28 V00 Installation and operating instructions
5.4.3 Earthing protection
If required, the grounding terminal at the right bottom of the inverter can be used to
connect a second protective conductor or as equipotential bonding with a screwdriver
(Type: T25), torque: 2.5Nm.
Information on earthing components is shown in the table below:
Information on grounding components
:
No.
Position
Description
1
M5 screw
Delivered with the inverter
2
OT terminal (M5)
Provided by installer
3
Yellow/green earthing cable
10-25mm
2