Installation and Operating Instructions V04 20
Procedure:
1.
Switch off the ACcircuitbreaker and secure it against reconnection.
2.
Loosen the 4 screws ofthe cover using a screwdriver (T25) andremove the cover.
3.
Strip the AC cable’s outer sheath 120 mm.
Shorten L and N by 10 mm each.
Strip the insulation of L, N, and PE conductors by 12 mm.
4.
Insert the conductor into the suitable ferruleacc. to DIN 46228-4 and crimp the
contact.
5.
Route the AC cable into the inverter through the cable gland.
If necessary, slightly loosen the swivel nut of the cable gland.
loosen the screws of the cover
During loosening the screws of the cover, it is not necessary to take off the
screws and conical spring washers, which can remain on the cover and will not
fall off.