ZURN Z-874 Скачать руководство пользователя страница 1

Z-874

ZURN INDUSTRIES, INC., FLO-THRU DIV., 2640 South Work Street, Falconer, NY 14701

Phone: 716/665-1132, Fax: 716/665-1135, World Wide Web: www.zurn.com

In Canada: ZURN INDUSTRIES LIMITED, 3544 Nashua Drive, Mississauga, Ontario L4V1L2, Phone: 905\405-8272 Fax: 905\405-1292

Form #

   FT754

  Date:

  04/29/04

   C.N. No.

   90884      

Rev.

Содержание Z-874

Страница 1: ... Work Street Falconer NY 14701 Phone 716 665 1132 Fax 716 665 1135 World Wide Web www zurn com In Canada ZURN INDUSTRIES LIMITED 3544 Nashua Drive Mississauga Ontario L4V1L2 Phone 905 405 8272 Fax 905 405 1292 Form FT754 Date 04 29 04 C N No 90884 Rev ...

Страница 2: ...ch drain components typical to an installation Double check your order to ensure that you have all components particular to your job before be ginning your installation Contact Zurn Flo Thru at 716 665 1132 should additional material be required ...

Страница 3: ...FRAME CONFIGURATION ...

Страница 4: ...r 34 1 2 inches depending on which system is being installed Soft and or shifting soil subtrates may cause cracking of the concrete and consequent movement of the trench It is critical that the concrete be poured on an adequate foundation 25 inches 356mm minimum f Z 874 12 34 1 2 inces 508mm minimum f Z 874 21 ...

Страница 5: ... Rebar clips are used on both sides of the length of each trench drain for easy attach ment to 4 rebar stakes Simply attach the Rebar Clip to the anchor straps and align the rebar stakes where needed then drive the stakes into the ground for positive anchoring Attach the trench drain to the rebar stakes with the hardware provided Adjust the trench to the desired elevation and continue with adjacen...

Страница 6: ...THE CHANNEL An alternative means of installation is to suspend the trench drain as shown Wooden braces to hang the trench run can be attached to the drain body though the grate lock down bars as illustrated above ...

Страница 7: ...edding brackets in the place of the re bar stakes The excavation shall be dug 2 deeper to allow the slurry pour needed to lock the bedding brackets into place to hold the system from floating Once this is complete the concrete shall be placed as in the standard installation ...

Отзывы: