator The user name is admin and password is Changeme by ...

Page 268: ...Choose the user to be modified and click Modify Reset the login password on the displayed page Figure 8 2 Changing the login password 4 Modify Advance expiration notification days and Timeout Interval for the password 5 Select password retrieval modes ECC800 Data Center Controller User Manual for ECC800 Pro 8 FAQ Issue 02 2020 09 07 Copyright Huawei Technologies Co Ltd 257 ...

Page 269: ...ation notification days and Timeout Interval select appropriate values from the Access right and Login source drop down list boxes and click Confirm NOTE On the user management page you can modify delete lock and unlock a user The value of Advance expiration notification days must not be greater than the value of Password validity period You can choose the password retrieval mode as required eithe...

Page 270: ... that you obtain or draw the planned layout of the smart modular data center before the creation Procedure Step 1 Choose Home Plan View and click Create smart module in Smart Module View The Modify Basic Config dialog box is displayed Set the layout and device quantity in Layout and Half size cabinet qty row based on the actual smart module scenario ECC800 Data Center Controller User Manual for EC...

Page 271: ...e icons on the editing page If you are unable to determine the positions of wireless communications devices such as the access actuator general input unit and power distribution unit use the following methods to identify them Press the BLINK button on a device for less than 1s to report the blinking status to the ECC800 Pro The corresponding device icon in the WebUI plan view blinks Drag a device ...

Page 272: ...perform the following steps 1 Choose Home Plan View 2 Click Modify Device in Smart Module View The Devices is displayed 3 Drag registered devices for example the camera to the appropriate positions in the layout diagram and click Exit Edit Mode The smart module plan view is updated 4 When editing the smart module view click Zoom In or Restore to adjust the size of the view 8 1 7 How Can I Set and ...

Page 273: ...to the main menu screen NOTE After setting parameters for the integrated UPS the ECC800 Pro discovers the access from the integrated UPS automatically End 8 1 7 2 How Can I Set and Add a UPS2000G A Modbus RTU Prerequisites One end of the straight through cable has been connected to the COM_1 or COM_2 port on the Modbus expansion card of the UPS2000G A and the other end has been connected to the CO...

Page 274: ...ting a device address Devic e Addre ss Toggl e Switc h 1 Toggl e Switc h 2 Toggl e Switc h 3 Toggl e Switc h 4 Toggl e Switc h 5 Toggl e Switc h 6 Toggl e Switc h 7 Toggl e Switc h 8 1 OFF ON ON ON ON ON ON ON 2 ON OFF ON ON ON ON ON ON 3 OFF OFF ON ON ON ON ON ON 4 ON ON OFF ON ON ON ON ON Step 2 Add a UPS2000G A 1 Log in to the ECC800 Pro WebUI as an administrator 2 Add a UPS2000G A Table 8 3 Ad...

Page 275: ...d ECC800 Pro are running properly and whether the parameter settings are consistent with the UPS2000G parameters NOTE The section describes how to add a UPS2000G A in a single UPS scenario In a parallel UPS scenario if the common communications address of the Modbus card is added to the ECC800 Pro all UPS2000G As can be connected to the ECC800 Pro End 8 1 7 3 How Can I Set and Add a UPS2000G_L Mod...

Page 276: ...lly click Confirm The connected devices are displayed in the Number of connected devices list If the connection fails check whether the device is properly connected to the ECC800 Pro whether the device and ECC800 Pro are running properly and whether the parameter settings are consistent with the device parameters End 8 1 7 4 How Can I Set and Add a UPS5000 Modbus RTU Prerequisites One end of the s...

Page 277: ...vices are displayed Device attribute Select UPS from the drop down list box Device Type Select UPS5000 from the drop down list box Connect To Select ETH Converter n from the drop down list box Communicati ons Port Select COM1 COM2 from the drop down list box Device Address In this example Device Address is set to 1 During actual configuration set the device address for the UPS5000 E based on the a...

Page 278: ...000 monitoring parameters 1 Enter the UPS5000 home screen tap System Info 2 Choose System Info Settings enter the user name admin and password 000001 and tap 3 Tap Comm Settings and choose IP Settings Set IP address allocation to Automatic DHCP on the displayed communication settings screen and the UPS5000 is discovered by ECC800 Pro automatically and is connected to the ECC800 Pro NOTE On the Mod...

Page 279: ...he ECC800 Pro NOTE On the Communication screen set SSL to Enable If the PDU is a modular precision PDU set modbusTCPcertification to Disable on the Communication screen End 8 1 7 7 How Can I Set and Add a Transformer Modbus RTU Prerequisites One end of the RS485 cable has been connected to ports 19 and 20 on the transformer temperature controller and the other end has been connected to the COM por...

Page 280: ...To Select ECC800 from the drop down list box Communicati ons Port Select COM1 from the drop down list box Device Address In this example Device Address is set to 1 During actual configuration set the device address for the transformer based on the actual situation 3 Click Test Connect to check whether the transformer is properly connected to the ECC800 Pro If the connection succeeds click Confirm ...

Page 281: ...tion settings screen set ID to 1 and Baud to 9600 NOTE ID is the communication address ranging from 1 to 255 This operation uses 1 as an example Figure 8 10 Setting SVG parameters Step 2 Add an SVG 1 Log in to the ECC800 Pro WebUI as an administrator 2 Add an SVG Table 8 7 Adding an SVG Path Parameter Setting Choose System Settings Device Management Device attribute Select PDU from the drop down l...

Page 282: ...s been connected to terminals 1 and 2 on the air conditioner electric control box and the other end has been connected to the COM AIDI port on the ECC800 Pro collector or UIM20A Optional One end of the straight through cable has been connected to terminals 7 and 8 on the air conditioner electric control box and the other end has been connected to the COM AIDI port on the ECC800 Pro collector or UI...

Page 283: ...Pro If the Envicool CRU is connected to another port enter the number of the connected port Device Address In this example Device Address is set to 1 During actual configuration set the device address for the air conditioner based on the actual situation Table 8 9 Adding an Envicool IFX Termina device Path Parameter Setting Choose System Settings Device Management and click Add Device Device Attri...

Page 284: ...operly connected to the ECC800 Pro whether the device and the ECC800 Pro are running properly and whether the parameter settings are consistent with the device parameters End 8 1 7 10 How Can I Set and Add a TP48202B Modbus RTU Prerequisites One end of the straight through cable has been connected to the RS485 RS232 port on the power distribution monitoring unit in the DC PDC and the other end has...

Page 285: ...list If the connection is abnormal check whether the device is properly connected to the ECC800 Pro whether the device and the ECC800 Pro are running properly and whether the parameter settings are consistent with the device parameters End 8 1 7 11 How Can I Set and Add a SmartLi Modbus TCP Prerequisites One end of the straight through cable has been connected to the FE port on the SmartLi and the...

Page 286: ...mit CAUTION Remotely opening the door may open the smart module door and this may pose security risks Exercise caution when performing this operation Remotely opening the skylight may open the smart module skylight and this may pose security risks Exercise caution when performing this operation End 8 1 7 13 How Can I Set and Add a PDU8000 Modbus RTU Prerequisites One end of the straight through ca...

Page 287: ...12 Adding a PDU8000 Path Parameter Setting Choose System Settings Device Management and click Add Device The parameters for adding devices are displayed Device attribute Select PDU from the drop down list box Device Type Select PDU8000 from the drop down list box Connect To Select ECC800 from the drop down list box Communicati ons Port Select COM1 from the drop down list box NOTE The setting examp...

Page 288: ...e running properly and whether the parameter settings are consistent with the PDU8000 parameters End 8 1 7 14 How Can I Set and Add a 5G DC Power Supply Modbus RTU Prerequisites One end of the straight through cable has been connected to the RS485 port on the SMU02C in the MTS9604B N20B1 cabinet and the other end has been connected to the COM port on the ECC800 Pro collector or ETH converter Proce...

Page 289: ...evice address based on the actual situation 3 Click Test Connect to check whether the 5G DC power supply is properly connected to the ECC800 Pro If the connection succeeds click Confirm The connected devices are displayed in the Number of connected devices list If the connection fails check whether the 5G DC power supply is properly connected to the ECC800 Pro whether the 5G DC power supply and EC...

Page 290: ...he PDU2000 M C monitoring parameters NOTE The display of a single phase module is used as an example After the PDU2000 M C is powered on the LCM displays the initialization screen Figure 8 13 PDU2000 M C initialization screen Press MENU to enter the device communications address screen Figure 8 14 PDU2000 M C communications settings Set address to 1 by pressing DOWN and UP ECC800 Data Center Contr...

Page 291: ...gure 8 15 PDU2000 M H communications settings Press DOWN and UP to select the address to be set Press MENU to confirm the settings NOTE If modification is successful is displayed If modification fails is displayed Step 2 Add a PDU2000 1 Log in to the ECC800 Pro WebUI as an administrator 2 Add a PDU2000 Table 8 15 Adding a PDU2000 Path Parameter Setting Choose System Settings Device Management and ...

Page 292: ...er the PDU2000 is properly connected to the ECC800 Pro whether the PDU2000 and ECC800 Pro are running properly and whether the parameter settings are consistent with the PDU2000 parameters End 8 1 7 16 How Can I Set and Add an ATS Prerequisites One end of the straight through cable has been connected to the COM port on the ATS and the other end has been connected to the COM port on the ECC800 Pro ...

Page 293: ...onnect to check whether the ATS connects to the ECC800 Pro properly If the ATS connects to the ECC800 Pro successfully click Confirm The connected devices are displayed in the Number of connected devices list If the connection fails check whether the ATS is properly connected to the ECC800 Pro whether the ATS and ECC800 Pro are running properly and whether the parameter settings are consistent wit...

Page 294: ...rom the drop down list box Device Type Select PMAC615 from the drop down list box Connect To Select ECC800 from the drop down list box Communicati ons Port Select COM3 from the drop down list box NOTE The setting example indicates that the PMAC615 is connected to the COM3 port on the ECC800 Pro If the PMAC615 is connected to another port enter the number of the connected port Device Address In thi...

Page 295: ... only the BLINK function of the ETH converter can be used to identify the mapping between the PMAC625 and ETH converter Procedure Step 1 Set the PMAC625 communications address 1 Press on the displayed screen after the PMAC625 is started Press after entering the programming mode Modify the password 1 by default in blinking ones digit by pressing or and press to confirm the setting Figure 8 17 Progr...

Page 296: ...0 During actual configuration set the device address for the PMAC625 based on the actual situation 3 Click Test Connect to check whether the PMAC625 connects to the ECC800 Pro properly If the PMAC625 connects to the ECC800 Pro successfully click Confirm The connected devices are displayed in the Number of connected devices list If the connection fails check whether the PMAC625 is properly connecte...

Page 297: ...art button at the rear of the monitoring screen Then the parameters take effect NOTE The communications address is 1 by default Step 2 Add a PDC DC meter 1 Log in to the ECC800 Pro WebUI as an administrator 2 Add a PDC DC meter Table 8 19 Adding a PDC DC meter Path Parameter Setting Choose System Settings Device Management and click Add Device The parameters for adding devices are displayed Device...

Page 298: ...th the PDC DC meter parameters End 8 1 7 20 How Can I Set and Add a UPS Input and Output PDC Electricity Meter PD7777 Electricity Meter Prerequisites The pins 4 and 5 of one end of the straight through cable has been connected to terminals A and B at the bottom of the PD7777 meter and the other end has been connected to the COM port on the ECC800 Pro or ETH converter NOTE Terminal A is RS485 and t...

Page 299: ...ation 3 Click Test Connect to check whether the PD7777 electricity meter is properly connected to the ECC800 Pro If the PD7777 electricity meter connects to the ECC800 Pro successfully click Confirm The connected devices are displayed in the Number of connected devices list If the connection fails check whether the device is properly connected to the ECC800 Pro whether the device and ECC800 Pro ar...

Page 300: ...rt cooling product model and connection sequence The displayed value prevails 3 On the Running Parameters tab page set running parameters 4 On the Controls tab page set the smart cooling product control parameters such as on off control parameters CAUTION After the smart cooling product is shut down the temperature of the smart module increases and data running is affected Exercise caution when pe...

Page 301: ...ng product control parameters such as on off control parameters CAUTION After the smart cooling product is shut down the temperature of the smart module increases and data running is affected Exercise caution when performing this operation End 8 1 7 23 How Can I Set and Add a NetCol5000 C 030 032 NetCol5000 C 065 080 Parameters over Modbus TCP Prerequisites One end of the straight through cable ha...

Page 302: ...g parameters 4 On the Controls tab page set the smart cooling product control parameters such as on off control parameters CAUTION After the smart cooling product is shut down the temperature of the smart module increases and data running is affected Exercise caution when performing this operation End 8 1 7 24 How Can I Set and Add a NetCol5000 C030 Modbus RTU Prerequisites One end of the straight...

Page 303: ...ring actual configuration set the device address for the NetCol5000 C030 based on the actual situation 3 Click Test Connect to check whether the NetCol5000 C030 connects to the ECC800 Pro properly If the NetCol5000 C030 connects to the ECC800 Pro successfully click Confirm The connected devices are displayed in the Number of connected devices list If the connection fails check whether the NetCol50...

Page 304: ...ffline the ECC800 Pro will report a disconnection alarm on its WebUI NOTE In the LAN scenario the IP devices and the ECC800 Pro must be in the same network Following is a procedure example about how to add five IP devices with the online detection timeout interval being 29 seconds Procedure Step 1 Log in to the ECC800 Pro WebUI as an administrator Step 2 Choose Monitoring System ECC800 Running Par...

Page 305: ...of the straight through cable has been connected to the COM_IN port on the independent deployment AI_DI unit and the other end has been connected to the COM port on the ECC800 Pro collector or ETH converter Procedure Step 1 Set monitoring parameters for the independent deployment AI_DI unit Set the address of the independent deployment AI_DI unit to 1 or 2 by setting its DIP switch The DIP switch ...

Page 306: ... box Communica tions Port Select COM3 from the drop down list box NOTE The setting example indicates that the independent deployment AI_DI unit is connected to the COM3 port on the ECC800 Pro If the independent deployment AI_DI unit is connected to another port set the COM port to the ECC800 Pro port connected to the independent deployment AI_DI unit Device Address In this example Device Address i...

Page 307: ...the Running Parameters tab page set UIM20A expansion module running parameters 4 On the Controls tab page set the UIM20A expansion module control parameters End 8 1 7 28 How Can I Set and Add a Multi functional Sensor If a multi functional sensor is installed perform the following steps to configure it Prerequisites One end of the straight through cable has been connected to the PoE port on the mu...

Page 308: ...al sensor Smoke dispersing method Send clean air to the smoke compartment through the hole in the side of the multi functional sensor CAUTION Do not generate open flame and ensure that smoke does not damage any device When testing the smoke detection function of the multi functional sensor do not start the smart cooling product or fan because the air from the smart cooling product or fan will inte...

Page 309: ...ork cable Short circuit core wires 1 and 8 on the other end of the network cable and connect the network cable to the cable delivered with the smoke sensor The following table describes the cable connection Table 8 25 Smoke sensor cable connection Wire of the Network Cable Smoke Sensor Cable Core wire 1 orange white core wire 8 brown GND black Core wire 3 green white 12 V red Core wire 6 green Nor...

Page 310: ...ke sensor is connected to the AI DI_2 port on the ECC800 Pro 1 Log in to the ECC800 Pro WebUI as an administrator 2 Choose System Settings Signal Name Modify The Batch Signal Configuration page is displayed 3 Set Device type to ECC800 set Device name to ECC800 and click OK 4 On the query result tab page set the new signal name of AI DI_2 to Smoke and click Submit 5 Choose Monitoring System ECC800 ...

Page 311: ...ing a network cable To connect the cable for the smoke sensor perform the following steps Short circuit core wires 1 and 8 on the other end of the network cable and connect the network cable to the cable delivered with the smoke sensor The following table describes the cable connection Table 8 27 Smoke sensor cable connection Wire of the Network Cable Smoke Sensor Cable Core wire 1 orange white co...

Page 312: ...ronment under the smoke sensor DI1_smoke alarm is displayed on the active alarm page of the app or WebUI Press the reset button on the smoke sensor to clear the alarm End 8 1 7 31 How Can I Set and Add the Smoke Sensor Connected to the AI DI Port on the Rack Environment Unit If a smoke sensor is installed perform the following steps to configure it Prerequisites One end of the network cable has be...

Page 313: ...UI If Smoke sensor type is Smoke Sensor power off and reset the smoke sensor to clear the alarm End 8 1 7 32 How Can I Set and Add the Smoke Sensor Connected to the AI DI Port on the UIM20A expansion module If a smoke sensor is installed perform the following steps to configure it Prerequisites One end of the network cable has been stripped core wires 1 5 and 8 have been short circuited core wires...

Page 314: ... If a water sensor is installed perform the following steps to configure it Prerequisites One end of the straight through cable has been connected to the RJ45 port on the WLDS900 water sensor and the other end has been connected to the AI DI port on the ECC800 Pro Context To use the AI DI sensor enable the corresponding AI DI port and name the sensor The specific alarm then can be reported If the ...

Page 315: ...atus Alarm Clearance Method Immerse the water detection cable in water Leak DI alarm is generated on the active alarm screen of the app or on the WebUI Wipe dry the water detection cable The alarm disappears automatically End 8 1 7 34 How Can I Set and Add a WLDS600 Water Sensor If a water sensor is installed perform the following steps to configure it Prerequisites One end of the straight through...

Page 316: ... the water sensor based on the actual situation Step 4 Click Test Connect to check whether the water sensor connects to the ECC800 Pro properly If the water sensor connects to the ECC800 Pro successfully click Confirm The connected devices are displayed in the Number of connected devices list If the connection fails check whether the water sensor is properly connected to the ECC800 Pro whether the...

Page 317: ...e other end of the network cable has been connected to the AI DI port on the rack environment unit Context To use the AI DI sensor enable the corresponding AI DI port and name the sensor The specific alarm then can be reported If the sensor is prefabricated only check its settings The actual value prevails Only the method of the parameter settings is described Procedure Step 1 Set water sensor par...

Page 318: ... Connected to the AI DI Port on the ECC800 Pro If a temperature sensor is installed perform the following steps to configure it Prerequisites One end of the straight through cable has been connected to the RJ45 port on the temperature sensor and the other end has been connected to the AI DI port on the ECC800 Pro Context If the sensor is prefabricated only check its settings The actual value preva...

Page 319: ...temperature sensor on the WebUI You can view the current cabinet temperature End 8 1 7 37 How Can I Set and Add the Temperature Sensor Connected to the NTC Port on the Rack Environment Unit If a temperature sensor is installed perform the following steps to configure it Prerequisites One end of the straight through cable has been connected to the RJ45 port on the temperature sensor and the other e...

Page 320: ...3 NTC sensor Procedure Step 1 The NTC port on the T H sensor connected to the temperature sensor supports automatic identification Therefore you do not need to set parameters Step 2 Add the T H sensor 1 Log in to the ECC800 Pro WebUI as an administrator 2 Add the T H sensor Choose System Settings Device Management and click Auto Discover Device to add the T H sensor The device connection informati...

Page 321: ...the ECC800 Pro or the UIM20A expansion module Context This section describes how to set and add a T H sensor by using the COM port on the ECC800 Pro as an example Procedure Step 1 Set the T H sensor device address Set the T H sensor device address through the DIP switch on the T H sensor Toggle switches 1 to 6 of the DIP switch specify the device address in binary mode ON indicates 1 and OFF indic...

Page 322: ...ration set the device address for the T H sensor based on the actual situation 3 Click Test Connect to check whether the T H sensor connects to the ECC800 Pro properly If the T H sensor connects to the ECC800 Pro successfully click Confirm The connected devices are displayed in the Number of connected devices list If the connection fails check whether the T H sensor is properly connected to the EC...

Page 323: ...or is installed perform the following steps to configure it Prerequisites One end of the straight through cable has been connected to the RS485_IN port on the T H sensor and the other end has been connected to the COM port on the ECC800 Pro or the UIM20A expansion module Context This section describes how to set and add a T H sensor by using the COM port on the ECC800 Pro as an example Procedure S...

Page 324: ...to the COM3 port on the ECC800 Pro If the T H sensor is connected to another port enter the number of the connected port Device Address In this example Device Address is set to 1 During actual configuration set the device address for the T H sensor based on the actual situation 3 Click Test Connect to check whether the T H sensor connects to the ECC800 Pro properly If the T H sensor connects to th...

Page 325: ...nsor BOM Number 02311FQG 02312PBL Prerequisites One end of the straight through cable has been connected to the RS485_IN port on the T H sensor and the other end has been connected to the COM port on the ECC800 Pro or the UIM20A expansion module Context This section describes how to set and add a T H sensor by using the COM port on the ECC800 Pro as an example Procedure Step 1 Set the T H sensor d...

Page 326: ...the T H sensor is connected to another port enter the number of the connected port Device Address In this example Device Address is set to 1 During actual configuration set the device address for the T H sensor based on the actual situation 3 Click Test Connect to check whether the T H sensor connects to the ECC800 Pro properly If the T H sensor connects to the ECC800 Pro successfully click Confir...

Page 327: ...alues of High temperature alarm threshold Low temperature alarm threshold High humidity alarm threshold Low humidity alarm threshold NTC1 6 high temperature alarm threshold and NTC1 6 low temperature alarm threshold are 30 0 C 5 0 C 85 0 RH 15 0 RH 45 C and 10 C respectively End 8 1 8 How Can I Restore Factory Settings Context NOTICE Restoring factory settings will restore parameters to their defa...

Page 328: ... security certificate key 6 Select the network security certificate key to be imported from the PC and click Upload 7 Optional If the network security certificate is encrypted select If an encrypted private key is imported enter the password for decryption and specify Key cryptography and Confirm key cryptography 8 Click Submit in the Network Security Certificate area End 8 1 10 How Can I Install ...

Page 329: ... default gateway information planned for the ECC800 Pro Procedure Step 1 Log in to the ECC800 Pro WebUI as an administrator Step 2 Choose System Settings System Parameters Monitor IP and change the IP subnet mask and default gateway information for the ECC800 Pro as planned Step 3 Click Submit Step 4 In the displayed Setting succeeded Log in again dialog box click OK End 8 1 12 How Can I Configure...

Page 330: ...p 5 Enter the Alarm Linkage page Select Device Type for ECC800 select Device Type or Device for Linkage Type and click Confirm Step 6 Optional If you select Device for Linkage type select ECC800 for Device name Step 7 Click Select in the Output Dry Contact column corresponding to Operation log full as required select Yes or No for DO and click OK Step 8 Click Select in the Loudspeaker column corre...

Page 331: ...e alarm information Step 5 Select an alarm to be cleared and click Clear Alarm NOTE The cleared alarm is displayed in the historical alarm list End 8 1 15 How Can I View Performance Data Procedure Step 1 Log in to the ECC800 Pro WebUI as an administrator Step 2 Choose Query Performance Data Step 3 Set Device Performance Data Statistics Mode Start time and End Time and click Query NOTE The query re...

Page 332: ...s changed the original name in the alarm collection and settings is changed accordingly End 8 1 17 How Can I Export Historical Data and Device Data Context Export Historical Data You can export historical alarms active alarms performance data operation logs and access events of the system for viewing and analyzing events Export Device Data You can export device data in system If Encryption Passwor...

Page 333: ...for ECC800 Pro_1 to a PC If ECC800 Pro_2 needs the same parameter configurations import the configuration file to ECC800 Pro_2 NOTICE ECC800 Pro_2 and ECC800 Pro_1 must have the same type and number of connected devices Configuration files cannot be imported or exported for the monitoring module IP parameters smart module certificate NetEco certificate NetEco second challenge password time configu...

Page 334: ...le 5 Select the configuration file to be imported and click Upload End 8 1 19 How Can I Export Fault Information Procedure Step 1 Log in to the ECC800 Pro WebUI as an administrator Step 2 Choose Maintenance Fault Information Step 3 Optional Select Encryption password and enter an encryption password NOTICE If Encryption Password is selected the exported data package will be encrypted and you need ...

Page 335: ...ment Procedure Step 1 Log in to the ECC800 Pro WebUI as an administrator Step 2 Choose Maintenance Parameter Sync Step 3 Select a value from the Device type drop down list box Step 4 Specify source device and target device click Submit NOTICE If communication between the ECC800 Pro and the device is interrupted during parameter synchronization the synchronization fails Ensure that the ECC800 Pro a...

Page 336: ...ter the user name and password and tap NOTE The preset user name is admin and the preset password is 000001 Step 3 Choose Settings Advanced and set Modbus TCP encryption to Disable End 8 1 23 What Should I Do if I Forget the ECC800 IP Address Procedure Step 1 If the ECC800 has been connected to the NMS you can query the IP address on the NMS Step 2 If the ECC800 is not connected to the NMS hold do...

Page 337: ... the Synchronization Status of the device becomes Synchronized close the Synchronize Access Permission page 3 Scan the fingerprint on the access control device again Step 3 If the message indicating unauthorized fingerprint is still displayed after you perform Step 1 and Step 2 you need to record the user s fingerprint again 1 Choose System Settings Access Management 2 Select the involved user and...

Page 338: ... ECC800 Pro WebUI Modbus TCP Prerequisites The device supports DHCP Context Figure 8 29 Network diagram Procedure Step 1 Ensure that the device communication mode has been set to DHCP Step 2 Log in to the ECC800 Pro WebUI as an administrator and check whether the device exists on the Monitoring page If the device exists and communication status is normal the device has accessed the ECC800 Pro succ...

Page 339: ...n the ECC800 Pro WebUI and drag the device to the corresponding position in the Smart Module View pane based on the actual device layout 8 1 27 How Can I Add the Devices Accessed Through a Smart ETH Gateway to the ECC800 Pro WebUI Modbus MAC Context The device that supports Modbus MAC can be automatically identified by the ECC800 Pro Figure 8 31 Network diagram ECC800 Data Center Controller User M...

Page 340: ...re 8 32 Device accessed the ECC800 Pro If the device does not exist check that the cable is properly connected between the device and the ECC800 Pro and that the device and ECC800 Pro are operating properly End Follow up Procedure Choose Home Plan View on the ECC800 Pro WebUI and drag the device to the corresponding position in the Smart Module View pane based on the actual device layout ECC800 Da...

Page 341: ...rate This section uses 9600 as an example Set this parameter based on site requirements NOTE For certain devices this parameter does not need to be set Communications address This section uses 1 as an example Set this parameter based on site requirements Step 2 Add the device to the ECC800 Pro WebUI 1 Log in to the ECC800 Pro WebUI as an administrator 2 Add the device ECC800 Data Center Controller...

Page 342: ...endent deployment AI_DI unit connects to the ECC800 Pro successfully click Confirm The connected devices are displayed in the Number of connected devices list If the connection fails check whether the device is properly connected to the ECC800 Pro whether the device and ECC800 Pro are running properly and whether the parameter settings are consistent with the device parameters 4 Choose Monitoring ...

Page 343: ... site requirements Step 2 Add the device to the ECC800 Pro WebUI 1 Log in to the ECC800 Pro WebUI as an administrator 2 Add the device Table 8 49 Parameter description for adding a device Path Parameter Setting Choose System Settings Device Management and click Add Device The parameters for adding Device attribute Select the device attribute to be accessed from the drop down list box Device Type S...

Page 344: ... connected devices are displayed in the Number of connected devices list If the connection fails check whether the device is properly connected to the ECC800 Pro whether the device and ECC800 Pro are running properly and whether the parameter settings are consistent with the device parameters End Follow up Procedure Choose Home Plan View on the ECC800 Pro WebUI and drag the device to the correspon...

Page 345: ...t Settings NOTE The setting example indicates that the device connects to the AI DI_3 port on the ECC800 Pro If the device connects to another port enter the number of the connected port AI DI_3 sensor Select Enable and click Submit AI DI_3 sensor type Select the type of the device to be accessed from the drop down list box NOTE Devices except the normally open devices normally closed devices door...

Page 346: ... This section uses the device such as a T H sensor rPDU cabinet electronic lock and U bit manager connecting to the COM1 port on the UIM20A expansion module as an example Procedure Step 1 Set communications parameters on the device Table 8 51 Description of communications parameters to be set on a device Parameter Recommended Value Baud rate This section uses 9600 as an example Set this parameter ...

Page 347: ..._3 port on the UIM20A expansion module as an example Context Each UIM20A expansion module supports a maximum of eight dry contact devices In the scenario with multiple UIMs in the same smart module a maximum of 48 dry contact devices can be connected Procedure Step 1 Log in to the ECC800 Pro WebUI as an administrator Step 2 Add the device Table 8 52 Parameter description for adding a device Path P...

Page 348: ...r setting all mandatory parameters click Submit End Follow up Procedure Choose Home Plan View on the ECC800 Pro WebUI and drag the dry contact device to the corresponding position in the Smart Module View pane based on the actual device layout 8 1 33 How Can I Open Doors Remotely over the ECC800 Pro WebUI Context If O M personnel need to enter a smart module but do not take an access cord or forge...

Page 349: ...en the aisle door controlled by access actuator 1 Figure 8 37 Opening a door remotely 8 1 34 How Can I Turn On or Off Aisle Lights in the Smart Module over the ECC800 Pro WebUI Context If O M personnel forget to turn off lights when exiting the data center you can remotely turn off the lights over the ECC800 Pro WebUI When the local light button is faulty or lights cannot be turned on through a li...

Page 350: ...how to turn on or off the lights controlled by AC actuator 2 Figure 8 38 Turning on or off aisle lights Follow up Procedure Set Set light mode to Automatic CAUTION When a smart module actuator is configured you need to set parameters for the smart module actuator The setting process is similar 8 1 35 How Can I Open Skylights Remotely over the ECC800 Pro WebUI Context You can open skylights over th...

Page 351: ...xercise caution when performing this operation When a smart module actuator is configured you need to set parameters for the smart module actuator The setting process is similar End Example The following figure shows how to open the skylights controlled by skylight actuator 1 Figure 8 39 Opening skylights Follow up Procedure After the maintenance is complete O M personnel need to close the skyligh...

Page 352: ...t On Off control select ON or OFF as required and click Submit End Example The following figure shows how to turn on or off the NetCol5000 A025 Figure 8 40 Turning on or off smart cooling products 8 1 37 How Can I Open the Cabinet Electronic Lock over the ECC800 Pro WebUI Context When O M personnel need to open a cabinet for maintenance you can open the cabinet electronic lock over the ECC800 Pro ...

Page 353: ...mplete O M personnel need to close the cabinet door manually 8 1 38 How Can I Link the Smoke Alarm with the Alarm Beacon over the ECC800 Pro WebUI Prerequisites The alarm beacon is connected to the DO port on the ECC800 Pro Context After the smoke alarm is linked with the alarm beacon if smoke is detected inside the smart module the alarm beacon connecting to the corresponding DO port will generat...

Page 354: ...inked with the alarm beacon if smoke is detected inside the smart module the alarm beacon connecting to the corresponding DO port will generate an audible and visual alarm This section describes how to set an alarm linkage by linking output dry contact of the smoke DI alarm on the AI DI_1 sensor to the DO port Procedure Step 1 Choose System Settings Alarm Parameter Alarm Linkage Step 2 Select ECC8...

Page 355: ...y the device name Table 8 58 Modifying a device name Path Setting Monitoring System Smart ETH Gateway Group Smart ETH Gateway 1 Running Parameters Select Device name enter the new name in the text box as planned and click Submit End Example Figure 8 42 Modifying a device name 8 2 APP Operations 8 2 1 How Can I Connect to a WiFi Network Procedure Step 1 Connecting to a WiFi network Insert a WiFi mo...

Page 356: ... using any of the following three methods Log in to Huawei AppGallery https a vmall com search for FusionModule and tap Download a Optional Set the pad language to Chinese b Open the browser on the pad enter www baidu com in the address box search for Huawei AppGallery select Ordinary Download and tap Save c Install the Huawei AppGallery If the downloaded file exists in the drop down list box tap ...

Page 357: ...iFi function If you enable the WiFi function on the WebUI there is no preset password After the WiFi function is enabled the password for a mobile phone to connect to the WiFi network is Changeme When you log in to the app using a tablet the system prompts you to change the password After you disable the WiFi hotspot function on the WebUI and press the button again the WiFi function is still enabl...

Page 358: ...on of the monitoring system is disabled by default Before connecting the mobile phone app to the monitoring system enable the WiFi function on the WebUI For security you are advised to disable the WiFi function when the app is not in use A password that has been used for a long time is more likely to be stolen or cracked The risk increases along with the time of use Change the password once three ...

Page 359: ...Log in to the ECC800 Pro mobile phone or pad app as an administrator Step 2 To view the smart module data center layout tap Home Step 3 To view active alarms and historical alarms choose Alarms Active Alarms or Alarms Historical Alarms Step 4 Choose More to view network parameters operation logs asset details and version information End 8 2 5 How Can I Export and Import Data Procedure Step 1 Log i...

Page 360: ...in the Decryption Password text box 4 Select a configuration file and tap Import NOTE The ECC800 Pro will restart after you import the configuration file End 8 2 6 How Can I Synchronize Device Parameters Context After a device is replaced you can synchronize the parameters of the original device to the new device Procedure Step 1 Log in to the ECC800 Pro mobile phone or pad app as an administrator...

Page 361: ...nnects to the ECC800 Pro over WiFi properly 2 Use the obtained user name and password to log in to the app and exit 3 Use the user name and password that previously failed the login to log in to the app again Step 2 If you have not obtained the user name and password used in a previous successful login perform the following operations 1 Close the app and wait 4 5 minutes 2 Use the user name and pa...

Page 362: ...s AI DI alarm signals Constant Register A register can combine multiple levels of logic programs Operators AND The output is valid if both inputs are valid OR The output is valid if either input is valid NOT The output is the inverse value of the input signal or constant The output is active if the input is greater than the constant The output is active if the input is less than the constant DELAY...

Page 363: ...urations 9 2 Linkage Control Configuration Examples Context NOTICE Linkage control does not need to be configured onsite and its default configuration applies Before adding or modifying linkage control linkage logic consult Huawei engineers When you do not know how to rectify the incorrect linkage control configuration or want to synchronize the linkage control configuration from another ECC800 Pr...

Page 364: ...nkage Logic List tab page click Add or the edit icon 3 Click Submit Set Linkage Logic List parameters for Link fire control with skylight open Figure 9 1 Setting parameters for Linkage Logic List Set Linkage Logic List parameters for Link high temperature with skylight open NOTE When adding high temperature linkage control ensure that all smart cooling products fail to communicate with the ECC800 ...

Page 365: ...xport function to export the linkage control linkage rules configured for an ECC800 Pro to a local PC and then import the rules to another ECC800 Pro This function achieves quick configuration for the linkage control ECC800 Data Center Controller User Manual for ECC800 Pro 9 PLC Function Issue 02 2020 09 07 Copyright Huawei Technologies Co Ltd 354 ...

Page 366: ...d C COM component object model D DC direct current DES Data Encryption Standard DI digital input DO digital output E ECC Energy Control Center ESN equipment serial number ETH Ethernet F FE Fast Ethernet ECC800 Data Center Controller User Manual for ECC800 Pro 10 Acronyms and Abbreviations Issue 02 2020 09 07 Copyright Huawei Technologies Co Ltd 355 ...

Page 367: ... Control MD5 message digest algorithm Mib Mib N NAT network address translation NetEco iManager NetEco data center infrastructure management system NTC negative temperature coefficient P PDU power distribution unit POE power over Ethernet PSU power supply unit PUE power usage effectiveness R RF radio frequency RH relative humidity ECC800 Data Center Controller User Manual for ECC800 Pro 10 Acronym...

Page 368: ...tocol SNMP Simple Network Management Protocol SSL Secure Sockets Layer SSID service set identifier T TLS Transport Layer Security U UPS uninterruptible power system USB universal serial bus V VCN video cloud node W WiFi wireless fidelity WPS WiFi protected setup ECC800 Data Center Controller User Manual for ECC800 Pro 10 Acronyms and Abbreviations Issue 02 2020 09 07 Copyright Huawei Technologies ...

Reviews: