Throttle Testing
TRAIN-157 Rev.B 6/01
Page 42
G)Turn power ‘On’ to the CruiseCommand Processor and take com-
mand at any remote station.
H)Record the DC Voltage at this time. The measurement should be 7
- 9% of the voltage recorded in step F). Refer to Figure 36:. If the
DC Voltage is off slightly, it may be adjusted using the Throttle
Minimum "
E2
" Function.
I) Move the Control Head lever to the Full Throttle position while
depressing the Transfer Button (Throttle Only Mode).
J) The measurement should be 91 - 93% of the voltage recorded in
step F). Refer to Figure 37:. If the voltage is off slightly, it may
be adjusted using the Throttle Maximum "
E3
" Function.
K)Return the Control Head lever to the Neutral/ Idle position and
turn power ‘Off’ to the Processor.
L) Remove the Test Unit and plug the Throttle Harness back into the
Processor’s Throttle Socket.
Figure 37: Dwg 11653-H
Содержание CruiseCommand 785CE
Страница 71: ...APPENDIX A 1...
Страница 72: ......
Страница 74: ...Appendix A 7 01 Page 2...
Страница 77: ...Page 5...
Страница 78: ...Page 6...
Страница 82: ...Page 10...
Страница 84: ...Page 12...
Страница 86: ...Page 14...
Страница 87: ...Page 15 Deutsch Connector Assembly...
Страница 88: ...Page 16...
Страница 89: ...Page 17...
Страница 90: ...Page 18...
Страница 94: ...Page 22...
Страница 97: ...APPENDIX B 1...
Страница 98: ......
Страница 150: ......
Страница 151: ...APPENDIX C 1...
Страница 152: ......
Страница 153: ...Page 3 Drawing 11748 Single Screw Two Stations...
Страница 154: ...Page 4...
Страница 155: ...Page 5 Drawing 11746 Single Screw Two Pluggable Stations...
Страница 156: ...Page 6...
Страница 157: ...Page 7 Drawing 11747 Twin Screw Two Stations...
Страница 158: ...Page 8...
Страница 159: ...Page 9 Drawing 11745 Twin Screw Two Pluggable Stations...
Страница 160: ...Page 10...