Installation
Installation Requirements
2.1
1)
It is recommended that the swing barrier must be installed on a horizontal solid platform with a
height of 50mm to 100mm.
2)
It is also recommended that the swing barrier turnstile should not be used in the corrosive
environment.
3)
Make sure the ground wire of the system is reliably connected to avoid personal injuries or
other accidents.
4)
After installation, check if the connection is done correctly at the connecting points of the
ground wire, at the connector assemblies and wiring points of the circuits, as well as at each
movable part of the swing barrier turnstile. Any loose nuts, screws and other fasteners should
be tightened in time to avoid any failures caused by long-time operations.
Installation Position
2.2
The installation position of the swing barrier turnstile depends on its size. A distance of 100mm
between the swing barrier turnstile and the wall needs to be reserved for ease of opening the top
cover of the machine to perform maintenance and adjustment. The reference figure is shown
below:
Figure 2-1 The SBTL9000 Series Dual-lane