ZXSDR BS8908 G060 User Manual
power supply does not have a lightning protection higher than level B, then an
indoor DC lightning protection box ILP48-3 must be configured in the equipment
room.
2.
When indirect AC power supply is used, the AC lightning protection box should
be configured.
l
Indoor installation: When the power cable is laid outdoors, lightning protection should
be performed for the power supply according to the outdoor condition.
Grounding Check
BS8908 adopts the joint grounding mode, and the grounding resistance is 5 Ω at most.
Other Checks
1.
The auxiliary equipments or components must satisfy the project design requirement
of BS8908.
2.
The transmission equipments connecting the interconnecting equipments such as the
baseband unit are available.
5.2.2 Personnel
The installation supervisor is responsible for training and managing installation personnel
and ensuring the installation quality. The installation personnel perform the installation.
Requirements on the installation supervisor:
l
Being aware of the importance of quality.
l
Having participated in relevant training held by ZTE Corporation and being qualified
for installation supervision.
l
Being familiar with material, tools, and operations involved in the installation.
l
Being familiar with the installation flow and the installation method.
l
Following the principle of safety being the most important, organizing appropriate
personnel to implement the installation, and ensuring that the installation is completed
successfully.
Requirements on installation personnel
l
Having participated in relevant training held by ZTE Corporation and being qualified
for installation operations.
l
Being healthy and having not drunk.
l
Strictly following the usage specification of tools and instruments, and wearing safety
belt.
l
Keeping tools and instruments well to prevent them from falling.
l
Not wearing loose clothes and slippery shoes.
5.2.3 Tools and Instruments Preparation
Prepare installation tools and testing instruments listed in
, and use them
according to actual requirements.
5-6
SJ-20101104174421-001|20110425(R1.1)
ZTE Proprietary and Confidential