background image

TO AVOID SERIOUS OR FATAL PERSONAL INJURY OR MAJOR 

PROPERTY DAMAGE, READ AND FOLLOW ALL SAFETY      

INSTRUCTIONS IN MANUAL AND ON PUMP.
THIS MANUAL IS INTENDED TO ASSIST IN THE INSTALLATION 

AND OPERATION OF THIS UNIT AND MUST BE KEPT WITH 

THE PUMP.

This is a 

SAFETY ALERT SYMBOL.

When you see this symbol on the pump or in 

the manual, look for one of the following signal 

words and be alert to the potential for personal 

injury or property damage.

Warns of hazards that 

WILL

 cause serious 

personal    injury, death or major property 

damage.
Warns of hazards that 

CAN

 cause serious 

personal injury, death or major property damage.
Warns of hazards that 

CAN

 cause personal injury 

or property damage.
Indicates special instructions which are very 

important and must be followed.

THOROUGHLY REVIEW ALL INSTRUCTIONS AND WARNINGS 

PRIOR TO PERFORMING ANY WORK ON THIS PUMP.
MAINTAIN ALL SAFETY DECALS.

Product information presented 

here reflects conditions at time 

of  publication. Consult factory 

regarding discrepancies or 

inconsistencies.

MAIL TO

:  P.O. BOX 16347 • Louisville, KY  40256-0347

SHIP TO

:  3649 Cane Run Road  • Louisville, KY  40211-1961

TEL

: (502) 778-2731 • 1 (800) 928-PUMP • 

FAX

: (502) 774-3624

Visit our website:

zoellerpumps.com

© Copyright 2021. All rights reserved.

CL0016

0221

Supersedes

0919

Multi-Stage Turbine Effluent Pumps

OWNER'S MANUAL

  Congratulations on the purchase of the Zoeller Pump Company   

Turbine Effluent Submersible Pump.  High quality workmanship 

and easy maintenance design has been incorporated into this 

line of onsite wastewater products. This  Zoeller Pump Company 

product will provide years of trouble-free service when installed 

according to the manufacturers recommendations.

  This manual incorporates the installation, operation, maintenance, 

and service instructions into one document to aid the owner of a Zoeller 

Pump Company  onsite wastewater product. Please read and review this 

manual before installing the product. The instructions contained herein, 

when followed correctly, will not only ensure a long and problem-free 

life for the system, but will also save time and money during installation. 

Should further assistance be necessary please call 1-800-928-7867.

Owner’s Information

Model Number: ______________________  Date Code:  

_________________

Job Name: 

______________________________________________________ 

Dealer:  

_________________________________________________________

Date of Purchase: 

_______________________________________________

Contractor: _____________________________________________________

Date of Installation:  

_______________________________________________

System Readings During Operation:  Voltage __________ Amps 

_________

Safety Instructions ....................................................................................................1

Limited Warranty .......................................................................................................2

Preinstallation Information ......................................................................................2

Pump Performance Data ...................................................................................... 3-4

Electrical Data ...........................................................................................................5

Major Components  ...................................................................................................5

Pump Installation and Wiring Diagram ..................................................................6

System Wiring Instructions .....................................................................................6

Typical Installations  .................................................................................................7

Start-up, Maintenance, Troubleshooting and Service Checklist  .....................8

Table of Contents

Safety Instructions

CAUTION

023422

Register your 

Zoeller Pump Product 

on our website:

http://reg.zoellerpumpcompany.com/

Содержание 5030 Series

Страница 1: ...nship and easy maintenance design has been incorporated into this line of onsite wastewater products This Zoeller Pump Company product will provide years of trouble free service when installed according to the manufacturers recommendations This manual incorporates the installation operation maintenance andserviceinstructionsintoonedocumenttoaidtheownerofaZoeller PumpCompany onsitewastewaterproduct...

Страница 2: ... can be insulated or the check valve can be removed If the check valve is removed the on off cycle must be adjusted for any back flow from the discharge line 13 Prop65 Warming for California residents Cancer and reproductive harm www P65Warnings ca gov Limited Warranty Manufacturerwarrants tothepurchaserandsubsequentownerduring the warranty period every new product to be free from defects in mater...

Страница 3: ...9 84 200 61 9 2 34 8 16 5 62 5 240 73 2 11 3 42 8 20 5 77 6 3 4 HP 1 HP 9 STAGE 7 STAGE 5 STAGE 5030 SERIES TOTAL DYNAMIC HEAD FLOW PER MINUTE EFFLUENT MODEL Feet Shut off Head Meters 1 2 HP 241 ft 73 6m Liters Gal 401 ft 122 2m Liters Gal 120 36 6 80 24 4 11 6 43 9 13 1 49 6 13 0 49 2 14 1 53 4 40 12 2 14 5 54 9 26 9 36 3 7 6 240 160 200 48 8 73 2 61 2 0 9 6 7 1 44 7 40 1 35 2 9 3 11 8 10 6 280 8...

Страница 4: ... FEET 1 2 HP 1 STAGE 3 4 HP 2 STAGE 1 HP 3 STAGE 1 5 HP 4 STAGE 2 HP 5 STAGE 3 HP 7 STAGE 5035 PUMP SERIES TOTAL DYNAMIC HEAD FLOW PER MINUTE EFFLUENT MODEL Feet Shut off Head Meters Gal Liters 25 50 75 100 30 5 22 9 15 2 7 6 78 3 93 4 108 3 119 4 296 4 353 6 410 0 452 0 181 7 ft 55 4m 44 3 25 7 61 4 175 125 150 53 3 38 1 45 7 97 3 232 4 167 7 6 STAGE 3 HP 2 HP 122 ft 37 2m 4 STAGE 113 0 Gal 427 7...

Страница 5: ...should be 1 1 4 diameter for the 11 GPM to 27 GPM pump series and 2 diameter for the 35 85 GPM pump series Generalpipingfromthepumptoasplitter distributionbox drainfield etc shouldbethesamediameterasstatedabove Forlongpiperuns consult friction loss tables for correct pipe sizing 4 Check Valve A check valve is required in all duplex systems It is also required when a large amount of effluent can ba...

Страница 6: ...odes 8 Runtheappropriatepowertothecontrolpanelfromafused circuit breaker disconnect The appropriate power supply information may be found on the pump nameplate 9 To provide a suitable ground a separate ground wire green or bare at least as large as the line conductors is required It is connected from the electrical disconnect box to the control panel to the junction box and to the green ground wir...

Страница 7: ...INSTALLATIONS REQUIRE A FILTER BEFORE THE PUMP SK2220 SK2219 SEPTIC TANK ZOELLER EFFLUENT TURBINE PUMP WARNING ELECTRICAL SHOCK HAZARD WARNING ZOELLER EFFLUENT TURBINE PUMP SEPTIC TANK NOTE Flow must be directed around the motor for cooling on 2 HP and higher units ...

Страница 8: ...fied electrician take voltage and current measurements on the black wire of single phase Record these readings in the space provided in the Owner s Information section on the front this manual for future reference Be sure to complete all items such as installing the lid on the riser securely closing the control panel and checking the system operation before placing the system into service Routine ...

Отзывы: