
GS-2724 User’s Guide
111
C
H A P T E R
12
Bandwidth Control
This chapter shows you how you can cap the maximum bandwidth using the
Bandwidth
Control
screen.
12.1 Bandwidth Control Overview
Bandwidth control means defining a maximum allowable bandwidth for incoming and/or out-
going traffic flows on a port.
12.1.1 CIR and PIR
The Committed Information Rate (CIR) is the guaranteed bandwidth for the incoming traffic
flow on a port. The Peak Information Rate (PIR) is the maximum bandwidth allowed for the
incoming traffic flow on a port when there is no network congestion.
The CIR and PIR should be set for all ports that use the same uplink bandwidth
.
If the CIR is
reached, packets are sent at the rate up to the PIR. When network congestion occurs, packets
through the ingress port exceeding the CIR will be marked for drop.
"
The CIR should be less than the PIR. The sum of CIRs cannot be greater than
or equal to the uplink bandwidth.
12.2 Bandwidth Control Setup
Click
Advanced Application
>
Bandwidth Control
in the navigation panel to bring up the
screen as shown next.
Содержание GS-2724
Страница 1: ...www zyxel com GS 2724 Ethernet Switch User s Guide Version 3 70 4 2007 Edition 1 ...
Страница 2: ......
Страница 7: ...Safety Warnings GS 2724 User s Guide 7 ...
Страница 8: ...Safety Warnings GS 2724 User s Guide 8 ...
Страница 22: ...Table of Contents GS 2724 User s Guide 22 ...
Страница 30: ...List of Tables GS 2724 User s Guide 30 ...
Страница 32: ...32 ...
Страница 36: ...Chapter 1 Getting to Know Your Switch GS 2724 User s Guide 36 ...
Страница 40: ...Chapter 2 Hardware Installation and Connection GS 2724 User s Guide 40 ...
Страница 46: ...Chapter 3 Hardware Overview GS 2724 User s Guide 46 ...
Страница 48: ...48 ...
Страница 58: ...Chapter 4 The Web Configurator GS 2724 User s Guide 58 ...
Страница 64: ...Chapter 5 Initial Setup Example GS 2724 User s Guide 64 ...
Страница 70: ...Chapter 6 System Status and Port Statistics GS 2724 User s Guide 70 ...
Страница 84: ...84 ...
Страница 94: ...Chapter 8 VLAN GS 2724 User s Guide 94 Figure 36 Port Based VLAN Setup All connected ...
Страница 126: ...Chapter 16 Port Authentication GS 2724 User s Guide 126 ...
Страница 130: ...Chapter 17 Port Security GS 2724 User s Guide 130 ...
Страница 136: ...Chapter 18 Classifier GS 2724 User s Guide 136 Figure 58 Classifier Example ...
Страница 139: ...Chapter 19 Policy Rule GS 2724 User s Guide 139 Figure 59 Policy ...
Страница 145: ...Chapter 20 Queuing Method GS 2724 User s Guide 145 ...
Страница 146: ...Chapter 20 Queuing Method GS 2724 User s Guide 146 ...
Страница 152: ...Chapter 21 VLAN Stacking GS 2724 User s Guide 152 ...
Страница 165: ...165 PART IV IP Application Static Route 167 RIP 169 IGMP 171 Differentiated Services 173 DHCP 177 ...
Страница 166: ...166 ...
Страница 183: ...Chapter 27 DHCP GS 2724 User s Guide 183 Figure 89 DHCP Relay Configuration Example ...
Страница 184: ...Chapter 27 DHCP GS 2724 User s Guide 184 ...
Страница 186: ...186 ...
Страница 210: ...Chapter 31 Syslog GS 2724 User s Guide 210 ...
Страница 224: ...Chapter 36 Routing Table GS 2724 User s Guide 224 ...
Страница 228: ...228 ...
Страница 262: ...Chapter 38 Introducing Commands GS 2724 User s Guide 262 ...
Страница 296: ...Chapter 42 IEEE 802 1Q Tagged VLAN Commands GS 2724 User s Guide 296 ...
Страница 300: ...Chapter 44 Routing Domain Command Examples GS 2724 User s Guide 300 ...
Страница 304: ...304 ...
Страница 312: ...Appendix B Changing a Fuse GS 2724 User s Guide 312 ...
Страница 332: ...Appendix E Common Services GS 2724 User s Guide 332 ...
Страница 336: ...Appendix F Legal Information GS 2724 User s Guide 336 ...
Страница 348: ...Index GS 2724 User s Guide 348 ...