BG1000 Series Barrier Gate
User Manual
P a g e
| 25
Copyright©2020 ZKTECO CO., LTD. All rights reserved.
Direction Interchange of the Barrier Boom
9.3
For example, when L is changed to R, the operation steps are as follows:
Step 1: With the barrier boom is in a vertical state, turn off the power, and then
remove the spring, as shown in the figure.
Step 2: Use a socket wrench to remove the linkage arm. Unscrew the screws at both the
ends, loosen the linkage arm (washer behind the screws must be safe), as shown in the
figure:
Step 3: Remove the spring connecting arm (washer behind the screw must be safe), as
shown in the figure: