INSALLATION / OPERATION
22
OPERATION
WARNING - Transport width is exceeded!
Impact: Material damage
➢
Levelling discs for road transport
Before commissioning
Lubricate all lubrication nipples
Test all screws and nuts for their security and tighten if necessary
Fig. 7
Parking supports
The seedbed combination can be parked both
folded out and folded in.
Before parking, the feet must be brought into the
parking position (upper holes, see fig.).
After hitching, the feet must be returned to the
working/transport position to avoid damage.
Fig. 8
Tine field and working depth
The tine field can be equipped with curved tines for
lighter soils, or with straight tines for heavy or wet
soils.
The working depth of the tines is set by repositioning
the locking pin. The working depth can be changed
in steps of about 1 cm.
- Insert the locking pin into the desired hole of the
adjustment raster.
- Insert the second locking pin as high as possible
below the beam in the adjustment raster to prevent
the tines from moving upwards and to ensure a con-
stant working depth.
- In order to protect the tines in very stony soils, the
tine field should not be fixed in place and should be
able to move out of the way.