background image

DuraMax Installation site requirements

5

General

Safety during transport and installation

Requirements for safe working conditions:

The hoisting equipment and lifting tackle (e.g. rope) used, must be in proper working order and checked in accor-
dance with the applicable standards and directives.

Personnel operating such equipment must be trained in the required work and be able to safely operate this hoist-
ing equipment.

The hoisting equipment must be designed to accommodate the size and weight of the transported material.

Delivery package

The CMM is comprised of the following components:

Coordinate measuring machine (CMM)

Controller (integrated)

Control console

Base (optional)

Data system and peripheral devices (optional)

Note on data systems

NOTE

Data systems for coordinate measuring machines are CMM-based systems and cannot be compared
to computer systems for office applications. To ensure trouble-free operation of the coordinate
measuring machine, you must only use computer systems tested and approved by ZEISS.

If the customer provides the computer systems, the computers must first be tested and approved by
ZEISS. The customer is responsible for any additional costs.

Coordinate measuring machine parameters

Category

Parameter

Overvoltage category

II

Degree of contamination

2

Protection class

1

Содержание DuraMax

Страница 1: ...DuraMax Installation site requirements Coordinate measuring machine CMM...

Страница 2: ...DuraMax Installation site requirements 2020 12 01 61221 3011202...

Страница 3: ...n 9 General protection measures 9 Doorway dimensions in the measuring lab 9 Room height of the measuring lab 9 Floor 9 Floor plan 9 Floor load 9 Vibrations at the installation site 9 Environmental con...

Страница 4: ...standard base 16 DuraMax with ShopFloor base 17 Securing the shopfloor base 18 DuraMax measuring table with threaded holes 19 Limit curves of permissible floor vibrations at the installation site 20...

Страница 5: ...s comprised of the following components Coordinate measuring machine CMM Controller integrated Control console Base optional Data system and peripheral devices optional Note on data systems NOTE Data...

Страница 6: ...lifted below the center of gravity label the cargo may tip over and be ir reparably damaged The center of gravity of the packaged CMM is located outside of the center of the shipping pallet and is lab...

Страница 7: ...ctive cover at its final installation site for at least 24 hours before the cover is opened or removed This is the only way to prevent rust damage due to condensation Only a ZEISS service technician o...

Страница 8: ...located when properly secured with transport braces and under the supervision of our system specialists Preparatory measures The measuring table must be clear Remove probe The control console and the...

Страница 9: ...pFloor base for the dimensions and information Floor plan If you create a floor plan on a CAD system you can produce a DXF and or a DWG file containing the dimensions If you require further assistance...

Страница 10: ...d in VDI VDE 2627 Environmental conditions for operational readiness The following conditions must be met to properly operate the coordinate measuring machine Permissible humidity without condensation...

Страница 11: ...EMC The CMM is a class A device and may cause radio interference in living areas In such cases opera tors may be required to take adequate measures at their own expense For peripheral devices e g comp...

Страница 12: ...recommend installing the connection in accordance with the following diagram Note Comply with applicable national regulations L N PE C16A Customer installation of local voltage suggested Circuit brea...

Страница 13: ...equires an Internet connection An Internet connection is not required for the installation of the CMM Network topology System components are networked during start up by a ZEISS service engineer or a...

Страница 14: ...e g distance to the wall and required connections can be seen in the drawing on the next page Weight Value CMM kg 350 Workpiece max kg 100 Floor load Mean pressure on the support surfaces Please chec...

Страница 15: ...power supply for data system e g computer printer monitor 7 Controller 8 Additional housing on base only with rotary table option 9 Control console tray removable 10 Table optional for data system Mi...

Страница 16: ...plug screws are included with delivery to anchor the standard base to the floor foundation The plug screws must be anchored into the foundation There is a risk of tipping if not properly anchored If...

Страница 17: ...or monitor keyboard and mouse 6 Control console tray removable 7 Controller 8 Additional housing on base only with rotary table option Minimum distance for personal safety and service 600 mm for perma...

Страница 18: ...965 Position of the boreholes for the shopfloor base top view M 1 10 dimensions in millimeters Three fastening brackets 1 and three plug screws are included with delivery for fastening the shopfloor...

Страница 19: ...allation site requirements 19 DuraMax measuring table with threaded holes 494 x 494 0 100 0 1 100 0 1 100 0 1 100 0 1 200 0 1 200 0 1 200 0 1 200 0 1 0 M10 25x Measuring table M 1 4 all dimensions in...

Страница 20: ...s the limit values must be compared with the square mean RMS value of the measured floor vibrations If there are any pulse shaped floor vibrations e g caused by a nearby press the limit values must be...

Страница 21: ...DuraMax Installation site requirements 21...

Страница 22: ...DuraMax Installation site requirements 2020 12 01 61221 3011202...

Отзывы: