178
/
218
Charging system layout diagram
1-Charging port (PKE) 2-Main fuse (25A) 3-Battery 4-Magnetic motor 5-Rectifier
Electrical schematic diagram
Letter
G
R
Y
Chinese green
Red
yellow
English
Green
Red
Yellow
Battery disassembly
1. Disassembly
Refer to the steps “a” to “d” in the section "Removing the
stepper motor and cleaning the carbon deposit" in the
section "Throttle valve body" in the "Maintenance" chapter
of this manual to remove the battery.
Caution:
●The whole vehicle must be powered off before
disassembling the battery.
●The negative pole must be removed first, and the
n the
positive pole. The opposite is true when installing.
●The positive and negative electrode protective caps must
be covered when reinstalling.
●After removing the battery, reset the meter time and reset
the EFI system.
Содержание ZT125-M 2022
Страница 1: ...1 218 ZT125 310 350T M Maintenance Manual 2022 11 25...
Страница 111: ...111 218 l So far the adjustment operation of the valve clearance is completed...
Страница 138: ...138 218 Electrical schematic diagram of EFI system...
Страница 182: ...182 218 Exploded view of front fork components M125 310 Directional exploded view...
Страница 183: ...183 218 M350 Directional exploded view...
Страница 184: ...184 218 Front fork exploded view M125 310 The M125 are similar to the M310 taking the M310 as an example...
Страница 185: ...185 218 M350...
Страница 186: ...186 218 Exploded view of lower link board M125 310 The M125 are similar to the M310 taking the M310 as an example...
Страница 187: ...187 218 M350...
Страница 198: ...198 218 difference is that the M350 has one less adjusting nut and one more step to remove the connecting plate...