background image

QLS – Q

UICK

 S

TART

 

GUIDE

Zoeller Pump Prefabricated Lift Station

FOLLOW ALL SAFETY GUIDELINES

Step #1

 

Confirm all components are included and there is no shipping damage. If you are 

missing components or assume there is damage, please contact the distributor 

where  the  lift  station  was  purchased.  Familiarize  yourself  with  the  instruction 

manuals for each component (pump, controls, basin, etc.) prior to installation. 

Place SYSTEM ID STICKER inside the door of the control panel for future reference. 

Step #2

Confirm that the proper electrical power (for both PUMPS and CONTROLS) has 

been  provided  to  the  jobsite  by  a  licensed  electrician.  All  wiring  and  conduit 

must meet the NEC, local, and regional codes. For a single phase system, it is 

recommended that separate incoming power sources be brought to the “pump” and the 115 volt “alarm & control” 

circuits.  On a three phase system, the circuits are isolated with a multi-tap transformer, therefore only one power 

source need be brought to the panel.

Step #3

Properly excavate the pit being careful not to disturb any underground utilities or existing structure. Pit should be 

a minimum 24” larger than the basin diameter.  Make sure to adhere to all local/national building and safety codes. 

Basin install requires the use of a compacted sub-base or concrete pad.  

•    DO NOT DROP, IMPACT, OR ROLL BASIN

•    DO NOT WRAP CABLE OR CHAIN AROUND BASIN

Step #4

Measure, cut and align all inlet, electrical and discharge piping. Properly test fit and glue all discharge, inlet hubs 

and electrical conduit couplings. Inspect ALL connections on the exterior of the basin. Use a hole saw one inch 

larger than the pipe seal size to drill into the side of the basin at the correct elevation to properly install the pipe seal 

hub assembly (follow the directions on your hub, if the inlet fitting provided is not a pipe seal).

 

Step #5

Backfill pit surrounding the basin with appropriate gravel (minimum 12” from basin wall). Basin should be filled 

with water prior to pouring a concrete anchor around anti-floatation device. Backfill and subbase should be 1/8”-

3/4” pea gravel or 1/8”- 3/4” crushed stone. See drawing (SK 2280) on next page.

Step #6

 

Backfill grade with gravel and fill dirt or to specifying engineer’s design. See basin drawing (SK 2280) on next page.

These guidelines and installations are to ensure that damage or premature failure to the system does not occur. The QWIK Start Guide is NOT 
designed to be a replacement for all installation instructions. Safe and proper installation procedures shall be the responsibility of the installer. 
For any questions, contact Zoeller’s Product Support Department at 1(800)928-7867 ext. #6 OR [email protected].

FM3058

SYSTEM ID STICKER SAMPLE

Отзывы: