background image

BGM1000 Series Barrier Gate (APP Version)                                                                                                                        User Manual 

P a g e

 | 19 

        Copyright©2023 ZKTECO CO., LTD.  All rights reserved. 

 

Parameter Settings Description 

8.2

Ites 

Description 

Default 

01EXXX 

Display Mode 

 

01E000: 

Displays current position of the swing arm

 

 

01E001: 

Controls input signal

 

 

01E002: 

Test mode (the digital LED displays "---" in the test 

mode)

 

01E102

: Opening position  

01E202

: Closing position  

01E502

: Opening 

01E602

: Closing 

01E702

: In the pause 

 

01E003: 

Number of boom openings 

 

01E004: 

Version Information

 

01E000 

02EXXX 

Boom Arm Opening Speed 

Set  the  Boom Arm  Opening Speed to open the gate. The larger 

the number is set, the faster the speed. The Boom Arm Opening 

Speed value can be set between 10 to 32 and the default value is 

24. 

02E024 

03EXXX 

Boom Arm Opening Brake Stroke 

The larger the number, the longer the deceleration time and the 

more stable the boom  arm operation. The Boom  Arm  Opening 
Brake Stroke can be set between 0 to 100 and the default value is 

30. 

03E030 

04EXXX 

Boom Arm Opening Brake Speed  

The smaller the number, the more pronounced the deceleration 

effect. The Boom Arm Opening Brake Speed can be set between 5 

to 100 and the default value is 10.

 

04E010 

Содержание BGM1000 Series

Страница 1: ...ad the instructions carefully before operation Follow these instructions to ensure that the product is functioning properly The images shown in this manual are for illustrative purposes only For furth...

Страница 2: ...f the said equipment It is an essential pre requisite for the satisfactory operation and maintenance that the operating and maintenance personnel are fully familiar with the design and that the said p...

Страница 3: ...letters notes etc for better operation and safety of the machine unit equipment The said additions or amendments are meant for improvement better operations of the machine unit equipment and such amen...

Страница 4: ...ndent research and development of biometric verification procedures and the productization of biometric verification SDK which was initially widely applied in PC security and identity authentication f...

Страница 5: ...onvention Description Button or key names for devices For example press OK Window names menu items data table and field names are inside square brackets For example pop up the New User window Multi le...

Страница 6: ...D 12 7 1 CONNECTION WITH LPR CAMERA 12 7 2 CONNECTION WITH UHF CONTROLLER 13 7 3 CONNECTION WITH LOOP DETECTOR 13 7 4 CONNECTION WITH VR10 RADAR SENSOR 14 7 5 CONNECTION WITH INFRARED PHOTOCELL DETECT...

Страница 7: ...P a g e 6 Copyright 2023 ZKTECO CO LTD All rights reserved DIRECTION INTERCHANGE OF THE BOOM ARM 27 9 3 SPRING ADJUSTMENT 28 9 4 10 PRODUCT PACKING LIST 28 11 TROUBLESHOOTING 29 12 SAFETY PRECAUTIONS...

Страница 8: ...ures and Functionalities The operating speed is 1 5s and the speed can be adjusted according to different boom arm lengths Reversible left and right directions The transmission mechanism is simple com...

Страница 9: ...rating Speed 1 5s 2 5s 5s 2 5s 2 5s Boom Arm Length 3m 4 5m 6m 4 5m 4 5m Boom Arm Type Straight boom Telescopic boom Straight boom with LED Folding boom Chassis Dimension W L H 350 300 1020 mm Motor T...

Страница 10: ...the boom arm but it cannot be increased After the boom arm has been cut it is important to set the spring balance again to achieve a new balance The bottom of the spring contains two plastic nuts desi...

Страница 11: ...arrier is powered on to run the test process be sure to install the barrier boom arm of the corresponding length for the test If the barrier boom arm is not installed please adjust and remove the spri...

Страница 12: ...6 Left and Right Directions 7 Mainboard Wiring Instructions 1 Please disconnect the power supply before wiring 2 To Please note that to change the input voltage you must set the DIP switch to 110V as...

Страница 13: ...ier Gate APP Version User Manual P a g e 12 Copyright 2023 ZKTECO CO LTD All rights reserved Wire Connection of the New Mainboard 7 1 Wiring diagram of new control board of the app version Connection...

Страница 14: ...13 Copyright 2023 ZKTECO CO LTD All rights reserved Connection with UHF Controller 7 3 Note The Reader1 and 2 of Inbio260 Controller corresponds to LOCK1 Reader3 and 4 corresponds to LOCK2 Connection...

Страница 15: ...CO LTD All rights reserved Coil Circumference Coil Number 3m Based on requirements ensure that the inductance is between 100 H and 200 H 3m to 6m 5 to 6 turns 6m to 10m 4 to 5 turns 10m to 25m 3 turns...

Страница 16: ...Series Barrier Gate APP Version User Manual P a g e 15 Copyright 2023 ZKTECO CO LTD All rights reserved Connection with Infrared Photocell Detector 7 6 Anti smash function Anti smash and Auto close f...

Страница 17: ...he ZKbarrier APP It Supports both Android and iOS systems Operation details are as follows 1 Open the ZKBarrier APP click Wi Fi Connection and then enter the connection page 2 You can choose either Ma...

Страница 18: ...n User Manual P a g e 17 Copyright 2023 ZKTECO CO LTD All rights reserved 3 After successful connection you can implement some functions and parameter settings on the APP according to the actual insta...

Страница 19: ...first power on you must use the Open and Close buttons on the mainboard to complete the self check process and learn the description of the menu Mainboard Parameter Settings 8 1 Menu Save Menu option...

Страница 20: ...Information 01E000 02EXXX Boom Arm Opening Speed Set the Boom Arm Opening Speed to open the gate The larger the number is set the faster the speed The Boom Arm Opening Speed value can be set between 1...

Страница 21: ...he bounce sensitivity of the boom arm when it encounters an obstacle The higher the value the lower the sensitivity the longer it will take to bounce When set to 100 this function will be turned off a...

Страница 22: ...ch pass in turn 12E000 13EXXX Core Component Position 13E000 Right 13E001 Left 13E001 14EXXX Reset 14E000 Normal 14E001 Reset Select 14E001 will restore the default factory setting Note The function d...

Страница 23: ...the valid value is 0 to 251 17E000 18EXXX Core Component Type 18E000 20A to 0 6S 18E001 18B to 1 2S 18E002 18B to 2 5S Please set the parameters according to the core component 18E002 19EXXX Boom Arm...

Страница 24: ...ht breathing 22E000 23EXXX Open Close LED State 23E000 The red light flashes during the whole process of opening and closing the boom arm 23E001 The red light is always on during the whole process of...

Страница 25: ...exit the menu 8 4 2 Unpairing Long press Menu save then press Stop flip down to 15EXXX Press to set the parameter value and then set the parameter value to 15E200 Press Menu save to save the setting...

Страница 26: ...factory Please do not adjust them without the guidance of professionals to avoid mechanical damage 1 Adjust the horizontal position of the boom arm The connecting boom crank will be an overlapping str...

Страница 27: ...e connecting boom arm crank is in an unfolded shape and the connecting boom arm s two rotation points and the reducer s output shaft are in an unfolded 3 point line This is the boom arm s vertical pos...

Страница 28: ...the power Remove the spring spring hanging arm and boom 2 Change the direction of the Spindle Connecting Arm and linkage Arm 3 Turn the Limited Block to the other direction 4 After the mechanical ope...

Страница 29: ...ly Note 1 When the barrier boom is at 45 it is the best balance 2 The spring wire diameter is adapted to different boom lengths 3m boom with 4 5mm 4 5m boom with 5 5mm 6m boom with 6 5mm If the boom i...

Страница 30: ...Tighten the wiring Description The power indicator is on the landing boom indicator is normal and the motor is not running Cause 1 The motor wiring might be wrongly connected or the wiring is loose 2...

Страница 31: ...the power immediately Note If the product works abnormally please contact the dealer in time Please do not try to repair it by yourself If you handle it without authorization the company is not respo...

Страница 32: ...ZKTeco Industrial Park No 32 Industrial Road Tangxia Town Dongguan China Phone 86 769 82109991 Fax 86 755 89602394 www zkteco com Copyright 2023 ZKTECO CO LTD All Rights Reserved...

Отзывы:

Похожие инструкции для BGM1000 Series