ZEISS
9 Technical Data and Conformity | 9.5 Installation Requirements
9.5 Installation Requirements
Info
For a complete list of the installation requirements, refer to the document Installation Require-
ments.
Location
Requirements
Parameter
Requirement
Installation site
Exclusively inside buildings
Recommended
room size
Min. 3.5 m × 5.0 m × 2.3 m
Service area
Min. 1.0 m at each side
Entrance
Min. 0.8 m wide
Hallways
Min. 1.0 m wide
Corners
Min. 1.2 m wide
Transport ways
Free of staircases
Installation cate-
gory
II
Floor stability
> 1000 kg/m
2
Exhaust Line
An exhaust line is required to remove the waste gas of the pre-vacuum pump and to transmit it to
the outside.
Cooling Water
Major components of the microscope such as electron-optic lenses, parts of the electronics and
the turbo molecular pump are water-cooled. Any cooling solution has to fulfil the following re-
quirements.
Parameter
Requirement
Water flow rate
60–70 l/h
Pressure
Adjustable up to 3 bar
Water tempera-
ture
20–22 °C
Stability
0.5 °C/10 min
Heat dissipation
1 kW
Connection hose
6 mm inside diameter. Two pieces 10 m each are delivered.
Nitrogen
Gaseous dry nitrogen is used to vent the specimen chamber during specimen exchange. The nitro-
gen can be taken either from a gas cylinder or from an in-house supply system.
Parameter
Requirement
Flow rate
Approx. 40 l/min for ventilation of specimen chamber with chamber
door open
Pressure
0.30–0.35 MPa (3.0–3.5 bar)
Quality
4.6 with nitrogen content > 99.996 %
Connection hose
6 mm inside diameter. 10 m are delivered with the microscope.
Instruction Manual ZEISS GeminiSEM series | en-US | Rev. 2 | 349500-8138-000
151