![Zte ZXSDR BS8802 C100 Скачать руководство пользователя страница 42](http://html1.mh-extra.com/html/zte/zxsdr-bs8802-c100/zxsdr-bs8802-c100_user-manual_941917042.webp)
ZXSDR BS8802 C100 User Guide
6.2 Installation Preparation
Before the installation, check the environment and ensure that related installation tools,
instruments, and documentation are available.
1.
Tool, instrument, and documentation
Tool
Adjustable wrenches, inner-hexagon spanner, straight screwdriver, cross
screwdriver, pliers (sharp-nose pliers, diagonal pliers, and vices), tape measure,
antistatic wrist strap, and electric percussion drill
Instrument
Gradienter, goniometer, and multimeter
Documenta-
tion
ZXSDR BS8802 C100 User Guide
2.
Environment check
Environment requirement
Indoor installation
Working temperature: –20
℃
~+45
℃
Relative humidity: 5% ~95%
Power requirement
Local power supply: 85 V AC to 264 V AC
Facility requirement
Vertical wall, level ceiling, vertical pole
6.3 Chassis Installation
ZXSDR BS8802 C100 is compact in structure and occupies small footprint. Therefore,
it can be flexibly installed in various indoor places.
In actual application, the most
commonly used installation modes are wall-mounted installation, pole installation, and
ceiling installation.
6.3.1 Pole-Mounting a ZXSDR BS8802 C100
Context
The diameter of the pole used to install a ZXSDR BS8802 C100 must range from 20 mm
to 110 mm.
Prerequisites
The operator is responsible for providing and installing poles while ZTE corporation
supplies relevant components and parts for pole-mounted installation only.
6-6
SJ-20110329145303-001|2011–10–25 (R1.1)
ZTE Proprietary and Confidential
Содержание ZXSDR BS8802 C100
Страница 6: ...II ...
Страница 8: ...II ...
Страница 66: ...Tables This page intentionally left blank ...