Throttle Testing
TRAIN-157 Rev.B 6/01
Page 36
2.1 DC V
OLTAGE
A)Ensure power is removed from both the Engine Electronics and
the CruiseCommand Processor.
B)Disconnect the Throttle Harness from the Throttle Socket on the
Processor.
C)Insert the Test Unit between the Throttle Socket and the Throttle
Harness as shown in Figure 29:, page 35
D)Set-up a Multi meter to measure DC Volts and plug the leads into
the Test Unit.
E) Turn Power ‘On’ to the Processor and take command at any
Remote Station.
F) The appropriate Idle Voltage for the application should be mea-
sured at this time. If the voltage is off slightly, it may be adjusted
using the Throttle Minimum "
E2
" Function.
G)Move the Control Head lever to the Full Throttle position while
depressing the Transfer Button (Throttle Only Mode).
H)The appropriate Full Throttle voltage for the application should be
measured as shown in Figure 30:. If the voltage is off slightly, it
may be adjusted using the Throttle Maximum "
E3
" Function.
Figure 30: Dwg 11653-B
Содержание CruiseCommand 785CE
Страница 71: ...APPENDIX A 1...
Страница 72: ......
Страница 74: ...Appendix A 7 01 Page 2...
Страница 77: ...Page 5...
Страница 78: ...Page 6...
Страница 82: ...Page 10...
Страница 84: ...Page 12...
Страница 86: ...Page 14...
Страница 87: ...Page 15 Deutsch Connector Assembly...
Страница 88: ...Page 16...
Страница 89: ...Page 17...
Страница 90: ...Page 18...
Страница 94: ...Page 22...
Страница 97: ...APPENDIX B 1...
Страница 98: ......
Страница 150: ......
Страница 151: ...APPENDIX C 1...
Страница 152: ......
Страница 153: ...Page 3 Drawing 11748 Single Screw Two Stations...
Страница 154: ...Page 4...
Страница 155: ...Page 5 Drawing 11746 Single Screw Two Pluggable Stations...
Страница 156: ...Page 6...
Страница 157: ...Page 7 Drawing 11747 Twin Screw Two Stations...
Страница 158: ...Page 8...
Страница 159: ...Page 9 Drawing 11745 Twin Screw Two Pluggable Stations...
Страница 160: ...Page 10...