5.

 

If the connector’s clamping bracket was locked 
prematurely (refer to step 3), it can be opened 
using a 3.5mm flat bladed screw driver 

 

 
Equipotential Bonding 

 

Equipotential bonding is required for all parts of the solar array. The cross section of each earth 
conductor should be equal or greater than that of the DC cable conductor size. The earth cable 
must be continuous from the array to the earth bar in the switchboard the inverter is connected to. 
Run all conductors bundled in the same conduit. 
solarcity policy is that the earth conductor must be bonded to every rail in each row or column of 
the array using the supplied proprietary earth lugs. 

 

 
Roof Penetration 

Subject to the roof type the PV array is installed on, an appropriate roof penetration kit must be 
used.  Roof penetrations must always be located under the solar panels where an attic space is 
accessible for the cable run. 
Where cable(s) pass through the roof penetration, it must be protected using rigid conduit. 

 
Rooftop Isolator 

A rooftop isolator is 

not

  required. Refer to section 4.4.1.6 of AS/NZS 5033:2014 for details

The 

output cabling of the array must be labelled as follows: 
“The inverter DC isolator must be in ‘Off’ position before isolating the PV array”  
 

5.3.2

 

TS4-R-O Optimiser installation  

 

Where strings are split across two roofs with different orientations or roofs with different pitch, 
optimisers must be partially deployed in the string (see 5.1.2). solarcity will specify the design and 
optimiser deployment prior to the installation. Follow the below instructions to retrofit optimisers 
to the module. 

 

1.

 

Looking at the back of the panel, push 
the optimisers into the upper right 
corner at the backside of the module 
frame as depicted. Make sure the unit is 
pushed all the way in. 

 

Содержание Zeverlution 2000S

Страница 1: ...2 BEHAVIOURAL 2 SAFETY 2 INSTALLATION PROCEDURE 3 String Design Guidelines 3 5 1 1 String Layout Without Optimisers 3 5 1 2 String Layout with Optimisers 3 5 1 3 Shading 3 5 1 4 Maximum String Voltage...

Страница 2: ...d electrical part of the inverter installation instruction The focus of this SOP lies on the physical installation of Zeverlution 2000s and Zeverlution 4000 inverters and any associated switch gear DC...

Страница 3: ...4000 inverters and for arrays with or without optimisers the minimum and maximum strings lengths are as follows minimum number of modules per string is 3 maximum number of modules per string is 10 5 1...

Страница 4: ...systems with a peak output between 1 5kWp and 3kWp 6 to 10 modules where the peak performance rating per panel at STC does not exceed 295Wp For further details please refer to the Zeverlution 2000s da...

Страница 5: ...et which is used to fix the units to a suitable wall Please refer to the solarcity wall cladding guide for suitable wall claddings to mount the inverter on 1 Use the wall bracket as a drilling templat...

Страница 6: ...ble The inverter must not be installed in a location where it is exposed to direct sunlight Wiring 5 3 1 DC Wiring All wiring must be installed and sized in accordance with the relevant requirements o...

Страница 7: ...ted as per AS5033 The table below shows the maximum cable length one way between array and inverter with JA 290W panels allowing for a 2 voltage drop Panels per string 3 4 5 6 7 8 9 10 Max cable lengt...

Страница 8: ...to maintain the correct polarity the connectors are also marked with and symbols The steps below explain how to assemble SUNCLIX connectors Ensure that the array cable is de energized before installin...

Страница 9: ...lled on an appropriate roof penetration kit must be used Roof penetrations must always be located under the solar panels where an attic space is accessible for the cable run Where cable s pass through...

Страница 10: ...mm which is usually too short for leapfrog wiring Please use standard daisy chain wiring for all optimised array sections 5 3 3 AC Wiring The inverter is connected to the switchboard using double insu...

Страница 11: ...S 5033 2014 and follow the instructions outlined in the standard Attached to this document you ll find a commissioning sheet which you may use to record the test results A completed and signed copy of...

Страница 12: ...To confirm wait for approximately 10 seconds until the inverter automatically returns to the initial display showing the error code Connecting the inverter to the Internet The inverter needs to be co...

Страница 13: ...before setting up the WIFI connection 2 With the inverter powered up use a smartphone or laptop to search for the inverter s wireless access point This will display as ZEVERSOLAR XXXX Connect to this...

Страница 14: ...omer s wireless network 6 After approximately one minute the inverter should connect to the customers wifi network and the status indicator on the wireless page will show a green tick 7 Take a photo o...

Страница 15: ...rnet cable through the comms gland on the bottom of the inverter ensuring that the cable entry is sealed from dust and moisture 3 The inverter automatically obtains an IP address from the router via D...

Страница 16: ...rod MEN link removed Earth continuity 2 Main earth conductor to array frame Polarity check and PV open circuit voltage Polarity Voltage V String 1 String 2 if applicable PV array at switch disconnect...

Отзывы: