background image

 

GetFace IP 

Flush installation - Frame - 3 modules 
ZVP-FFRA3 

Assembly instructions

 

 

© Zennio Avance y Tecnología S.L. 

Ed. 1 

For more info 

www.zennio.com

 

Page 

1

 / 

2

 

Note:

 This product must be purchased together with the frame ZVP-FBOX3 

ASSEMBLY OF FRAME (ONE-COLUMN LAYOUT) 

 1  

Please  remove  the  blind  panels  and  the  additional  modules.  After 

that,  assemble  the  additional  module  enclosures,  opening  the  gaps 
previously. Then, fix the assembly using the supplied parts and screws. 
Move  the  microphone  to  the  lower  enclosure  and  place  the  metallic 
parts supplied with the frame. 

 

 2  

Place  the  assembly  inside  the  flush-mount  box  and  recover  the 

cables. Fix the module with the screws (included). 

 

 3  

Connect the cables to the basic unit and interconnect the additional 

modules with the bus as shown in the schema.

 

 

 4 

 

Fix the blind panel (or additional modules that remain in sight) with 

the supplied screws and put the labels with captions next to the buttons.

 

 

 

 5  

Place the frame. 

 

 6  

Fix the frame by using the supplied Allen key. 

 

 

 

Отзывы: