ZXG10 iBSC Hardware Installation Guide
Caution!
Cable clamp shall be fixed on Nylon fastener tape.
3.
Aggregate the optical fibers from each layers of shelf into cable trough, optical fiber
spacing is about 200mm, bundled using a Nylon fastener tape. From the cabling at
both sides of cabinet, it is fixed on binding wire beam on the cabinet using cable clamp.
4.
Optical fiber is routed from outlet of cabinet at both sides to the shelf top, to winding
coil.
5.
The optical fiber across cabinet shall be protected by corrugated pipe. Eight optical
fibers can be mounted in each corrugated pipe.
Caution!
No bobbin is designed within the cabinet, all fibers shall be winded to the top of winding
coil.
10.2.6 Checking Outdoor Cabling
Cabling racks are required for cabling outdoor cables. All the cables should be bound
with the cabling racks securely. When the power cables and signal cables are routed
parallel, they must not be bound together. Enough space is necessary. Water-proof and
anti-sunburn measures are required. The cable through-holes should be sealed.
10.3 Checking Accessories
Accessories inspection contains:
l
Checking Alarm Box;
l
Checking Sensor;
l
Checking Maintenance Terminal;
l
Checking Other Items.
10.3.1 Checking Alarm Box
The alarm box shall be installed in a conspicuous location, so that the alarm can be seen
or heard easily. It shall be installed at a proper height for the convenience of the operation.
The power cables and network cables connected to the alarm box shall be laid in the
cable trough without exposure. The alarm boxes must be firmly installed. When multiple
alarm boxes are installed side by side, eye-catching labels (indicating what equipment the
corresponding alarm boxes belong to) must be pasted to differentiate the alarm boxes.
10-6
SJ-20110531095035-004|2011-10-28 (R2.0)
ZTE Proprietary and Confidential
Содержание ZXG10 iBSC
Страница 8: ...II ...
Страница 167: ...Figures Figure 11 7 Step 3 of Board Unplugging 11 5 V ...
Страница 168: ...Figures This page intentionally left blank ...