
26 / 152
Swell nail description
①Press down the center cylinder with 4# inner hexagon or other tools, you can hear a sound or the center cylinder moves
axially by 2mm;
②Pry open the gap with a blade, nail or carving knife, etc. and remove it; if space permits, you can reach it Push out from the
back;
③Pinch the outer ring with two fingers, and push the center cylinder up to the initial position;
④Pinch the center cylinder with two fingers to install the swell nails to the installation position;
⑤The outer ring is attached to the connected parts; if not attached Check whether it is misaligned;
⑥Press the center cylinder with your fingers or other tools, and you can hear a sound or the top of the center cylinder is almost
flush with the top surface of the outer ring, indicating that the assembly is in place.
Содержание ZT350T-D
Страница 1: ...1 152 ZT350T D Maintenance Manual 2022 11 24...
Страница 50: ...50 152 D350 Braking system component diagram...
Страница 88: ...88 152 Electrical schematic diagram of EFI system...
Страница 124: ...124 152 Exploded view of front fork components Directional exploded view...
Страница 125: ...125 152 Front fork exploded view...
Страница 126: ...126 152 Exploded view of lower link board...