General Operation
4.10
9. Record this measurement (this is the measurement
referred to as
M2
).
10.Subtract the second measurement (
M2
) from the first
measurement (
M1
).
Example:
The total sag is 1.77 in (45 mm). Refer to the chart below
for the correct sag. If the sag is not correct, the spring
preload should be adjusted.
Measurement
Operator
Value
M1
4.13 in (105 mm)
M2
-
2.36 in (60 mm)
Sag
=
1.77 in (45 mm)
MODEL
SAG
S & SR
1.77 in (45 mm)
DS & DSR
2.32 in (59 mm)
Zero Owner's Manual (S and DS).book Page 10 Friday, October 30, 2015 11:13 AM
Содержание 2016 ZERO DSR
Страница 2: ...Zero Owner s Manual S and DS book Page 2 Friday October 30 2015 11 13 AM...
Страница 6: ...Zero Owner s Manual S and DS book Page 4 Friday October 30 2015 11 13 AM...
Страница 14: ...General Information Zero Owner s Manual S and DS book Page 8 Friday October 30 2015 11 13 AM...
Страница 15: ...General Information Zero Owner s Manual S and DS book Page 9 Friday October 30 2015 11 13 AM...
Страница 24: ...Controls and Components Left Side View Zero Owner s Manual S and DS book Page 4 Friday October 30 2015 11 13 AM...
Страница 28: ...Controls and Components Dash Overview Zero Owner s Manual S and DS book Page 8 Friday October 30 2015 11 13 AM...
Страница 44: ...Notes Zero Owner s Manual S and DS book Page 24 Friday October 30 2015 11 13 AM...
Страница 62: ...Notes Zero Owner s Manual S and DS book Page 18 Friday October 30 2015 11 13 AM...
Страница 72: ...Notes Zero Owner s Manual S and DS book Page 10 Friday October 30 2015 11 13 AM...
Страница 116: ...Notes Zero Owner s Manual S and DS book Page 18 Friday October 30 2015 11 13 AM...
Страница 136: ...Notes Zero Owner s Manual S and DS book Page 12 Friday October 30 2015 11 13 AM...
Страница 144: ...Notes Zero Owner s Manual S and DS book Page 4 Friday October 30 2015 11 13 AM...
Страница 146: ...Zero Owner s Manual S and DS book Page 1 Friday October 30 2015 11 13 AM...