5.2

Version without connection cables

ECblue BASIC connection version example

1

Cover of controller housing

2

Motor size 

G

: Cable glands 3 x M20

inserted: 1 x Black seal insert for cables with 8...12 mm outer diameter
inserted: 2 x Blue seal insert for cables with 6...7.9 mm outer diameter
optional: 2 x Black seal insert for cables with 8...12 mm outer diameter
optional: 1 x Blue seal insert for cables with 6...7.9 mm outer diameter
optional: 1x Seal insert with 2 boreholes (6 mm) for two cables

3

Motor size 

D

 Cable glands 3 x M16

used: 3 x Seal insert for cables with 4...10 mm outer diameter
optional: 1 x Seal insert with 2 boreholes (5 mm) for two cables

4

Status LED

5

Connection control system

6

Cable entry points with plastic fastener

7

Connection Relays

8

Voltage supply

9

Slot for AM auxiliary module (

add-on

 module function)

10

Slot for AM-STICK-WB

Procedure:

1. Remove the cover from the controller housing for the connection.
2. All 3 cable entry points are in a sealed condition at delivery. Remove plastic fastener if necessary, 

and insert enclosed cable glands, entry points that are not used must remain sealed!

3. Insert and connect lines correctly (note the respective connection diagram).
4. Attach cover of controller housing again carefully in correct position before start-up.

Attention!

The seal of the end cap can adopt the contour of the stator 
bushing in time.
Therefore mount the cover on the same motor that it was re-
moved from to achieve maximum tightness.

Do not mix the covers!

Attention!

Temperatures up to 80 

°

C can be present on the controller housing.

To connect, always use heat resistant wires or, as an alternative, silicon tubes.

Only use lines which can guarantee a permanent seal around the cable glands (pressure-resistant, 
dimensionally-stable, round-centred jacket; e.g. by means of gusset 

lling)! Lines with 

lling 

eece 

are not permissible because moisture can penetrate due to the capillary effect!

Make absolutely sure that different connections do not come into contact (e.g. by splaying or loose 
connecting wires).

Quick Start Guide 

ECblue BASIC-MODBUS, ECblue BASIC

Electrical installation

L-BAL-F078-GB 2024 Index 005

Part.-No. 00706648-GB

11/32

Содержание ECblue BASIC-MODBUS

Страница 1: ...lue BASIC Motor sizes D 116 G 152 EC fans and motors with highest ef ciency Quick Start Guide Keep for reference Detailed Assembly instructions on www ziehl abegg com L BAL F078 GB 2024 Index 005 Part...

Страница 2: ...of centrifugal fans 9 4 4 Mounting the motor 9 5 Electrical installation 10 5 1 Version with connection cables 10 5 2 Version without connection cables 11 5 2 1 Assembly notes for cable glands 13 5 3...

Страница 3: ...th the quality mark see rating plate please note the related speci cations depending on the application location 1 2 Structure of the short operating instructions Attention This Quick Start Guide cont...

Страница 4: ...The controller housing may only be removed or opened when the power line has been switched off and a period of three minutes has elapsed since switching it off Attention During commissioning unexpect...

Страница 5: ...er use Improper use reasonably foreseeable misuse Conveyance of aggressive and explosive gaseous media Use in areas at risk of explosion for conveying gas mist vapours or mixtures of the above Transfe...

Страница 6: ...le ambient temperature Corrosion is possible at the cutting edges on sendzimir galvanised parts 3 2 Functional description ECblue stands for EC fans and motors with maximum ef ciency Highly ef cient e...

Страница 7: ...dly way in accordance with the respective national legal stipulations Separate the materials by type and in an environmentally friendly way If necessary commission a specialist company with the waste...

Страница 8: ...class 8 8 or A2 70 stainless steel to EN ISO 4014 and provide with suitable screw locking Permissible tightening torques MA Motor size D D G Thread size M6 M8 M10 Special application with 5 pitch Prop...

Страница 9: ...m Screw penetration 1 5 x d 1 5 x d When using screws with different friction values or strength classes different tightening torques may be necessary 4 4 Mounting the motor Motors design MK Fastening...

Страница 10: ...ng and connection assignment of the connecting leads may vary depending on the version Read the following chapter Version without connection cables for a new connection to the terminals in the termina...

Страница 11: ...at delivery Remove plastic fastener if necessary and insert enclosed cable glands entry points that are not used must remain sealed 3 Insert and connect lines correctly note the respective connection...

Страница 12: ...section rigid min 0 2 mm2 0 2 mm2 0 2 mm2 Conductor cross section rigid max 10 mm2 1 5 mm2 1 5 mm2 Conductor cross section exible min 0 2 mm2 0 25 mm2 0 2 mm2 Conductor cross section exible max 6 mm2...

Страница 13: ...n the collar to the speci ed torque with a suitable torque wrench Insert the cable through the cable gland into the housing Fit the union nut by hand and tighten slightly Tighten the union nut to the...

Страница 14: ...grease dust or other impurities Use of a damaged cable is not allowed Two lines may only be fed through one cable gland with the sealing insert for two lines When using the seal insert for two cables...

Страница 15: ...ary module with universal control function or for integration into different networks X With AM MODBUS auxiliary module possible 5 4 Connection diagrams Note the following information and select the c...

Страница 16: ...ng Addressing MODBUS RS 485 PORT 1 PORT 2 3 0 1 Aus Ein Off On 1 Line voltage see rating plate 2 Relay output K1 for fault reporting factory function max contact load AC 250 V 2 A During operation the...

Страница 17: ...Ein Off On 1 Line voltage see rating plate 2 Relay output K1 for fault reporting factory function max contact load AC 250 V 2 A During operation the relay is energised i e the connections 13 and 14 a...

Страница 18: ...losed according to the suitable installation position 6 Connection data complies with the speci cations on the rating plate During start up check the following 1 Check the direction of rotation see ro...

Страница 19: ...vices from version 11 onwards In a hard wired system wireless communication is primarily designed to provide a second interface for communicating with the device e g for con guration and diagnostics T...

Страница 20: ...accessible position and make sure that clear assignment to the relevant product is possible This enables you to guarantee that even if the rating plate is covered up e g due to the installation situat...

Страница 21: ...ssary open the Settings area with the gear wheel symbol 3 Switch on the line voltage to the fan frequency converter in compliance with the safety instruc tions 4 Activate the Bluetooth connection on t...

Страница 22: ...ctivate it if necessary 6 ZAset then starts searching for devices in range and adds compatible devices to a list 7 Brie y tap the desired device in the list to select it ZAset Mobile then immediately...

Страница 23: ...omatically opens to link with the serial number If a binding already exists you have to enter the PIN see second stage The serial number can either be entered manually by reading it off and entering i...

Страница 24: ...to prevent unauthorised access 9 If required enter a name of your choice alias Example 01_ECblue Quick Start Guide ECblue BASIC MODBUS ECblue BASIC AM STICK WB L BAL F078 GB 2024 Index 005 Part No 007...

Страница 25: ...tion the colour of the Bluetooth symbol changes from red to green 11 Actual values on Dashboard when connection is established successfully Quick Start Guide ECblue BASIC MODBUS ECblue BASIC AM STICK...

Страница 26: ...address identi cation etc 4 Error history 5 Parameter 6 back to Dashboard 7 Analysis 8 Speed control by variable Information Please observe the additional information in the app documentation and the...

Страница 27: ...ediate circuit overvoltage 9 x 1 Cooling down period power module 10 x 0 Communication fault 11 x 0 Error motor start 12 x 0 Line voltage too low 13 x 0 Line voltage too high 14 x 0 Error peak current...

Страница 28: ...nt temperature valid for the respective fan Operation below 25 C as well as partial load operation for refrigeration applications is only possible with special bearings for refrigeration applications...

Страница 29: ...ic current in accordance with EN 61000 3 2 are guaranteed For 3 types According to EN 61000 3 2 see Assembly instructions Electrical installation EMC compatible installation Harmonics current for 3 ty...

Страница 30: ...electrical equipment of machines Part 1 General requirements EN ISO 12100 2010 Safety of machinery General principles for design Risk assessment and risk reduction EN ISO 13857 2008 Safety of machine...

Страница 31: ...he EC Machinery Directive K nzelsau 03 09 2018 location date of issue ZIEHL ABEGG SE Dr W Angelis Technical Director Air Movement Division name function ZIEHL ABEGG SE Dr D Kappel Deputy Head of Elect...

Страница 32: ...tp www ziehl abegg com 9 4 Service information If you have any technical questions while commissioning or regarding malfunctions please contact our technical support for control systems ventilation te...

Отзывы: