
Chapter 2: Installation
ZP1-X3E Series Installation Manual
19
Connecting the batteries
The control panel requires two 12 V, 7.2 or 12 Ah rechargeable, sealed, lead-
acid batteries.
Batteries must be installed in series, at the base of the control panel cabinet. Use
the battery lead and bridge provided and connect batteries to the BATT
connector on the control panel PCB, as shown below. Polarity must be observed.
Note:
If the control panel indicates a Supply Fault, then the batteries may need
to be replaced. See “Battery maintenance” on page 79.
Figure 10: Connecting the batteries
Caution:
Risk of equipment damage. No other equipment may be connected to
the BATT connector.
Содержание ZP1-X3E Series
Страница 1: ...ZP1 X3E Series Installation Manual P N 501 419503 1 20 ISS 20JUL21...
Страница 86: ...Chapter 4 Maintenance 80 ZP1 X3E Series Installation Manual...
Страница 106: ...Appendix A Configuration presets 100 ZP1 X3E Series Installation Manual...
Страница 110: ...Appendix B Regulatory information 104 ZP1 X3E Series Installation Manual...
Страница 113: ......
Страница 114: ......