ZXG10 iBSC Hardware Installation Guide
11.3.5 Power-off Procedures
Steps
1.
Turn off -48V power switch on plug-in-box filter at back.
2.
Turn off two -48V power switches on power plug-in-box panel at the top of rack.
3.
Turn off the -48V power supply output to the cabinet on the DC power distribution
cabinet.
– End of Steps –
11-8
SJ-20110531095035-004|2011-10-28 (R2.0)
ZTE Proprietary and Confidential
Содержание ZXG10 iBSC
Страница 8: ...II ...
Страница 167: ...Figures Figure 11 7 Step 3 of Board Unplugging 11 5 V ...
Страница 168: ...Figures This page intentionally left blank ...